Po NNX11CE33PGRAINFLOW DYNAMICS INC
Overview
Award facts
- Period of performance
- Apr 23, 2012 to Sep 29, 2011
- Ended
- Modifications
- 5
- Latest action Apr 23, 2012
- Contract type
- Po
- PIID NNX11CE33P
Description of requirement
NASA NEEDS SIMULATION TOOLS CAPABLE OF PREDICTING THE BEHAVIOR OF REGOLITH IN PROPOSED EXCAVATION, TRANSPORT, AND HANDLING OR SAMPLE ACQUISITION SYSTEMS. FOR ENGINEERING-SCALE PROBLEMS FE ANALYSES UTILIZING SOIL-MECHANICS-BASED CONSTITUTIVE MODELS HAVE LONG BEEN UTILIZED IN CIVIL ENGINEERING TO EVALUATE STRESSES AND DEFORMATIONS UP TO FAILURE, EVEN INCLUDING SOME PLASTIC FLOW. THE EXTREMELY LARGE STRAINS, BULKING AND RECOMPACTION BEHAVIOR IN EXCAVATION, HOPPER FLOW AND REGOLITH PROCESSING, HOWEVER, ARE GENERALLY BEYOND THE CAPABILITY OF MOST FE CODES. MESH-FREE METHODS OFFER AN ATTRACTIVE OPTION ESPECIALLY WHEN COUPLED WITH CRITICAL-STATE SOIL-MECHANICS BASED CONSTITUTIVE MODELS ALLOWING UNLIMITED SHEAR DEFORMATION AND FLOW. THIS PHASE-1 PROJECT WILL ENHANCE A NEW MESH-FREE SPH-BASED SIMULATION MODEL, INITIATED AS PART OF AN EARLIER SBIR PROJECT, TO DEMONSTRATE ITS POTENTIAL TO MEET NASA'S NEED FOR A ROBUST SIMULATION TOOL FOR REGOLITH MANIPULATION AND FLOW. ENHANCEMENTS INCLUDE PROVIDING SMOOTH TRANSITIONS AS NEW FREE SURFACES ARE CREATED, PARALLELIZED ALGORITHMS SO THAT HIGH RESOLUTION CAN BE MAINTAINED AS THE PHYSICAL SCALE OF THE PROBLEMS IS INCREASED TO REALISTIC ENGINEERING SIZES, AND INCLUSION OF REALISTIC COHESION IN THE CRITICAL-STATE SOIL-MECHANICS CONSTITUTIVE MODEL. THE LARGE FRACTION OF VERY FINE PARTICULATES IN LUNAR AND MARTIAN REGOLITHS (E.G., PARTICLES<20-MICRONS) PRECLUDES PARTICLE-SCALE DEM MODELS FROM EVER BEING ABLE TO BOTH MAINTAIN PARTICLE-SCALE FIDELITY AND SIMULATE ENGINEERING-SCALE PROBLEMS. UTILIZATION OF LARGER-THAN-NATURE 'CALCULATIONAL PARTICLES' IN DEM CODE LEADS TO NEW CHALLENGES CALIBRATION OF THOSE 'PARTICLES' SO THAT THE CALCULATIONAL MATERIAL WILL REPRODUCE THE CONSTITUTIVE BEHAVIOR OF THE ORIGINAL GRANULAR ASSEMBLY. THE MESH-FREE SPH MODEL DEVELOPED HERE HAS THE POTENTIAL TO BECOME A NEW ROBUST SIMULATION TOOL TO ADDRESS NASA'S CHALLENGING REGOLITH MANIPULATION AND FLOW PROBLEMS.
Dates and value
- Award date
- Signed on Feb 18, 2011
- Potential end of performance
- Sep 28, 2011
Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Apr 23, 2012. View on USAspending · Recipient on SAM.gov
Recipient
Business types and certifications
As represented in SAM.gov at the time of the action.
Subcontracting network
The prime, the subcontractors on this award, and their own subcontractors.
Agency and place
Awarding and funding
- Awarded by
- National Aeronautics and Space Administration
- NASA SHARED SERVICES CENTER
- Funded by
- National Aeronautics and Space Administration
- GLENN RESEARCH CENTER
Place of performance
- Place of performance
- Livermore, Alameda County, California 94550-5928 United States Of America
- Congressional district (place of performance)
- CA-14As reported at the time of the action
Classification and competition
Classification
- Product or service (PSC)
- AR11R&D- SPACE: AERONAUTICS/SPACE TECHNOLOGY (BASIC RESEARCH) (research and development)
Competition
- Extent competed
- Full and open competition after exclusion of sourcesD
- Solicitation procedures
- Negotiated proposal/quoteNP
- Set-aside
- Small business set aside - totalSBA
- Contract pricing
- Firm fixed priceJ
- Offers received
- 4
Solicitation and notices
- Solicitation ID
- SBIR11PH01(as reported)
Contract details
- Subcontracting plan
- Plan not requiredB
- Major program
- Enhanced mesh-free simulation of regolith flow
- Service Contract Act labor standards
- No
- Government-furnished property
- Transaction does not use GFE/GFPN
- Bundled requirement
- Not a bundled requirementD
- Consolidated requirement
- No
- Undefinitized action (terms not final)
- No
- Performance-based service acquisition
- Yes - service where PBA is used.Y
Linked notices
Notice | Notice ID | Type | Link | Posted |
|---|---|---|---|---|
Transaction history
Modification history
- Base award
- Feb 18, 2011Base obligation at award: $8,334
- Latest action
- Apr 23, 2012 — Other administrative actionModification 5; administrative: no change in scope or value
- Latest substantive action
- Jul 27, 2011 — Supplemental agreement (within scope)Modification 4
- Latest funding action
- Jun 7, 2011 — Funding onlyModification 3; obligation change +$54,081; funding only: changes obligations, not scope
- Actions by type
- Base award1
- Funding only3
- Supplemental agreement (within scope)1
- Other administrative action1
Similar awards
PIID | Match | Awardee |
|---|---|---|
All contract data
All contract data
Every other field reported for this award, as of its latest reported action
Competition
- Evaluation preference
- No preference used
- Simplified procedures for commercial items
- No
Pricing and financing
- Paid by purchase card
- No
Socio-economic and policy
- Recovered materials and sustainability
- No clauses included and no sustainability includedC
- EPA-designated product
- Not requiredE
- Research program (SBIR/STTR)
- Small business innovation research program phase i actionSR1
- Walsh-Healey Act (materials and supplies)
- No
- Construction wage rates (Davis-Bacon)
- No
Place and origin
- Domestic or foreign entity
- U.S. owned businessA
- Place of manufacture
- Not a manufactured end productC
Structure
- Award or IDV
- Award
- Award type
- PoB
- Awarding agency code
- 8000
- Awarding sub-tier code
- 8000
- Contracting office code
- NSSC0
- Transactions recorded under this award key
- 6
Funding
- Funding agency code
- 8000
- Funding sub-tier code
- 8000
- Funding office code
- GRC00