GovChime
AWARDPOSmall business

Po NNX11CE33PGRAINFLOW DYNAMICS INC

Overview

Award facts

Period of performance
Apr 23, 2012 to Sep 29, 2011
Ended
Modifications
5
Latest action Apr 23, 2012
Contract type
Po
PIID NNX11CE33P

Description of requirement

NASA NEEDS SIMULATION TOOLS CAPABLE OF PREDICTING THE BEHAVIOR OF REGOLITH IN PROPOSED EXCAVATION, TRANSPORT, AND HANDLING OR SAMPLE ACQUISITION SYSTEMS. FOR ENGINEERING-SCALE PROBLEMS FE ANALYSES UTILIZING SOIL-MECHANICS-BASED CONSTITUTIVE MODELS HAVE LONG BEEN UTILIZED IN CIVIL ENGINEERING TO EVALUATE STRESSES AND DEFORMATIONS UP TO FAILURE, EVEN INCLUDING SOME PLASTIC FLOW. THE EXTREMELY LARGE STRAINS, BULKING AND RECOMPACTION BEHAVIOR IN EXCAVATION, HOPPER FLOW AND REGOLITH PROCESSING, HOWEVER, ARE GENERALLY BEYOND THE CAPABILITY OF MOST FE CODES. MESH-FREE METHODS OFFER AN ATTRACTIVE OPTION ESPECIALLY WHEN COUPLED WITH CRITICAL-STATE SOIL-MECHANICS BASED CONSTITUTIVE MODELS ALLOWING UNLIMITED SHEAR DEFORMATION AND FLOW. THIS PHASE-1 PROJECT WILL ENHANCE A NEW MESH-FREE SPH-BASED SIMULATION MODEL, INITIATED AS PART OF AN EARLIER SBIR PROJECT, TO DEMONSTRATE ITS POTENTIAL TO MEET NASA'S NEED FOR A ROBUST SIMULATION TOOL FOR REGOLITH MANIPULATION AND FLOW. ENHANCEMENTS INCLUDE PROVIDING SMOOTH TRANSITIONS AS NEW FREE SURFACES ARE CREATED, PARALLELIZED ALGORITHMS SO THAT HIGH RESOLUTION CAN BE MAINTAINED AS THE PHYSICAL SCALE OF THE PROBLEMS IS INCREASED TO REALISTIC ENGINEERING SIZES, AND INCLUSION OF REALISTIC COHESION IN THE CRITICAL-STATE SOIL-MECHANICS CONSTITUTIVE MODEL. THE LARGE FRACTION OF VERY FINE PARTICULATES IN LUNAR AND MARTIAN REGOLITHS (E.G., PARTICLES<20-MICRONS) PRECLUDES PARTICLE-SCALE DEM MODELS FROM EVER BEING ABLE TO BOTH MAINTAIN PARTICLE-SCALE FIDELITY AND SIMULATE ENGINEERING-SCALE PROBLEMS. UTILIZATION OF LARGER-THAN-NATURE 'CALCULATIONAL PARTICLES' IN DEM CODE LEADS TO NEW CHALLENGES CALIBRATION OF THOSE 'PARTICLES' SO THAT THE CALCULATIONAL MATERIAL WILL REPRODUCE THE CONSTITUTIVE BEHAVIOR OF THE ORIGINAL GRANULAR ASSEMBLY. THE MESH-FREE SPH MODEL DEVELOPED HERE HAS THE POTENTIAL TO BECOME A NEW ROBUST SIMULATION TOOL TO ADDRESS NASA'S CHALLENGING REGOLITH MANIPULATION AND FLOW PROBLEMS.

Dates and value

Award date
Signed on Feb 18, 2011
Potential end of performance
Sep 28, 2011

Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Apr 23, 2012. View on USAspending · Recipient on SAM.gov

Recipient

LocationLIVERMORE, CA
UEISKAKGHZYFEM1
Business sizeSmall businessSize at award, per the contracting officer

Business types and certifications

For-profit organizationSubchapter S corporationCorporation (not tax-exempt)

As represented in SAM.gov at the time of the action.

Subcontracting network

The prime, the subcontractors on this award, and their own subcontractors.

Subaward amounts are self-reported by prime contractors to SAM.gov and appear 1 to 2 months after the work. Duplicates are removed on a best-effort basis. Totals are incomplete and not an audit. Source: USAspending.

Agency and place

Awarding and funding

Awarded by
  1. National Aeronautics and Space Administration
  2. NASA SHARED SERVICES CENTER
Funded by
  1. National Aeronautics and Space Administration
  2. GLENN RESEARCH CENTER

Place of performance

Place of performance
Livermore, Alameda County, California 94550-5928 United States Of America
Congressional district (place of performance)
CA-14As reported at the time of the action

Classification and competition

Classification

Competition

Extent competed
Full and open competition after exclusion of sourcesD
Solicitation procedures
Negotiated proposal/quoteNP
Set-aside
Small business set aside - totalSBA
Contract pricing
Firm fixed priceJ
Offers received
4

Solicitation and notices

Solicitation ID
SBIR11PH01(as reported)

Contract details

Subcontracting plan
Plan not requiredB
Major program
Enhanced mesh-free simulation of regolith flow
Service Contract Act labor standards
No
Government-furnished property
Transaction does not use GFE/GFPN
Bundled requirement
Not a bundled requirementD
Consolidated requirement
No
Undefinitized action (terms not final)
No
Performance-based service acquisition
Yes - service where PBA is used.Y

Linked notices

Notice
Notice ID
Type
Link
Posted

Transaction history

Modification history

Base award
Feb 18, 2011Base obligation at award: $8,334
Latest action
Apr 23, 2012 — Other administrative actionModification 5; administrative: no change in scope or value
Latest substantive action
Jul 27, 2011 — Supplemental agreement (within scope)Modification 4
Latest funding action
Jun 7, 2011 — Funding onlyModification 3; obligation change +$54,081; funding only: changes obligations, not scope
Actions by type
  • Base award1
  • Funding only3
  • Supplemental agreement (within scope)1
  • Other administrative action1
6 actions recorded, Feb 18, 2011 to Apr 23, 2012; each action counted once.

Similar awards

PIID
Match
Awardee

All contract data

All contract data

Every other field reported for this award, as of its latest reported action

Competition

Evaluation preference
No preference used
Simplified procedures for commercial items
No

Pricing and financing

Paid by purchase card
No

Socio-economic and policy

Recovered materials and sustainability
No clauses included and no sustainability includedC
EPA-designated product
Not requiredE
Research program (SBIR/STTR)
Small business innovation research program phase i actionSR1
Walsh-Healey Act (materials and supplies)
No
Construction wage rates (Davis-Bacon)
No

Place and origin

Domestic or foreign entity
U.S. owned businessA
Place of manufacture
Not a manufactured end productC

Structure

Award or IDV
Award
Award type
PoB
Awarding agency code
8000
Awarding sub-tier code
8000
Contracting office code
NSSC0
Transactions recorded under this award key
6

Funding

Funding agency code
8000
Funding sub-tier code
8000
Funding office code
GRC00