GovChime
AWARDPOSmall business

Po NNX11CG46PQUEST PRODUCT DEVELOPMENT CORPORATION

Overview

Award facts

Period of performance
Aug 16, 2011 to Sep 29, 2011
Ended
Modifications
5
Latest action Aug 16, 2011
Contract type
Po
PIID NNX11CG46P

Description of requirement

FOR NASA EXTENDED MISSIONS IN LOW EARTH ORBIT (LEO), MICROMETEOROID AND ORBITAL DEBRIS (MMOD) PROTECTION FOR SPACECRAFT, SPACE STATIONS AND ORBITING FUEL DEPOTS IS CRITICAL TO MISSION SAFETY. MMOD PENETRATION IS A RISK FOR SPACECRAFT AND INSTRUMENTS; SPACECRAFT DESIGNERS MUST PROVIDE PROTECTION TO MINIMIZE MMOD DAMAGE. CRYOGENIC PROPELLANTS, AND THEIR THERMAL INSULATION, ARE ALSO AN IMPORTANT PART OF NASA'S NEXT GENERATION VEHICLES. ORBITAL FUEL DEPOTS MUST PROVIDE ZERO BOILOFF CRYOPROPELLANT LOSS AND MAINTAIN FLIGHTWORTHINESS OVER EXTENDED MISSIONS IN LEO. QUEST&BALL HAVE DEVELOPED AN INNOVATIVE NEXT GENERATION MLI THAT COULD PROVIDE BOTH HIGH PERFORMANCE THERMAL INSULATION AND LIGHT-WEIGHT MMOD PROTECTION. MMOD - INTEGRATED MLI (MMOD-IMLI) USES PRECISE LAYER SPACING CONTROL FROM POLYMER SPACERS TO PROVIDE THE BASIS FOR AN ADVANCED MULTISHOCK MMOD SHIELD. MMOD-IMLI IS A NOVEL MULTI-LAYER SYSTEM USING IMLI WITH PROPRIETARY MICROMOLDED POLYMER SPACERS TO CONTROL LAYER SPACING AND SUPPORT HIGH STRENGTH NEXTEL AND KEVLAR LAYERS. IMLI HAS BEEN PROVEN TO HAVE 27% LOWER HEAT LEAK PER LAYER THAN STATE-OF-THE-ART MLI. MMOD-IMLI WILL USE SPECIFIC LAYER MATERIALS, THICKNESSES AND LAYER SPACING TO PROVIDE EXCELLENT MMOD PROTECTION. PRELIMINARY ANALYSIS INDICATES MMOD-IMLI WILL PROVIDE SUPERIOR MMOD PROTECTION THAN WHIPPLE OR STUFFED WHIPPLE SHIELDS, THE CURRENT SHIELDS USED ON THE ISS, WITH SUBSTANTIALLY LOWER MASS AND PROVIDING 95% PROBABILITY OF NO PENETRATION FOR AN ORBITAL FUEL DEPOT, WHILE ALSO PROVIDING HIGHER THERMAL INSULATION THAN AN EQUIVALENT NUMBER OF LAYERS OF CONVENTIONAL MLI. THIS PHASE I RESEARCH WILL EVALUATE MMOD PROTECTION AND THERMAL PERFORMANCE AVAILABLE FROM OUR IMLI TECHNOLOGY, DESIGN MMOD-IMLI BLANKET/SHIELDS, BUILD AND TEST AN MMOD-IMLI PROTOTYPE FOR MMOD PROTECTION USING HYPERVELOCITY IMPACT TESTS AND THERMAL PERFORMANCE VIA LN2 CALORIMETRY, COMPARE MMOD AND HEAT LEAK RESULTS TO THOSE PREDICTED, AND DETERMINE FEASIBILITY OF MMOD-IMLI.

Dates and value

Award date
Signed on Feb 18, 2011
Potential end of performance
Sep 28, 2011

Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Aug 16, 2011. View on USAspending · Recipient on SAM.gov

Recipient

LocationARVADA, CO
UEIHPUDP5F65MX3
Business sizeSmall businessSize at award, per the contracting officer

Business types and certifications

For-profit organizationFederally funded research and development centerSubchapter S corporationManufacturer of goods

As represented in SAM.gov at the time of the action.

Subcontracting network

The prime, the subcontractors on this award, and their own subcontractors.

Subaward amounts are self-reported by prime contractors to SAM.gov and appear 1 to 2 months after the work. Duplicates are removed on a best-effort basis. Totals are incomplete and not an audit. Source: USAspending.

Agency and place

Awarding and funding

Awarded by
  1. National Aeronautics and Space Administration
  2. NASA SHARED SERVICES CENTER
Funded by
  1. National Aeronautics and Space Administration
  2. KENNEDY SPACE CENTER

Place of performance

Place of performance
Arvada, Jefferson County, Colorado 80007-7570
Congressional district (place of performance)
CO-07As reported at the time of the action

Classification and competition

Classification

Competition

Extent competed
Full and open competition after exclusion of sourcesD
Solicitation procedures
Negotiated proposal/quoteNP
Set-aside
Small business set aside - totalSBA
Contract pricing
Firm fixed priceJ
Offers received
4

Solicitation and notices

Solicitation ID
SBIR11PH01(as reported)

Contract details

Subcontracting plan
Plan not requiredB
Major program
Mmod-imli: integrated thermal insulation and micro
Service Contract Act labor standards
No
Government-furnished property
Transaction does not use GFE/GFPN
Bundled requirement
Not a bundled requirementD
Consolidated requirement
No
Undefinitized action (terms not final)
No
Performance-based service acquisition
Yes - service where PBA is used.Y

Linked notices

Notice
Notice ID
Type
Link
Posted

Transaction history

Modification history

Base award
Feb 18, 2011Base obligation at award: $8,334
Latest action
Aug 16, 2011 — Supplemental agreement (within scope)Modification 5
Latest substantive action
Aug 16, 2011 — Supplemental agreement (within scope)Modification 5
Latest funding action
Jun 3, 2011 — Funding onlyModification 4; obligation change +$54,751; funding only: changes obligations, not scope
Actions by type
  • Base award1
  • Funding only4
  • Supplemental agreement (within scope)1
6 actions recorded, Feb 18, 2011 to Aug 16, 2011; each action counted once.

Similar awards

PIID
Match
Awardee

All contract data

All contract data

Every other field reported for this award, as of its latest reported action

Competition

Evaluation preference
No preference used
Simplified procedures for commercial items
No

Pricing and financing

Paid by purchase card
No

Socio-economic and policy

Recovered materials and sustainability
No clauses included and no sustainability incluC
EPA-designated product
Not requiredE
Research program (SBIR/STTR)
Small business innovation research program phase i actionSR1
Walsh-Healey Act (materials and supplies)
No
Construction wage rates (Davis-Bacon)
No

Place and origin

Domestic or foreign entity
U.S. owned businessA
Place of manufacture
Not a manufactured end productC

Structure

Award or IDV
Award
Award type
PoB
Awarding agency code
8000
Awarding sub-tier code
8000
Contracting office code
NSSC0
Transactions recorded under this award key
6

Funding

Funding agency code
8000
Funding sub-tier code
8000
Funding office code
KSC00