GovChime
AWARDPOSmall business

Po NNX12CD98PPARTICLE IN CELL CONSULTING LLC

Overview

Award facts

Period of performance
Apr 27, 2012 to Aug 13, 2012
Ended
Modifications
2
Latest action Apr 27, 2012
Contract type
Po
PIID NNX12CD98P

Description of requirement

NEW MULTISCALE MODELING CAPABILITY FOR ANALYZING ADVANCED HALL THRUSTERS IS PROPOSED. THIS TECHNOLOGY OFFERS NASA THE ABILITY TO REDUCE DEVELOPMENT EFFORT OF NEW HIGH POWER HALL THRUSTERS, AND REDUCE SYSTEM COMPLEXITY AND INCREASE SYSTEM LIFETIME AND DURABILITY. HISTORICALLY, EFFORTS TO MODEL HALL THRUSTERS UTILIZED EITHER HYBRID/FLUID APPROACH WHICH REDUCE COMPUTATIONAL OVERHEAD BUT RELY ON ANALYTICAL FITS, OR REQUIRED PROHIBITIVE COMPUTATIONAL RESOURCES TO MODEL THRUSTERS SELF-CONSISTENTLY. EVEN WITH THE USE OF LARGE SUPERCOMPUTERS, THE SELF-CONSISTENT APPROACH WAS LIMITED TO SMALL, LOW POWER THRUSTERS. WE PROPOSE A NEW APPROACH IN WHICH ELECTRON TRANSPORT ALONG MAGNETIC FIELD LINES IS COMPUTED SELF-CONSISTENTLY USING A KINETIC CODE FOR ELECTRONS, BUT GLOBAL CROSS-FIELD PROPERTIES ARE COMPUTED USING A 2D HYBRID CODE. THIS APPROACH COMBINES THE BENEFITS OF FULLY KINETIC SELF-CONSISTENT MODELING WITH THE PERFORMANCE GAIN OF HYBRID MODELS. THE MODEL WILL BE ABLE TO ANALYZE HALL THRUSTER DISCHARGES WITHOUT REQUIRING ANY USER-SPECIFIED MOBILITY FITS. THE MODEL WILL ALSO REQUIRE ONLY COMPUTATIONAL RESOURCES AVAILABLE IN A STANDARD DESKTOP WORKSTATION. IN ADDITION, IONS EXITING THE THRUSTER WILL BE SAMPLED TO GENERATE A DISCRETIZED SOURCE MODEL FOR USE WITH SUBSEQUENT THRUSTER PLUME MODELING. PLUME MODELING IS NECESSARY TO OPTIMIZE THRUSTER SPACECRAFT COUPLING, AND REDUCE POSSIBLE INSTRUMENT AND SPACECRAFT COMPONENT CONTAMINATION EFFECTS. THESE THREE COMPONENTS, MAGNETIC FIELD LINE, THRUSTER DISCHARGE, AND THE SPACECRAFT ENVIRONMENT, FORM THE THREE SCALES OF OUR MULTISCALE APPROACH. IN THIS EFFORT WE WILL CONCENTRATE ON EXTENDING THE CAPABILITY OF MODELING THRUSTER DISCHARGES BY DEVELOPING A NEW LIGHT-WEIGHT HYBRID CODE WITH BUILT IN SUPPORT FOR KINETIC MOBILITY MODELING.

Dates and value

Award date
Signed on Feb 10, 2012
Potential end of performance
Aug 12, 2012

Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Apr 27, 2012. View on USAspending · Recipient on SAM.gov

Recipient

LocationFALLS CHURCH, VA
UEICT9NGN9JNR97
Business sizeSmall businessSize at award, per the contracting officer

Business types and certifications

For-profit organization

As represented in SAM.gov at the time of the action.

Subcontracting network

The prime, the subcontractors on this award, and their own subcontractors.

Subaward amounts are self-reported by prime contractors to SAM.gov and appear 1 to 2 months after the work. Duplicates are removed on a best-effort basis. Totals are incomplete and not an audit. Source: USAspending.

Agency and place

Awarding and funding

Awarded by
  1. National Aeronautics and Space Administration
  2. NASA SHARED SERVICES CENTER
Funded by
  1. National Aeronautics and Space Administration
  2. GLENN RESEARCH CENTER

Place of performance

Place of performance
Falls Church, Falls Church (City), Virginia 22046-4252
Congressional district (place of performance)
VA-08As reported at the time of the action

Classification and competition

Classification

Competition

Extent competed
Full and open competition after exclusion of sourcesD
Solicitation procedures
Negotiated proposal/quoteNP
Set-aside
Small business set aside - totalSBA
Contract pricing
Firm fixed priceJ
Offers received
2

Solicitation and notices

Solicitation ID
SBIR12PHASE1(as reported)

Contract details

Subcontracting plan
Plan not requiredB
Major program
Multiscale modeling of hall thrusters
Service Contract Act labor standards
No
Government-furnished property
Transaction does not use GFE/GFPN
Bundled requirement
Not a bundled requirementD
Consolidated requirement
No
Undefinitized action (terms not final)
No
Performance-based service acquisition
Yes - service where PBA is used.Y

Linked notices

Notice
Notice ID
Type
Link
Posted

Transaction history

Modification history

Base award
Feb 10, 2012Base obligation at award: $93,776
Latest action
Apr 27, 2012 — Other administrative actionModification 2; administrative: no change in scope or value
Actions by type
  • Base award1
  • Other administrative action2
3 actions recorded, Feb 10, 2012 to Apr 27, 2012; each action counted once.

Similar awards

PIID
Match
Awardee

All contract data

All contract data

Every other field reported for this award, as of its latest reported action

Competition

Evaluation preference
No preference used
Synopsized publicly (SAM.gov / FedBizOpps)
No
Simplified procedures for commercial items
No

Pricing and financing

Paid by purchase card
No

Socio-economic and policy

Recovered materials and sustainability
No clauses included and no sustainability incluC
EPA-designated product
Not requiredE
National interest action
Operation enduring freedom (OEF)O12F
Walsh-Healey Act (materials and supplies)
No
Construction wage rates (Davis-Bacon)
No

Place and origin

Domestic or foreign entity
U.S. owned businessA
Place of manufacture
Not a manufactured end productC

Structure

Award or IDV
Award
Award type
PoB
Awarding agency code
8000
Awarding sub-tier code
8000
Contracting office code
NSSC0
Transactions recorded under this award key
3

Funding

Funding agency code
8000
Funding sub-tier code
8000
Funding office code
GRC00