GovChime
AWARDPOSmall business

Po NNX12CE46PNITRONEX CORPORATION

Overview

Award facts

Period of performance
Feb 13, 2012 to Aug 13, 2012
Ended
Modifications
0
Latest action Feb 13, 2012
Contract type
Po
PIID NNX12CE46P

Description of requirement

THE FUTURE CAPABILITIES OF SENSORS AND INSTRUMENTATION DEPLOYED IN SPACE WILL CONTINUE TO INCREASE, RESULTING IN INCREASING AMOUNTS OF COLLECTED DATA. TO REACH THESE HIGHER SPEED DATA RATES, INCREASES TO THE OVERALL SYSTEM GAIN OF THE COMMUNICATION LINK WILL BE REQUIRED. A DETERMINISTIC METHOD TO INCREASE SYSTEM GAIN OF A RF COMMUNICATION LINK IS TO PROVIDE HIGHER TRANSMITTED RF POWER. HOWEVER, WITH THIS HIGHER RF OUTPUT POWER ALSO COMES THE CHALLENGE OF MAXIMIZING POWER EFFICIENCY AND REDUCING THE SIZE WEIGHT AND POWER (SWAP) OF THE POWER AMPLIFIER (PA) FOR LONG-RANGE SPACE MISSIONS. THE INNOVATION WILL BE TO DEVELOP A SOLID-STATE POWER AMPLIFIER (SSPA) THAT PRODUCES 50 W OF LINEAR RF AT X-BAND (8.4 GHZ) WITH HIGH DC-TO-RF-EFFICIENCY (>60%) AND LOW MASS. THE SIGNIFICANCE WILL BE THE UTILIZATION OF WIDE BAND-GAP RF SEMICONDUCTORS TO EFFICIENTLY CREATE HIGH RF POWER THAT IS ROBUST TO THE HIGH RADIATION ENVIRONMENTS OF SPACE. A WIDE BAND-GAP COMPOUND SEMICONDUCTOR MATERIAL SUCH AS GALLIUM NITRIDE (GAN) WILL PROVIDE THIS REQUIRED INNOVATION. GAN-BASED FIELD EFFECT TRANSISTORS (FETS) HAVE THE POTENTIAL TO OPERATE AT POWER DENSITIES OF UP TO 10 TIMES THAT OF CONVENTIONAL RF SEMICONDUCTOR TECHNOLOGIES, WHICH WILL ENABLE COMPACT PAS WITH HIGHER RF OUTPUT POWER TO BE IMPLEMENTED. THE PROPOSED GAN PA DESIGN IS ESTIMATED TO BE>50% SMALLER IN BOTH SIZE AND WEIGHT COMPARED TO OTHER SOLID STATE SOLUTIONS AND ALMOST 20% LOWER IN POWER CONSUMPTION FOR TYPICAL DESIGNS USED IN LONG-RANGE SPACE RF TELECOMMUNICATIONS. IN SUMMARY, APPLYING NOVEL GAN SEMICONDUCTOR MATERIALS IN INNOVATIVE PA DESIGNS ARE REQUIRED FOR LONG-RANGE SPACE RF COMMUNICATION SYSTEMS TO FULLY REACH THEIR PERFORMANCE POTENTIAL AND TO REDUCE THEIR SWAP.

Dates and value

Award date
Signed on Feb 13, 2012
Potential end of performance
Aug 12, 2012

Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Feb 13, 2012. View on USAspending · Recipient on SAM.gov

Recipient

LocationDURHAM, NC
UEICNWALCPXYNM8
Business sizeSmall businessSize at award, per the contracting officer
Parent companyNITRONEX CORPORATION

Business types and certifications

For-profit organizationCorporation (not tax-exempt)

As represented in SAM.gov at the time of the action.

Subcontracting network

The prime, the subcontractors on this award, and their own subcontractors.

Subaward amounts are self-reported by prime contractors to SAM.gov and appear 1 to 2 months after the work. Duplicates are removed on a best-effort basis. Totals are incomplete and not an audit. Source: USAspending.

Agency and place

Awarding and funding

Awarded by
  1. National Aeronautics and Space Administration
  2. NASA SHARED SERVICES CENTER
Funded by
  1. National Aeronautics and Space Administration
  2. AMES RESEARCH CENTER

Place of performance

Place of performance
Durham, North Carolina 27703-8039
Congressional district (place of performance)
NC-04As reported at the time of the action

Classification and competition

Classification

Competition

Extent competed
Full and open competition after exclusion of sourcesD
Solicitation procedures
Negotiated proposal/quoteNP
Set-aside
Small business set aside - totalSBA
Contract pricing
Firm fixed priceJ
Offers received
2

Solicitation and notices

Solicitation ID
SBIR12PHASE1(as reported)

Contract details

Subcontracting plan
Plan not requiredB
Major program
X-band gan power amplifiers for long range space r
Service Contract Act labor standards
No
Government-furnished property
Transaction does not use GFE/GFPN
Bundled requirement
Not a bundled requirementD
Consolidated requirement
No
Undefinitized action (terms not final)
No
Performance-based service acquisition
Yes - service where PBA is used.Y

Linked notices

Notice
Notice ID
Type
Link
Posted

Transaction history

Modification history

Base award
Feb 13, 2012Base obligation at award: $124,918
Latest action
Feb 13, 2012 — Base awardModification 0; obligation change +$124,918
Actions by type
  • Base award1
1 actions recorded, Feb 13, 2012 to Feb 13, 2012; each action counted once.

Similar awards

PIID
Match
Awardee

All contract data

All contract data

Every other field reported for this award, as of its latest reported action

Competition

Evaluation preference
No preference used
Simplified procedures for commercial items
No

Pricing and financing

Paid by purchase card
No
Latest action: change in base and exercised options
$124,918
Latest action: change in base and all options
$124,918

Socio-economic and policy

Recovered materials and sustainability
No clauses included and no sustainability incluC
EPA-designated product
Not requiredE
Research program (SBIR/STTR)
Small business innovation research program phase i actionSR1
Walsh-Healey Act (materials and supplies)
No
Construction wage rates (Davis-Bacon)
No

Place and origin

Domestic or foreign entity
U.S. owned businessA
Place of manufacture
Not a manufactured end productC

Structure

Award or IDV
Award
Award type
PoB
Awarding agency code
8000
Awarding sub-tier code
8000
Contracting office code
NSSC0
Transactions recorded under this award key
1

Funding

Funding agency code
8000
Funding sub-tier code
8000
Funding office code
ARC00