Po NNX12CF02PKT ENGINEERING CORPORATION
Overview
Award facts
- Period of performance
- Apr 18, 2012 to Aug 13, 2012
- Ended
- Modifications
- 1
- Latest action Apr 18, 2012
- Contract type
- Po
- PIID NNX12CF02P
Description of requirement
KT ENGINEERING (KTE) IS PLEASED TO SUBMIT THIS PROPOSAL TO ADDRESS THE STATED NEED FOR "INNOVATIVE SOLUTIONS THAT WILL ALLOW SPACEPORT LAUNCH SERVICE PROVIDERS TO OPERATE IN AN EFFICIENT, LOW COST MANNER AND INCREASES CAPABILITIES ASSOCIATED WITH INTEGRATION, CHECKOUT, AND PREPARATIONS REQUIRED TO CONFIGURE AND READY SPACE SYSTEMS FOR LAUNCH." WE PROPOSE TO CONDUCT RESEARCH AND DEMONSTRATE FEASIBILITY OF A NOVEL LAUNCH VEHICLE PRESSURIZATION SYSTEM CONCEPT THAT WILL INCREASE PERFORMANCE AND RELIABILITY COMPARED WITH TRADITIONAL APPROACHES, REDUCE DEPENDENCE UPON HELIUM UP TO 50%, ENABLE THE USE OF LOW-COST COMMERCIAL OFF THE SHELF TECHNOLOGY, AND DEMONSTRATE THE AUTOMATED GROUND PROCESSING ASSOCIATED WITH THIS TECHNOLOGY. OUR INNOVATION IS BASED ON FIVE MAJOR TECHNOLOGY AND OPERATIONAL ELEMENTS INCLUDING: 1) TRIDYNE PRESSURANT, 2) DISTRIBUTED STORAGE AND CONTROL, 3) COLD GAS STORAGE / WARM GAS DELIVERY, 4) BANG-BANG PRESSURE CONTROL, AND 5) END-OF-BURN TANK PRESSURE DECAY. PUMP-FED LAUNCH VEHICLES WILL BENEFIT FROM OUR INNOVATIVE CONCEPT BUT THE MOST SIGNIFICANT BENEFITS ARE ACHIEVED IN COST-OPTIMIZED PRESSURE-FED SYSTEMS SUCH AS KT ENGINEERING'S RADIALLY SEGMENTED LAUNCH VEHICLE (RSLV). WE PROPOSE A SIX MONTH PHASE I PROGRAM TO REFINE THE DESIGNS OF THE CRITICAL GROUND AND AIRBORNE ELEMENTS OF THIS DISTRIBUTED PRESSURIZATION SYSTEM. WE INTEND TO DEMONSTRATE FEASIBILITY AND MORE ACCURATELY QUANTIFY THE BENEFITS OF OUR APPROACH THROUGH ANALYTICAL MODELING, PRELIMINARY DESIGN, AND HIGH-FLOW, HIGH-PRESSURE TESTING OF A PROTOTYPE TRIDYNE CATALYTIC REACTOR. THE PRODUCT OF THIS EFFORT WILL BE ENGINEERING ANALYSIS AND MODELS, PRESENTATION MATERIALS FROM MAJOR REVIEWS, A COMPREHENSIVE FINAL REPORT, AND OUR PHASE II PROPOSAL. UNDER PHASE II WE WILL PROPOSED TO DEMONSTRATE DESIGN AND OPERATION OF THE GROUND AND AIRBORNE ELEMENTS OF OUR PRESSURIZATION SYSTEM THROUGH PROTOTYPE HARDWARE FABRICATION AND TESTING IN THE NASA KSC LAUNCH EQUIPMENT TEST FACILITY (LETF).
Dates and value
- Award date
- Signed on Feb 13, 2012
- Potential end of performance
- Aug 12, 2012
Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Apr 18, 2012. View on USAspending · Recipient on SAM.gov
Recipient
Business types and certifications
As represented in SAM.gov at the time of the action.
Subcontracting network
The prime, the subcontractors on this award, and their own subcontractors.
Agency and place
Awarding and funding
- Awarded by
- National Aeronautics and Space Administration
- NASA SHARED SERVICES CENTER
- Funded by
- National Aeronautics and Space Administration
- KENNEDY SPACE CENTER
Place of performance
- Place of performance
- Madison, Alabama 35758-7552
- Congressional district (place of performance)
- AL-05As reported at the time of the action
Classification and competition
Classification
- Product or service (PSC)
- AR11R&D- SPACE: AERONAUTICS/SPACE TECHNOLOGY (BASIC RESEARCH) (research and development)
Competition
- Extent competed
- Full and open competition after exclusion of sourcesD
- Solicitation procedures
- Negotiated proposal/quoteNP
- Set-aside
- Small business set aside - totalSBA
- Contract pricing
- Firm fixed priceJ
- Offers received
- 2
Solicitation and notices
- Solicitation ID
- SBIR12PHASE1(as reported)
Contract details
- Subcontracting plan
- Plan not requiredB
- Major program
- Low cost, high efficiency, pressurization system f
- Service Contract Act labor standards
- No
- Government-furnished property
- Transaction does not use GFE/GFPN
- Bundled requirement
- Not a bundled requirementD
- Consolidated requirement
- No
- Undefinitized action (terms not final)
- No
- Performance-based service acquisition
- Yes - service where PBA is used.Y
Linked notices
Notice | Notice ID | Type | Link | Posted |
|---|---|---|---|---|
Transaction history
Modification history
- Base award
- Feb 13, 2012Base obligation at award: $124,351
- Latest action
- Apr 18, 2012 — Other administrative actionModification 1; administrative: no change in scope or value
- Actions by type
- Base award1
- Other administrative action1
Similar awards
PIID | Match | Awardee |
|---|---|---|
All contract data
All contract data
Every other field reported for this award, as of its latest reported action
Competition
- Evaluation preference
- No preference used
- Synopsized publicly (SAM.gov / FedBizOpps)
- No
- Simplified procedures for commercial items
- No
Pricing and financing
- Paid by purchase card
- No
Socio-economic and policy
- Recovered materials and sustainability
- No clauses included and no sustainability incluC
- EPA-designated product
- Not requiredE
- Research program (SBIR/STTR)
- Small business innovation research program phase i actionSR1
- Walsh-Healey Act (materials and supplies)
- No
- Construction wage rates (Davis-Bacon)
- No
Place and origin
- Domestic or foreign entity
- U.S. owned businessA
- Place of manufacture
- Not a manufactured end productC
Structure
- Award or IDV
- Award
- Award type
- PoB
- Awarding agency code
- 8000
- Awarding sub-tier code
- 8000
- Contracting office code
- NSSC0
- Transactions recorded under this award key
- 2
Funding
- Funding agency code
- 8000
- Funding sub-tier code
- 8000
- Funding office code
- KSC00