GovChime
AWARDDCASmall business

Dca NNX13CC13CELECTRODYNAMIC APPLICATIONS INC

Overview

Award facts

Period of performance
May 23, 2013 to Nov 23, 2013
Ended
Modifications
0
Latest action May 23, 2013
Contract type
Dca
PIID NNX13CC13C

Description of requirement

IGF::OT::IGF THE PRESENCE OF ENERGETIC IONS, THAT APPEAR UNDER HIGH CATHODE CURRENT OPERATION, STAND AS A SHOWSTOPPER TO THE REALIZATION OF HIGH POWER ELECTRIC PROPULSION. PHYSICAL BARRIERS SUCH AS THE USE OF CARBON ELECTRODES (E.G. NEXT) ARE NO LONGER SUFFICIENT AS ION ENERGIES MEASURED GREATLY EXCEED THE SPUTTER THRESHOLD OF EVEN CARBON. UNLESS THIS PROBLEM IS ADDRESSED, THE PROSPECT OF INADEQUATE LIFE LOOMS. THE BENEFITS OF HIGH POWER ELECTRIC PROPULSION MISSIONS SUPPORTING HUMAN OPERATIONS IN PARTICULAR WOULD BE LEFT UNFULFILLED. THIS EFFORT AIMS TO FULLY CHARACTERIZE THE CONDITIONS UNDER WHICH ENERGY IONS OCCUR BY DOCUMENTING ION ENERGY SPECTRA OVER A RANGE OF REPRESENTATIVE OPERATING CONDITIONS. AT THESE CONDITIONS, THE EFFORT WILL IMPLEMENT TWO NOVEL METHODS OF ESSENTIALLY DEFEATING THE ENERGETIC ION PRODUCTION MECHANISM: 1) MAGNETIC SHORTING AND 2) GAS INJECTION. WHILE THE CONCEPT OF INJECTING GAS TO QUENCH ENERGETIC ION PRODUCTION HAS BEEN DEMONSTRATED IN THE PAST, WE TAKE THE APPROACH A STEP FURTHER BY 1) ELUCIDATING THE MECHANISM BY WHICH GAS INJECTION ACTUALLY QUENCHES ENERGETIC ION PRODUCTION AND 2) IMPLEMENTING A NOVEL GAS APPLICATOR THAT WOULD CONSERVE PROPELLANT THEREBY ALLOWING FOR GAS IMPLEMENTATION WITHOUT A SIGNIFICANT EFFICIENCY SACRIFICE. PAST STUDIES HAVE SHOWN THAT ENERGETIC IONS FORM UNDER CONDITIONS OF HIGH CURRENT. NO SATISFACTORY UNDERSTANDING OF HOW THESE ARE FORMED OR HOW TO MITIGATE HAS BEEN COMMUNICATED. THIS EFFORT AIMS TO ADDRESS BOTH ISSUES. THE FOCUS OF THE PROPOSED EFFORT DIRECTLY ADDRESSES A PROBLEM THAT STANDS IN THE CRITICAL PATH FOR THE DEVELOPMENT OF HIGH POWER ELECTRIC PROPULSION. WITHOUT A SOLUTION TO THE ENERGETIC ION LIFETIME ISSUE, IT IS DIFFICULT TO IMAGINE THE ACTUAL IMPLEMENTATION OF HIGH POWER ELECTRIC PROPULSION FOR ACTUAL MISSIONS. THIS PROPOSED EFFORT AIMS TO GENERATE A METHODOLOGY AND APPARATUS FOR THE ELIMINATION OF ENERGY IONS IN HIGH CURRENT CATHODES.

Dates and value

Award date
Signed on May 23, 2013
Potential end of performance
Nov 22, 2013

Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded May 23, 2013. View on USAspending · Recipient on SAM.gov

Recipient

LocationANN ARBOR, MI
UEIEKN4D4FDZNV9
Business sizeSmall businessSize at award, per the contracting officer

Business types and certifications

Minority-ownedFor-profit organizationSubchapter S corporationCorporation (not tax-exempt)

As represented in SAM.gov at the time of the action.

Subcontracting network

The prime, the subcontractors on this award, and their own subcontractors.

Subaward amounts are self-reported by prime contractors to SAM.gov and appear 1 to 2 months after the work. Duplicates are removed on a best-effort basis. Totals are incomplete and not an audit. Source: USAspending.

Agency and place

Awarding and funding

Awarded by
  1. National Aeronautics and Space Administration
  2. NASA SHARED SERVICES CENTER
Funded by
  1. National Aeronautics and Space Administration
  2. GLENN RESEARCH CENTER

Place of performance

Place of performance
Ann Arbor, Washtenaw County, Michigan 48105-1570
Congressional district (place of performance)
MI-06As reported at the time of the action

Classification and competition

Classification

Competition

Extent competed
Full and open competition after exclusion of sourcesD
Solicitation procedures
Negotiated proposal/quoteNP
Set-aside
Small business set aside - totalSBA
Contract pricing
Firm fixed priceJ
Offers received
430

Solicitation and notices

Solicitation ID
13SBIRSELECTPHASEI(as reported)

Contract details

Subcontracting plan
Plan not requiredB
Major program
Energetic ion mitigation methodology for high powe
Cost Accounting Standards clause
No - CAS waiver approvedN
Certified cost or pricing data
No
Service Contract Act labor standards
No
Government-furnished property
Transaction does not use GFE/GFPN
Bundled requirement
Not a bundled requirementD
Consolidated requirement
No
Undefinitized action (terms not final)
No
Multi-year contract
Yes
Performance-based service acquisition
Yes - service where PBA is used.Y

Linked notices

Notice
Notice ID
Type
Link
Posted

Transaction history

Modification history

Base award
May 23, 2013Base obligation at award: $199,725
Latest action
May 23, 2013 — Base awardModification 0; obligation change +$199,725
Actions by type
  • Base award1
1 actions recorded, May 23, 2013 to May 23, 2013; each action counted once.

Similar awards

PIID
Match
Awardee

All contract data

All contract data

Every other field reported for this award, as of its latest reported action

Competition

Evaluation preference
No preference used
Simplified procedures for commercial items
No

Pricing and financing

Paid by purchase card
No
Latest action: change in base and exercised options
$199,725
Latest action: change in base and all options
$199,725

Socio-economic and policy

Recovered materials and sustainability
No clauses included and no sustainability incluC
EPA-designated product
Not requiredE
Research program (SBIR/STTR)
Small business innovation research program phase i actionSR1
Walsh-Healey Act (materials and supplies)
No

Place and origin

Domestic or foreign entity
U.S. owned businessA
Place of manufacture
Not a manufactured end productC

Structure

Award or IDV
Award
Award type
DcaD
Awarding agency code
8000
Awarding sub-tier code
8000
Contracting office code
NSSC0
Transactions recorded under this award key
1

Funding

Funding agency code
8000
Funding sub-tier code
8000
Funding office code
GRC00