GovChime
AWARDPOSmall business

Po NNX13CJ13PEXTREME DIAGNOSTICS, INC.

Overview

Award facts

Period of performance
May 23, 2013 to Nov 23, 2013
Ended
Modifications
0
Latest action May 23, 2013
Contract type
Po
PIID NNX13CJ13P

Description of requirement

IGF::OT::IGF THIS SBIR PROJECT DELIVERS AN ON-ORBIT VALIDATION SYSTEM (OVS) THAT PROVIDES PERFORMANCE AND DURABILITY DATA FOR MACRO FIBER COMPOSITE (MFC) ACTIVE PIEZOCOMPOSITE MATERIALS OPERATING IN THE SPACE ENVIRONMENT. OUR NASA CUSTOMER IS THE MACRO FIBER COMPOSITE ACTUATOR EXPERIMENT (MFCX), WHICH USES THE MATERIALS INTERNATIONAL SPACE STATION EXPERIMENT-X (MISSE-X) PLATFORM. MISSE-X WILL EXPAND ISS UTILIZATION BY ADVANCING THE TECHNOLOGY READINESS LEVEL OF NEW MATERIALS, DEVICES, AND SUBSYSTEMS. OVS USES THE IMPEDANCE METHOD TO VALIDATE BOTH MFCS AND IN SITU SELF-HEALTH MONITORING METHODS. IMPLICATIONS OF THE INNOVATION: MFC PIEZOCOMPOSITES HAVE BEEN FLOWN, BUT ONLY IN A SHIELDED ENCLOSURE FOR A SHORT DURATION. MFC MATERIALS WILL NEED TO OPERATE CONTINUOUSLY WITH MINIMAL THERMAL PROTECTION TO ENABLE ACTIVE COMPOSITE REFLECTOR STRUCTURES, LARGE SOLAR ARRAY ACTIVE CONTROL, AND STRUCTURAL SELF-HEALTH MONITORING. DATA IS NEEDED ON THE VIABILITY OF MFC MATERIALS FOR LONG-DURATION SPACE APPLICATIONS. TECHNICAL OBJECTIVES: OVS LEVERAGES OUR PREVIOUS NASA SBIR RESEARCH. OUR INITIAL IMPEDANCE METHOD PROTOTYPE EXISTS AS A TRL 5 UNIT. WE HAVE DEMONSTRATED BOTH ANALOG AND DIGITAL MFC OPERATION. HOWEVER, IT IS NOT CLEAR WHICH APPROACH (ANALOG OR DIGITAL) IS BEST FOR OVS. EACH APPROACH HAS DIFFERENT POWER, MECHANICAL, ELECTRICAL, AND COMPUTATIONAL NEEDS IT IS NOT CLEAR WHICH IS THE BEST MATCH FOR MISSE-X. INDEED, A NEW CONFIGURATION MAY BE REQUIRED. PHASE I ADDRESSES THESE CONCERNS AND ESTABLISHES FEASIBILITY THROUGH VALIDATION TESTS AND EXPERIMENTS. RESEARCH DESCRIPTION: WE HAVE ALREADY DEVELOPED AN IMPEDANCE-BASED ELECTRONICS PACKAGE AND VALIDATED IT UNDER SIMULATED LAUNCH CONDITIONS. PHASE I TRANSFORMS THIS IMPLEMENTATION FOR MISSE-X COMPATIBILITY AND PRODUCES A PHASE II ROAD MAP. ANTICIPATED RESULTS: PHASE I ADDRESSES THE MAIN BARRIER TO MISSE-X OPERATION, AND COMPLETES A TRL 5 PROTOTYPE THAT IS MFCX COMPATIBLE. PHASE II DELIVERS A FULLY OPERATIONAL TRL 7 UNIT.

Dates and value

Award date
Signed on May 23, 2013
Potential end of performance
Nov 22, 2013

Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded May 23, 2013. View on USAspending · Recipient on SAM.gov

Recipient

LocationBOULDER, CO
UEIS1Q3NANXF7N5
Business sizeSmall businessSize at award, per the contracting officer

Business types and certifications

For-profit organizationSubchapter S corporation

As represented in SAM.gov at the time of the action.

Subcontracting network

The prime, the subcontractors on this award, and their own subcontractors.

Subaward amounts are self-reported by prime contractors to SAM.gov and appear 1 to 2 months after the work. Duplicates are removed on a best-effort basis. Totals are incomplete and not an audit. Source: USAspending.

Agency and place

Awarding and funding

Awarded by
  1. National Aeronautics and Space Administration
  2. NASA SHARED SERVICES CENTER
Funded by
  1. National Aeronautics and Space Administration
  2. JOHNSON SPACE CENTER

Place of performance

Place of performance
Boulder, Colorado 80302-6720 United States Of America
Congressional district (place of performance)
CO-02As reported at the time of the action

Classification and competition

Classification

Competition

Extent competed
Full and open competition after exclusion of sourcesD
Solicitation procedures
Negotiated proposal/quoteNP
Set-aside
Small business set aside - totalSBA
Contract pricing
Firm fixed priceJ
Offers received
430

Solicitation and notices

Solicitation ID
NNX13SBIRPHASEI(as reported)

Contract details

Subcontracting plan
Plan not requiredB
Major program
On-orbit validation system for space structure com
Service Contract Act labor standards
No
Government-furnished property
Transaction does not use GFE/GFPN
Bundled requirement
Not a bundled requirementD
Consolidated requirement
No
Undefinitized action (terms not final)
No
Performance-based service acquisition
Yes - service where PBA is used.Y

Linked notices

Notice
Notice ID
Type
Link
Posted

Transaction history

Modification history

Base award
May 23, 2013Base obligation at award: $125,000
Latest action
May 23, 2013 — Base awardModification 0; obligation change +$125,000
Actions by type
  • Base award1
1 actions recorded, May 23, 2013 to May 23, 2013; each action counted once.

Similar awards

PIID
Match
Awardee

All contract data

All contract data

Every other field reported for this award, as of its latest reported action

Competition

Evaluation preference
No preference used
Simplified procedures for commercial items
No

Pricing and financing

Paid by purchase card
No
Latest action: change in base and exercised options
$125,000
Latest action: change in base and all options
$125,000

Socio-economic and policy

Recovered materials and sustainability
No clauses included and no sustainability includedC
EPA-designated product
Not requiredE
Research program (SBIR/STTR)
Small business innovation research program phase i actionSR1
Walsh-Healey Act (materials and supplies)
No

Place and origin

Domestic or foreign entity
U.S. owned businessA
Place of manufacture
Not a manufactured end productC

Structure

Award or IDV
Award
Award type
PoB
Awarding agency code
8000
Awarding sub-tier code
8000
Contracting office code
NSSC0
Transactions recorded under this award key
1

Funding

Funding agency code
8000
Funding sub-tier code
8000
Funding office code
JSC00