GovChime
AWARDPOSmall business

Po NNX13CL09PSIBELLOPTICS

Overview

Award facts

Period of performance
May 23, 2013 to Nov 23, 2013
Ended
Modifications
0
Latest action May 22, 2013
Contract type
Po
PIID NNX13CL09P

Description of requirement

IGF::OT::IGF THE CAPACITY OF COHERENT LIDAR SYSTEMS TO PRODUCE A CONTINUOUS, REAL-TIME, 3D SCAN OF WIND VELOCITIES VIA DETECTION OF BACKSCATTER OF ATMOSPHERIC AEROSOLS IN CLEAR-AIR CONDITIONS GIVES THIS TECHNOLOGY A CLEAR ADVANTAGE OVER OTHER ATMOSPHERIC MONITORING TECHNOLOGIES. LIDAR HAS PROVEN ITS VALUE IN A NUMBER OF APPLICATIONS, INCLUDING THE DETECTION OF CLEAR-AIR TURBULENCE, WIND SHEAR, AND AIRCRAFT WAKE VORTICES. OF PARTICULAR INTEREST UNDER THIS NASA SUB-TOPIC IS THE DEVELOPMENT OF AN AIRBORNE LIDAR SYSTEM CAPABLE OF DETECTING AND MEASURING AIRCRAFT WAKE VORTICES AND TURBULENCE OUT AHEAD OF THE AIRCRAFT IN ORDER TO IMPROVE AVIATION SAFETY. TO PERFORM THIS TASK WELL A LIDAR MUST HAVE CERTAIN CHARACTERISTICS AND BE PAIRED WITH A HIGHLY OPTIMIZED WAKE AND TURBULENCE PROCESSING ALGORITHM. THE KEY DEVELOPMENT AREA FOR DETECTION OF TURBULENCE AT CRUISING ALTITUDE IS LIDAR TRANSMIT ENERGY AND PULSEWIDTH. HIGH ENERGY OUTPUT ON THE ORDER OF 1.0 MJ FOR LOW FLYING MANNED OR UNMANNED AIRCRAFT (10,000 FT) AND 10 MJ FOR COMMERCIAL AIRCRAFT (30,000 FT) IS REQUIRED. AEROSOL DENSITY DECREASES RAPIDLY AS A FUNCTION OF ALTITUDE AND THE BACKSCATTER COEFFICIENT AT 30,000 FT IS ONLY 4X10-10 AS OPPOSED TO 2X10-7 AT SEA-LEVEL. FURTHERMORE, COMMERCIAL AIRLINER CREWS WILL NEED AT LEAST 30 SECONDS REACTION TIME AFTER TURBULENCE IS DETECTED IN ORDER TO TAKE ACTION, REQUIRING THE LIDAR SYSTEM TO SEE 6.67 KM AHEAD (ASSUMING AN AVERAGE FLIGHT SPEED OF 500 MPH). OTHER KEY REQUIREMENTS OF AN AIRBORNE LIDAR SYSTEM INVOLVE THE SIZE AND POWER CONSUMPTION OF THE SYSTEM. THE LIMITED SPACE AND AVAILABLE ELECTRICAL POWER ON AN AIRCRAFT NECESSITATE THAT A LIDAR SYSTEM BE COMPACT AND EFFICIENT. IN ADDITION, THE SYSTEM MUST BE ABLE TO BE INTEGRATED ONTO THE AIRCRAFT WITHOUT INHIBITING OTHER FLIGHT SYSTEMS. SIBELLOPTICS PROPOSES A PHASE 1 SBIR TO DEVELOP AND TEST AN ER-DOPED POLARIZATION MAINTAINING (PM), LARGE MODE AREA (LMA) FIBER AMPLIFIER TO BOOST TRANSMITTED LIDAR POWER TO GREATER THAN 1 MJ PER PULSE.

Dates and value

Award date
Signed on May 22, 2013
Potential end of performance
Nov 22, 2013

Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded May 22, 2013. View on USAspending · Recipient on SAM.gov

Recipient

LocationLAFAYETTE, CO
UEIJMLWUSFMK1L7
Business sizeSmall businessSize at award, per the contracting officer
Parent companySIBELLOPTICS

Business types and certifications

Veteran-ownedFor-profit organizationLimited liability companyCorporation (not tax-exempt)

As represented in SAM.gov at the time of the action.

Subcontracting network

The prime, the subcontractors on this award, and their own subcontractors.

Subaward amounts are self-reported by prime contractors to SAM.gov and appear 1 to 2 months after the work. Duplicates are removed on a best-effort basis. Totals are incomplete and not an audit. Source: USAspending.

Agency and place

Awarding and funding

Awarded by
  1. National Aeronautics and Space Administration
  2. NASA SHARED SERVICES CENTER
Funded by
  1. National Aeronautics and Space Administration
  2. LANGLEY RESEARCH CENTER

Place of performance

Place of performance
Lafayette, Boulder County, Colorado 80026-3419
Congressional district (place of performance)
CO-02As reported at the time of the action

Classification and competition

Classification

Competition

Extent competed
Full and open competition after exclusion of sourcesD
Solicitation procedures
Negotiated proposal/quoteNP
Set-aside
Small business set aside - totalSBA
Contract pricing
Firm fixed priceJ
Offers received
430

Solicitation and notices

Solicitation ID
NNX13SBIRPHASEI(as reported)

Contract details

Subcontracting plan
Plan not requiredB
Major program
Development of a high energy amplifier for an airb
Service Contract Act labor standards
No
Government-furnished property
Transaction does not use GFE/GFPN
Bundled requirement
Not a bundled requirementD
Consolidated requirement
No
Undefinitized action (terms not final)
No
Performance-based service acquisition
Yes - service where PBA is used.Y

Linked notices

Notice
Notice ID
Type
Link
Posted

Transaction history

Modification history

Base award
May 22, 2013Base obligation at award: $124,421
Latest action
May 22, 2013 — Base awardModification 0; obligation change +$124,421
Actions by type
  • Base award1
1 actions recorded, May 22, 2013 to May 22, 2013; each action counted once.

Similar awards

PIID
Match
Awardee

All contract data

All contract data

Every other field reported for this award, as of its latest reported action

Competition

Evaluation preference
No preference used
Simplified procedures for commercial items
No

Pricing and financing

Paid by purchase card
No
Latest action: change in base and exercised options
$124,421
Latest action: change in base and all options
$124,421

Socio-economic and policy

Recovered materials and sustainability
No clauses included and no sustainability incluC
EPA-designated product
Not requiredE
Research program (SBIR/STTR)
Small business innovation research program phase i actionSR1
Walsh-Healey Act (materials and supplies)
No

Place and origin

Domestic or foreign entity
U.S. owned businessA
Place of manufacture
Not a manufactured end productC

Structure

Award or IDV
Award
Award type
PoB
Awarding agency code
8000
Awarding sub-tier code
8000
Contracting office code
NSSC0
Transactions recorded under this award key
1

Funding

Funding agency code
8000
Funding sub-tier code
8000
Funding office code
LARC0