GovChime
AWARDDCASmall business

Dca NNX13CL51CFREQUENCY MANAGEMENT INTERNATIONAL, INC

Overview

Award facts

Period of performance
May 23, 2013 to Nov 23, 2013
Ended
Modifications
0
Latest action May 23, 2013
Contract type
Dca
PIID NNX13CL51C

Description of requirement

IGF::OT::IGF CHRONOS TECHNOLOGY (THE R&D DIVISION OF FREQUENCY MANAGEMENT INTERNATIONAL, FMI) PROPOSES TO DELIVER A COMPREHENSIVE, AND FULLY INVESTIGATED&VALIDATED FEASIBILITY STUDY (IN PHASE 1) FOR A NOVEL APPROACH LEADING TO DESIGN&FABRICATION OF EXTREME ENVIRONMENT SILICON CARBIDE (SIC) CIRCUIT BLOCKS USED IN A VARIETY OF SPACECRAFT POWER&PROPULSION SYSTEM. THE CIRCUITS SHALL BE USED FOR A WIDE RANGE OF BOTH MANNED AND UNMANNED SPACE MISSIONS. THE RESULTING SOLUTIONS UNIQUELY ENABLE NEW EXTREME ENVIRONMENT AND HIGH TEMPERATURE PERFORMANCE LEVELS OFFERED COMMERCIALLY IN COMPACT, MINIATURE SIZE&RUGGED CONSTRUCTION. THERE ARE NO PRESENT ALTERNATIVES FOR THE PROPOSED DEVICES APPLICABLE TO THE EXTREME ENVIRONMENT OPERATING CONDITIONS. BASED ON THE TECHNOLOGY SELECTION INVESTIGATION AND THE ROAD MAP DEFINED, OUR PROPOSED TECHNOLOGY INVESTIGATION AND THE RESULTING DESIGN EFFORT IN PHASE 1 SHALL CONCLUDE WITH IDENTIFYING THE BEST FIT SEMICONDUCTOR FABRICATION PROCESS AS WELL AS COMPONENT LEVEL DESIGN&IMPLEMENTATION/FABRICATION METHODOLOGY PLAN. WITH THE ALREADY STATED INTEREST FROM SIC PROCESSING COMPANIES SUCH AS CREE, WE WOULD BE FOCUSED ON TARGETING DEVICE DESIGNS FOR CIRCUITS LIKE COUNTER, BASIC GATE, BUFFER/DRIVER&LIFIER, ALL OPERATING AT INDUSTRY STD LOW VOLTAGES IN PHASE 2, WE WILL COMPLETE THE DESIGN/FABRICATION OF SUCCESSFUL EXTREME ENVIRONMENT INTEGRATED CIRCUIT BLOCKS AS DESCRIBED THAT WILL BE USED IN HIGH EFFICIENCY SPACECRAFT POWER&PROPULSION SYSTEMS. WE ENVISION TO DELIVER DEVICES THAT WILL ENABLE HIGH EFFICIENCY POWER MANAGEMENT AS WELL AS MUCH IMPROVEMENT IN ENERGY DENSITY AND SPECIFIC POWER AS REQUIRED FOR THE STATE OF THE ART MODULAR POWER UNIT ARCHITECTURE. COUPLED WITH THE EXTREME ENVIRONMENT, HIGH TEMPERATURE OPERATION AND RADIATION HARDENED CAPABILITIES THE RESULTING INNOVATIVE DEVICES WILL PLAY ITS SIGNIFICANT ROLE AS PART OF THE EMERGING POWER AND PROPULSION SYSTEM FOR FUTURE MISSIONS.

Dates and value

Award date
Signed on May 23, 2013
Potential end of performance
Nov 22, 2013

Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded May 23, 2013. View on USAspending · Recipient on SAM.gov

Recipient

LocationHUNTINGTON BEACH, CA
UEIHMMRLMFSYNZ6
Business sizeSmall businessSize at award, per the contracting officer

Business types and certifications

For-profit organizationSubchapter S corporation

As represented in SAM.gov at the time of the action.

Subcontracting network

The prime, the subcontractors on this award, and their own subcontractors.

Subaward amounts are self-reported by prime contractors to SAM.gov and appear 1 to 2 months after the work. Duplicates are removed on a best-effort basis. Totals are incomplete and not an audit. Source: USAspending.

Agency and place

Awarding and funding

Awarded by
  1. National Aeronautics and Space Administration
  2. NASA SHARED SERVICES CENTER
Funded by
  1. National Aeronautics and Space Administration
  2. LANGLEY RESEARCH CENTER

Place of performance

Place of performance
Huntington Beach, Orange County, California 92649-1245
Congressional district (place of performance)
CA-47As reported at the time of the action

Classification and competition

Classification

Competition

Extent competed
Full and open competition after exclusion of sourcesD
Solicitation procedures
Negotiated proposal/quoteNP
Set-aside
Small business set aside - totalSBA
Contract pricing
Firm fixed priceJ
Offers received
430

Solicitation and notices

Solicitation ID
13SBIRSELECTPHASEI(as reported)

Contract details

Subcontracting plan
Plan not requiredB
Major program
Extreme environment circuit blocks for spacecraft
Cost Accounting Standards clause
No - CAS waiver approvedN
Certified cost or pricing data
No
Service Contract Act labor standards
No
Government-furnished property
Transaction does not use GFE/GFPN
Bundled requirement
Not a bundled requirementD
Consolidated requirement
No
Undefinitized action (terms not final)
No
Multi-year contract
Yes
Performance-based service acquisition
Yes - service where PBA is used.Y

Linked notices

Notice
Notice ID
Type
Link
Posted

Transaction history

Modification history

Base award
May 23, 2013Base obligation at award: $199,063
Latest action
May 23, 2013 — Base awardModification 0; obligation change +$199,063
Actions by type
  • Base award1
1 actions recorded, May 23, 2013 to May 23, 2013; each action counted once.

Similar awards

PIID
Match
Awardee

All contract data

All contract data

Every other field reported for this award, as of its latest reported action

Competition

Evaluation preference
No preference used
Simplified procedures for commercial items
No

Pricing and financing

Paid by purchase card
No
Latest action: change in base and exercised options
$199,063
Latest action: change in base and all options
$199,063

Socio-economic and policy

Recovered materials and sustainability
No clauses included and no sustainability incluC
EPA-designated product
Not requiredE
Research program (SBIR/STTR)
Small business innovation research program phase i actionSR1
Walsh-Healey Act (materials and supplies)
No

Place and origin

Domestic or foreign entity
U.S. owned businessA
Place of manufacture
Not a manufactured end productC

Structure

Award or IDV
Award
Award type
DcaD
Awarding agency code
8000
Awarding sub-tier code
8000
Contracting office code
NSSC0
Transactions recorded under this award key
1

Funding

Funding agency code
8000
Funding sub-tier code
8000
Funding office code
LARC0