GovChime
AWARDDEFINITIVE CONTRACTSmall business

Definitive contract NNX14CC22CWASK ENGINEERING, INC

Overview

Award facts

Period of performance
Jul 6, 2016 to Sep 21, 2016
Ended
Modifications
4
Latest action Jul 6, 2016
Contract type
Definitive contract
PIID NNX14CC22C

Description of requirement

IGF::OT::IGF OVER THE PAST DECADE, RESEARCH INTO ACTIVE COMBUSTION CONTROL HAS YIELDED IMPRESSIVE RESULTS IN SUPPRESSING THERMOACOUSTIC INSTABILITIES AND WIDENING THE OPERATIONAL RANGE OF GAS-TURBINE COMBUSTORS. ACTIVE COMBUSTION INSTABILITY CONTROL (ACIC) CONTROLS THE COMBUSTION PROCESS SUCH THAT THE HEAT RELEASE PROFILE IS MODULATED TO DAMPEN THE NATURALLY OCCURRING THERMOACOUSTIC INSTABILITIES. A MAJOR CHALLENGE TO EFFECTIVE IMPLEMENTATION OF ACTIVE COMBUSTION CONTROL IS THE AVAILABILITY OF VALVES AND ACTUATORS THAT PROVIDE ADEQUATE FLOW MODULATION CONTROL AUTHORITY. THE MAJORITY OF THE PUBLISHED WORK REVOLVES AROUND VALVES DESIGNED TO MODULATE THE MAIN COMBUSTOR FLOW. AT PRESENT THESE VALVES ARE NOT DESIGNED TO OPERATE IN A HARSH ENVIRONMENT AND AS SUCH ARE REQUIRED TO BE LOCATED OUTSIDE THE MAIN FLOW PATH, REDUCING THEIR CONTROL AUTHORITY. TO EFFECTIVELY MEET THE CHALLENGE, VALVES AND SENSORS THAT ARE SMALLER, MORE RESPONSIVE AND ROBUST MUST BE DEVELOPED. ULTIMATELY THE CONTROL VALVES ARE CO-LOCATED WITH THE FUEL INJECTION MANIFOLD. THE TRADE-OFF FOR THE HARSH ENVIRONMENT OPERATION IS THE ABILITY TO MAXIMIZE THE FLOW MODULATION CONTROL AUTHORITY. THE OBJECTIVE OF THIS RESEARCH IS TO INTEGRATE THE REQUIRED CONTROL AUTHORITY INTO AN OPERATIONAL ENVIRONMENT. THIS RESEARCH CONTINUES THE DEVELOPMENT OF A LIGHT WEIGHT FAST-ACTING FUEL CONTROL VALVE FOR HARSH ENVIRONMENT OPERATION. IN THE PHASE 1 EFFORT, THE VALVE DEMONSTRATED THE ABILITY TO MODULATE FLUID FLOW AT 1,000 HZ. THIS DEMONSTRATED THE VALVE WILL ALLOW THE PRECISE TIME DEPENDENT FUEL CONTROL REQUIRED FOR LEAN-BURN COMBUSTOR OPERABILITY. IN THIS PHASE II RESEARCH A PROTOTYPE VALVE IS DESIGNED, FABRICATED AND FLOW TESTED USING COMMERCIALLY-AVAILABLE DRIVER CIRCUITRY TO DEMONSTRATE VALVE OPERATION IN HARSH THERMAL ENVIRONMENTS.

Dates and value

Award date
Signed on Apr 17, 2014
Potential end of performance
Sep 20, 2016

Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Jul 6, 2016. View on USAspending · Recipient on SAM.gov

Recipient

LocationCAMERON PARK, CA
UEIMMC7MXMA2AR5
Business sizeSmall businessSize at award, per the contracting officer
Parent companyWASK ENGINEERING, INC

Business types and certifications

For-profit organizationSubchapter S corporationCorporation (not tax-exempt)

As represented in SAM.gov at the time of the action.

Subcontracting network

The prime, the subcontractors on this award, and their own subcontractors.

Subaward amounts are self-reported by prime contractors to SAM.gov and appear 1 to 2 months after the work. Duplicates are removed on a best-effort basis. Totals are incomplete and not an audit. Source: USAspending.

Agency and place

Awarding and funding

Awarded by
  1. National Aeronautics and Space Administration
  2. NASA SHARED SERVICES CENTER
Funded by
  1. National Aeronautics and Space Administration
  2. NASA SHARED SERVICES CENTER

Place of performance

Place of performance
Cameron Park, El Dorado County, California 95682-8457
Congressional district (place of performance)
CA-05As reported at the time of the action

Classification and competition

Classification

Competition

Extent competed
Full and open competition after exclusion of sourcesD
Solicitation procedures
Negotiated proposal/quoteNP
Set-aside
Small business set aside - totalSBA
Contract pricing
Firm fixed priceJ
Offers received
500

Solicitation and notices

Solicitation ID
NNX14SBIRPHASE11(as reported)

Contract details

Subcontracting plan
Plan not requiredB
Major program
Active combustion control valve
Cost Accounting Standards clause
No - CAS waiver approvedN
Certified cost or pricing data
No
Service Contract Act labor standards
No
Commercial procedures
Commercial item procedures not usedD
Government-furnished property
Transaction does not use GFE/GFPN
Bundled requirement
Not a bundled requirementD
Consolidated requirement
No
Undefinitized action (terms not final)
No
Multi-year contract
Yes
Performance-based service acquisition
No - service where PBA is not used.N

Linked notices

Notice
Notice ID
Type
Link
Posted

Transaction history

Modification history

Base award
Apr 17, 2014Base obligation at award: $749,836
Latest action
Jul 6, 2016 — Other administrative actionModification 4; administrative: no change in scope or value
Actions by type
  • Base award1
  • Other administrative action4
5 actions recorded, Apr 17, 2014 to Jul 6, 2016; each action counted once.

Similar awards

PIID
Match
Awardee

All contract data

All contract data

Every other field reported for this award, as of its latest reported action

Competition

Evaluation preference
No preference used
Local area set-aside
No
Simplified procedures for commercial items
No
A-76 (FAIR Act) action
No

Pricing and financing

Paid by purchase card
No

Socio-economic and policy

Recovered materials and sustainability
No clauses included and no sustainability includedC
EPA-designated product
Not requiredE
Clinger-Cohen Act planning (IT)
No
Research program (SBIR/STTR)
Small business innovation research program phase ii actionSR2
Walsh-Healey Act (materials and supplies)
No
Construction wage rates (Davis-Bacon)
No

Place and origin

Domestic or foreign entity
U.S. owned businessA
Country of product or service origin
United statesUSA
Place of manufacture
Not a manufactured end productC

Structure

Award or IDV
Award
Award type
Definitive contractD
Awarding agency code
8000
Awarding sub-tier code
8000
Contracting office code
80NSSC
Transactions recorded under this award key
5

Funding

Funding agency code
8000
Funding sub-tier code
8000
Funding office code
80NSSC