GovChime
AWARDPOSmall business

Po NNX14CC33POPTINAV INC

Overview

Award facts

Period of performance
Jun 20, 2014 to Dec 19, 2014
Ended
Modifications
0
Latest action Jun 4, 2014
Contract type
Po
PIID NNX14CC33P

Description of requirement

IGF::OT::IGF CLOSED WIND TUNNEL BEAMFORMING FOR AEROACOUSTICS HAS BECOME MORE AND MORE PREVALENT IN RECENT YEARS. STILL, THERE ARE MAJOR DRAWBACKS AS CURRENT MICROPHONE ARRAYS ARE RATHER LARGER AND HARD TO INSTALL AND CONVENTIONAL BEAMFORMING AND DECONVOLUTION TECHNIQUES DO NOT WORK WELL IN LOW SIGNAL-TO-NOISE ENVIRONMENTS. OUTLINED IN THE PROPOSAL IS A PHASED AIRFOIL IMAGING MICROPHONE ARRAY LOCATED INSIDE THE WIND TUNNEL WHICH UTILIZES FUNCTIONAL BEAMFORMING, A MODIFICATION OF CONVENTIONAL BEAMFORMING. A COMPLETED UNIT WOULD BE COMPRISED OF SEVERAL AIRFOILS WITH MICROPHONES PLACED IN A LINEAR FASHION ALONG THE LEADING EDGES. FUNCTIONAL BEAMFORMING IS A BREAKTHROUGH ALGORITHM THAT WILL ALLOW FOR MUCH BETTER BEAMFORM MAPPING WITH MUCH SMALLER ARRAYS THAN WHAT IS CURRENTLY AVAILABLE. BECAUSE OF THE POTENTIAL SMALL SIZE OF THE ARRAY, IT WOULD BE EASY TO INSTALL AND IMPLEMENT. PLACING THE ARRAY IN THE TUNNEL ALSO ALLOWS FOR NUMEROUS VIEWING ANGLES OF THE TEST MODELS AS OPPOSED TO A SINGLE VIEW PROVIDED BY WALL ARRAYS. PHASE I WILL FOCUS ON DESIGNING, BUILDING, AND TESTING THE MULTI-ARM AIRFOIL ARRAY TO TROUBLESHOOT OPERATION AND ELIMINATE SHOWSTOPPERS. FUNCTIONAL BEAMFORMING SOFTWARE IS CURRENTLY AVAILABLE AND DOES NOT REQUIRE FURTHER DEVELOPMENT THE RIGHTS OF WHICH ARE OWNED BY OPTINAV, INC. THE PI HAS A PLETHORA OF EXPERIENCE AND KNOWLEDGE IN ACOUSTICAL TESTING AND PHASED IMAGING ARRAYS AND WAS A KEY INVESTIGATOR IN EARLY CLOSED WIND TUNNEL ACOUSTICAL TESTING. THE PROPOSAL OUTLINES A WORK PLAN WHICH INCLUDES TESTING IN THE KIRSTEN WIND TUNNEL AT THE UNIVERSITY OF WASHINGTON WHICH HAS ALREADY AGREED TO SUPPORT THE TESTS.

Dates and value

Award date
Signed on Jun 4, 2014
Potential end of performance
Dec 18, 2014

Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Jun 4, 2014. View on USAspending · Recipient on SAM.gov

Recipient

LocationBELLEVUE, WA
UEIN173GUZWVDL6
Business sizeSmall businessSize at award, per the contracting officer
Parent companyOPTINAV INC

Business types and certifications

For-profit organizationSubchapter S corporationCorporation (not tax-exempt)Manufacturer of goods

As represented in SAM.gov at the time of the action.

Subcontracting network

The prime, the subcontractors on this award, and their own subcontractors.

Subaward amounts are self-reported by prime contractors to SAM.gov and appear 1 to 2 months after the work. Duplicates are removed on a best-effort basis. Totals are incomplete and not an audit. Source: USAspending.

Agency and place

Awarding and funding

Awarded by
  1. National Aeronautics and Space Administration
  2. NASA SHARED SERVICES CENTER
Funded by
  1. National Aeronautics and Space Administration
  2. NASA SHARED SERVICES CENTER

Place of performance

Place of performance
Bellevue, King County, Washington 98004-2928 United States Of America
Congressional district (place of performance)
WA-01As reported at the time of the action

Classification and competition

Classification

Competition

Extent competed
Full and open competition after exclusion of sourcesD
Solicitation procedures
Negotiated proposal/quoteNP
Set-aside
Small business set aside - totalSBA
Contract pricing
Firm fixed priceJ
Offers received
500

Solicitation and notices

Solicitation ID
NNX14SBIRSELECTPHASEI(as reported)

Contract details

Subcontracting plan
Plan not requiredB
Major program
Phased array technique for low signal-to-noise rat
Service Contract Act labor standards
No
Government-furnished property
Transaction does not use GFE/GFPN
Bundled requirement
Not a bundled requirementD
Consolidated requirement
No
Undefinitized action (terms not final)
No
Performance-based service acquisition
No - service where PBA is not used.N

Linked notices

Notice
Notice ID
Type
Link
Posted

Transaction history

Modification history

Base award
Jun 4, 2014Base obligation at award: $54,465
Latest action
Jun 4, 2014 — Base awardModification 0; obligation change +$54,465
Actions by type
  • Base award1
1 actions recorded, Jun 4, 2014 to Jun 4, 2014; each action counted once.

Similar awards

PIID
Match
Awardee

All contract data

All contract data

Every other field reported for this award, as of its latest reported action

Competition

Evaluation preference
No preference used
Simplified procedures for commercial items
No

Pricing and financing

Paid by purchase card
No
Latest action: change in base and exercised options
$54,465
Latest action: change in base and all options
$54,465

Socio-economic and policy

Recovered materials and sustainability
No clauses included and no sustainability includedC
EPA-designated product
Not requiredE
Research program (SBIR/STTR)
Small business innovation research program phase i actionSR1
Walsh-Healey Act (materials and supplies)
No
Construction wage rates (Davis-Bacon)
No

Place and origin

Domestic or foreign entity
U.S. owned businessA
Place of manufacture
Not a manufactured end productC

Structure

Award or IDV
Award
Award type
PoB
Awarding agency code
8000
Awarding sub-tier code
8000
Contracting office code
NSSC0
Transactions recorded under this award key
1

Funding

Funding agency code
8000
Funding sub-tier code
8000
Funding office code
NSSC0