GovChime
AWARDPOSmall business

Po NNX14CC34PGRIDQUANT TECHNOLOGIES, LLC

Overview

Award facts

Period of performance
Jun 20, 2014 to Dec 19, 2014
Ended
Modifications
0
Latest action Jun 19, 2014
Contract type
Po
PIID NNX14CC34P

Description of requirement

IGF::OT::IGF THE HOLOMORPHIC EMBEDDING LOAD FLOW METHOD (HELM) IS A BREAKTHROUGH THAT BRINGS SIGNIFICANT ADVANCES TO THE FIELD OF POWER SYSTEMS. IT PROVIDES A NON-ITERATIVE PROCEDURE TO COMPUTE, WITH MATHEMATICALLY PROVEN GUARANTEES EVEN NEAR VOLTAGE COLLAPSE, THE CORRECT OPERATIVE POWER FLOW SOLUTION, TO THE DESIRED ACCURACY. UNLIKE ITERATIVE METHODS, WHICH ARE INHERENTLY PRONE TO NONDETERMINISTIC CONVERGENCE FAILURES, HELM CAN BE USED AS THE FUNDAMENTAL BLOCK FOR BUILDING RELIABLE REAL-TIME NETWORK APPLICATIONS. THE MOST ADVANCED APPLICATIONS, WHICH RELY ON OPTIMAL SEARCH TECHNIQUES IN THE STATE-SPACE OF THE POWER SYSTEM AND PERFORM THOUSANDS OF EXPLORATORY POWER FLOWS, WOULD BE UNFEASIBLE WITH ANY OF THE ITERATIVE METHODS. THIS PROPOSAL ADDRESSES ONE OF THE NEEDS OF TOPIC S3.03, NAMELY THE NEED FOR INTELLIGENT, FAULT-TOLERANT PMAD TECHNOLOGIES TO EFFICIENTLY MANAGE SYSTEM POWER FOR DEEP SPACE MISSIONS. IT DOES SO AT A FOUNDATIONAL LEVEL, AS IT LAYS DOWN THE ALGORITHMIC TECHNOLOGY THAT WILL ENABLE A NEW CLASS OF REAL-TIME INTELLIGENT ALGORITHMS BASED ON RELIABLE, MODELBASED COMPUTATION. AN EXAMPLE OF THIS IN TERRESTRIAL GRIDS, WHICH HAS BEEN PROVEN IN ACTUAL DEPLOYMENTS AT SOME LARGE UTILITIES, IS A RESTORATION PLAN BUILDER, ABLE TO COMPUTE DETAILED RESTORATION PLANS IN REAL TIME, EQUALING OR SURPASSING THE ABILITIES OF HUMAN OPERATORS. THE APPROACH FOR PHASE I CONSISTS IN APPLYING THE NEW HELM POWER FLOW TECHNOLOGY TO THE RELEVANT MODELS FOR THE MICRO-GRIDS PRESENT ON CURRENT AND PROJECTED SPACECRAFT POWER SYSTEMS, VALIDATING AND BENCHMARKING THE SIMULATION RESULTS AGAINST OTHER CURRENT POWER FLOW TECHNOLOGIES. THIS WILL DEMONSTRATE HOW THIS TECHNOLOGY IS BETTER THAN THE STATE OF THE ART. BY HIGHLIGHTING THE MATHEMATICAL PROPERTIES OF THE METHOD (UNEQUIVOCAL RESULTS, 100% RELIABILITY) ON THE MODELS SPECIFIC TO AUTONOMOUS DC SPACECRAFT, WE WILL ESTABLISH THE VALIDITY AND ALSO THE STATUS OF HELM AS THE BUILDING BLOCK OF FUTURE INTELLIGENT APPLICATIONS.

Dates and value

Award date
Signed on Jun 19, 2014
Potential end of performance
Dec 18, 2014

Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Jun 19, 2014. View on USAspending · Recipient on SAM.gov

Recipient

LocationDULUTH, GA
UEIS5FBK2AMDK49
Business sizeSmall businessSize at award, per the contracting officer

Business types and certifications

For-profit organizationPartnership or LLP

As represented in SAM.gov at the time of the action.

Subcontracting network

The prime, the subcontractors on this award, and their own subcontractors.

Subaward amounts are self-reported by prime contractors to SAM.gov and appear 1 to 2 months after the work. Duplicates are removed on a best-effort basis. Totals are incomplete and not an audit. Source: USAspending.

Agency and place

Awarding and funding

Awarded by
  1. National Aeronautics and Space Administration
  2. NASA SHARED SERVICES CENTER
Funded by
  1. National Aeronautics and Space Administration
  2. NASA SHARED SERVICES CENTER

Place of performance

Place of performance
Duluth, Gwinnett County, Georgia 30097-7915 United States Of America
Congressional district (place of performance)
GA-04As reported at the time of the action

Classification and competition

Classification

Competition

Extent competed
Full and open competition after exclusion of sourcesD
Solicitation procedures
Negotiated proposal/quoteNP
Set-aside
Small business set aside - totalSBA
Contract pricing
Firm fixed priceJ
Offers received
500

Solicitation and notices

Solicitation ID
NNX14SBIRPHASEI(as reported)

Contract details

Subcontracting plan
Plan not requiredB
Major program
Holomorphic embedded load flow for autonomous spac
Service Contract Act labor standards
No
Government-furnished property
Transaction does not use GFE/GFPN
Bundled requirement
Not a bundled requirementD
Consolidated requirement
No
Undefinitized action (terms not final)
No
Performance-based service acquisition
No - service where PBA is not used.N

Linked notices

Notice
Notice ID
Type
Link
Posted

Transaction history

Modification history

Base award
Jun 19, 2014Base obligation at award: $123,930
Latest action
Jun 19, 2014 — Base awardModification 0; obligation change +$123,930
Actions by type
  • Base award1
1 actions recorded, Jun 19, 2014 to Jun 19, 2014; each action counted once.

Similar awards

PIID
Match
Awardee

All contract data

All contract data

Every other field reported for this award, as of its latest reported action

Competition

Evaluation preference
No preference used
Simplified procedures for commercial items
No

Pricing and financing

Paid by purchase card
No
Latest action: change in base and exercised options
$123,930
Latest action: change in base and all options
$123,930

Socio-economic and policy

Recovered materials and sustainability
No clauses included and no sustainability includedC
EPA-designated product
Not requiredE
Research program (SBIR/STTR)
Small business innovation research program phase i actionSR1
Walsh-Healey Act (materials and supplies)
No
Construction wage rates (Davis-Bacon)
No

Place and origin

Domestic or foreign entity
U.S. owned businessA
Place of manufacture
Not a manufactured end productC

Structure

Award or IDV
Award
Award type
PoB
Awarding agency code
8000
Awarding sub-tier code
8000
Contracting office code
NSSC0
Transactions recorded under this award key
1

Funding

Funding agency code
8000
Funding sub-tier code
8000
Funding office code
NSSC0