Po NNX14CC34PGRIDQUANT TECHNOLOGIES, LLC
Overview
Award facts
- Period of performance
- Jun 20, 2014 to Dec 19, 2014
- Ended
- Modifications
- 0
- Latest action Jun 19, 2014
- Contract type
- Po
- PIID NNX14CC34P
Description of requirement
IGF::OT::IGF THE HOLOMORPHIC EMBEDDING LOAD FLOW METHOD (HELM) IS A BREAKTHROUGH THAT BRINGS SIGNIFICANT ADVANCES TO THE FIELD OF POWER SYSTEMS. IT PROVIDES A NON-ITERATIVE PROCEDURE TO COMPUTE, WITH MATHEMATICALLY PROVEN GUARANTEES EVEN NEAR VOLTAGE COLLAPSE, THE CORRECT OPERATIVE POWER FLOW SOLUTION, TO THE DESIRED ACCURACY. UNLIKE ITERATIVE METHODS, WHICH ARE INHERENTLY PRONE TO NONDETERMINISTIC CONVERGENCE FAILURES, HELM CAN BE USED AS THE FUNDAMENTAL BLOCK FOR BUILDING RELIABLE REAL-TIME NETWORK APPLICATIONS. THE MOST ADVANCED APPLICATIONS, WHICH RELY ON OPTIMAL SEARCH TECHNIQUES IN THE STATE-SPACE OF THE POWER SYSTEM AND PERFORM THOUSANDS OF EXPLORATORY POWER FLOWS, WOULD BE UNFEASIBLE WITH ANY OF THE ITERATIVE METHODS. THIS PROPOSAL ADDRESSES ONE OF THE NEEDS OF TOPIC S3.03, NAMELY THE NEED FOR INTELLIGENT, FAULT-TOLERANT PMAD TECHNOLOGIES TO EFFICIENTLY MANAGE SYSTEM POWER FOR DEEP SPACE MISSIONS. IT DOES SO AT A FOUNDATIONAL LEVEL, AS IT LAYS DOWN THE ALGORITHMIC TECHNOLOGY THAT WILL ENABLE A NEW CLASS OF REAL-TIME INTELLIGENT ALGORITHMS BASED ON RELIABLE, MODELBASED COMPUTATION. AN EXAMPLE OF THIS IN TERRESTRIAL GRIDS, WHICH HAS BEEN PROVEN IN ACTUAL DEPLOYMENTS AT SOME LARGE UTILITIES, IS A RESTORATION PLAN BUILDER, ABLE TO COMPUTE DETAILED RESTORATION PLANS IN REAL TIME, EQUALING OR SURPASSING THE ABILITIES OF HUMAN OPERATORS. THE APPROACH FOR PHASE I CONSISTS IN APPLYING THE NEW HELM POWER FLOW TECHNOLOGY TO THE RELEVANT MODELS FOR THE MICRO-GRIDS PRESENT ON CURRENT AND PROJECTED SPACECRAFT POWER SYSTEMS, VALIDATING AND BENCHMARKING THE SIMULATION RESULTS AGAINST OTHER CURRENT POWER FLOW TECHNOLOGIES. THIS WILL DEMONSTRATE HOW THIS TECHNOLOGY IS BETTER THAN THE STATE OF THE ART. BY HIGHLIGHTING THE MATHEMATICAL PROPERTIES OF THE METHOD (UNEQUIVOCAL RESULTS, 100% RELIABILITY) ON THE MODELS SPECIFIC TO AUTONOMOUS DC SPACECRAFT, WE WILL ESTABLISH THE VALIDITY AND ALSO THE STATUS OF HELM AS THE BUILDING BLOCK OF FUTURE INTELLIGENT APPLICATIONS.
Dates and value
- Award date
- Signed on Jun 19, 2014
- Potential end of performance
- Dec 18, 2014
Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Jun 19, 2014. View on USAspending · Recipient on SAM.gov
Recipient
Business types and certifications
As represented in SAM.gov at the time of the action.
Subcontracting network
The prime, the subcontractors on this award, and their own subcontractors.
Agency and place
Awarding and funding
- Awarded by
- National Aeronautics and Space Administration
- NASA SHARED SERVICES CENTER
- Funded by
- National Aeronautics and Space Administration
- NASA SHARED SERVICES CENTER
Place of performance
- Place of performance
- Duluth, Gwinnett County, Georgia 30097-7915 United States Of America
- Congressional district (place of performance)
- GA-04As reported at the time of the action
Classification and competition
Classification
- Product or service (PSC)
- AR11R&D- SPACE: AERONAUTICS/SPACE TECHNOLOGY (BASIC RESEARCH) (research and development)
Competition
- Extent competed
- Full and open competition after exclusion of sourcesD
- Solicitation procedures
- Negotiated proposal/quoteNP
- Set-aside
- Small business set aside - totalSBA
- Contract pricing
- Firm fixed priceJ
- Offers received
- 500
Solicitation and notices
- Solicitation ID
- NNX14SBIRPHASEI(as reported)
Contract details
- Subcontracting plan
- Plan not requiredB
- Major program
- Holomorphic embedded load flow for autonomous spac
- Service Contract Act labor standards
- No
- Government-furnished property
- Transaction does not use GFE/GFPN
- Bundled requirement
- Not a bundled requirementD
- Consolidated requirement
- No
- Undefinitized action (terms not final)
- No
- Performance-based service acquisition
- No - service where PBA is not used.N
Linked notices
Notice | Notice ID | Type | Link | Posted |
|---|---|---|---|---|
Transaction history
Modification history
- Base award
- Jun 19, 2014Base obligation at award: $123,930
- Latest action
- Jun 19, 2014 — Base awardModification 0; obligation change +$123,930
- Actions by type
- Base award1
Similar awards
PIID | Match | Awardee |
|---|---|---|
All contract data
All contract data
Every other field reported for this award, as of its latest reported action
Competition
- Evaluation preference
- No preference used
- Simplified procedures for commercial items
- No
Pricing and financing
- Paid by purchase card
- No
- Latest action: change in base and exercised options
- $123,930
- Latest action: change in base and all options
- $123,930
Socio-economic and policy
- Recovered materials and sustainability
- No clauses included and no sustainability includedC
- EPA-designated product
- Not requiredE
- Research program (SBIR/STTR)
- Small business innovation research program phase i actionSR1
- Walsh-Healey Act (materials and supplies)
- No
- Construction wage rates (Davis-Bacon)
- No
Place and origin
- Domestic or foreign entity
- U.S. owned businessA
- Place of manufacture
- Not a manufactured end productC
Structure
- Award or IDV
- Award
- Award type
- PoB
- Awarding agency code
- 8000
- Awarding sub-tier code
- 8000
- Contracting office code
- NSSC0
- Transactions recorded under this award key
- 1
Funding
- Funding agency code
- 8000
- Funding sub-tier code
- 8000
- Funding office code
- NSSC0