GovChime
AWARDDEFINITIVE CONTRACTSmall business

Definitive contract NNX14CD17CROLLING HILLS RESEARCH CORPORATION

Overview

Award facts

Period of performance
Sep 21, 2016 to Dec 9, 2016
Ended
Modifications
5
Latest action Sep 21, 2016
Contract type
Definitive contract
PIID NNX14CD17C

Description of requirement

IGF::OT::IGF A HYBRID ELECTRIC AIRCRAFT SIMULATION SYSTEM AND TEST BED IS PROPOSED TO PROVIDE A DEDICATED DEVELOPMENT ENVIRONMENT FOR THE RIGOROUS STUDY AND ADVANCEMENT OF HYBRID ELECTRIC POWERED AIRCRAFT. THE NEW TEST BED AND SIMULATION SYSTEM WILL PROVIDE A DEDICATED PLATFORM AND SET OF ANALYSIS TOOLS TO STUDY, DESIGN, AND TEST HYBRID ELECTRIC POWERED PROPULSION COMPONENTS AND SYSTEMS FOR USE IN COMMERCIAL, GENERAL AVIATION, MILITARY, AND UAV SYSTEMS. THE TEST BED WILL ALLOW VARIOUS HYBRID ELECTRIC PROPULSION SYSTEM TECHNOLOGIES TO BE TESTED TO DETERMINE PERFORMANCE, RELIABILITY, SAFETY, AND COST. THESE INCLUDE VARIOUS MOTORS, MOTOR CONTROLLERS,GAS TURBINES, BATTERIES, FUEL CELLS, SUPER CAPACITORS, PROPELLER, AND FAN TECHNOLOGIES. ADDITIONALLY, THE PLATFORM COULD BE USED TO INVESTIGATE PERFORMANCE CHARACTERISTICS UNIQUE TO HYBRID ELECTRIC PROPULSION, DETERMINE THE MOST ACCURATE METHODS FOR MEASURING ENERGY USED AND REMAINING, AND RESEARCH REDUNDANCY POSSIBILITIES UNIQUE TO HYBRID ELECTRIC AIRCRAFT. STUDIES PERFORMED DURING PHASE I DEMONSTRATED THAT PURE ELECTRIC AIRCRAFT ARE LIMITED IN RANGE AND ENDURANCE BY THE SPECIFIC ENERGY OF CURRENT BATTERY TECHNOLOGY. ALTHOUGH THERE IS A GREAT DEAL OF EFFORT BEING PUT INTO ADVANCED BATTERIES, THE MOST PRACTICAL SOLUTION IN THE NEAR TERM IS TO UTILIZE A HYBRID ELECTRIC SYSTEM. THE PROPOSED PHASE II PROGRAM BUILDS UPON THE PHASE I RESULTS BY DEVELOPING A DETAILED PROPULSION SYSTEM SIMULATOR MODEL FOR HYBRID ELECTRIC PROPULSION SYSTEMS, WITH THE ULTIMATE GOAL OF A BENCH TEST MODEL OF THE PROPULSION SYSTEM. USING A DETAILED MULTI-PLATFORM/MISSION TRADE STUDY, A COUPLED PARALLEL, UNCOUPLED SERIES, AND SPLIT SERIES-PARALLEL HYBRID SYSTEM ARCHITECTURE WILL BE COMPARED TO DETERMINE THE MOST ADVANTAGEOUS AND EFFICIENT. THE PROPULSION SYSTEM SIMULATOR WILL ALSO BE USED TO PERFORM A SENSITIVITY ANALYSIS OF EACH ARCHITECTURE TO DETERMINE CRITICAL PERFORMANCE ASPECTS FOR INDIVIDUAL COMPONENTS.

Dates and value

Award date
Signed on Sep 11, 2014
Potential end of performance
Dec 8, 2016

Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Sep 21, 2016. View on USAspending · Recipient on SAM.gov

Recipient

LocationEL SEGUNDO, CA
UEIFJJKN8NZBL51
Business sizeSmall businessSize at award, per the contracting officer

Business types and certifications

For-profit organizationCorporation (not tax-exempt)Manufacturer of goods

As represented in SAM.gov at the time of the action.

Subcontracting network

The prime, the subcontractors on this award, and their own subcontractors.

Subaward amounts are self-reported by prime contractors to SAM.gov and appear 1 to 2 months after the work. Duplicates are removed on a best-effort basis. Totals are incomplete and not an audit. Source: USAspending.

Agency and place

Awarding and funding

Awarded by
  1. National Aeronautics and Space Administration
  2. NASA SHARED SERVICES CENTER
Funded by
  1. National Aeronautics and Space Administration
  2. NASA SHARED SERVICES CENTER

Place of performance

Place of performance
El Segundo, Los Angeles County, California 90245-2822
Congressional district (place of performance)
CA-36As reported at the time of the action

Classification and competition

Classification

Competition

Extent competed
Full and open competition after exclusion of sourcesD
Solicitation procedures
Negotiated proposal/quoteNP
Set-aside
Small business set aside - totalSBA
Contract pricing
Firm fixed priceJ
Offers received
500

Solicitation and notices

Solicitation ID
NNX14STTRPHASEII(as reported)

Contract details

Subcontracting plan
Plan not requiredB
Major program
Modular electric propulsion test bed aircraft
Cost Accounting Standards clause
No - CAS waiver approvedN
Certified cost or pricing data
No
Service Contract Act labor standards
No
Commercial procedures
Commercial item procedures not usedD
Government-furnished property
Transaction does not use GFE/GFPN
Bundled requirement
Not a bundled requirementD
Consolidated requirement
No
Undefinitized action (terms not final)
No
Multi-year contract
Yes
Performance-based service acquisition
No - service where PBA is not used.N

Linked notices

Notice
Notice ID
Type
Link
Posted

Transaction history

Modification history

Base award
Sep 11, 2014Base obligation at award: $750,000
Latest action
Sep 21, 2016 — Other administrative actionModification 5; administrative: no change in scope or value
Actions by type
  • Base award1
  • Other administrative action5
6 actions recorded, Sep 11, 2014 to Sep 21, 2016; each action counted once.

Similar awards

PIID
Match
Awardee

All contract data

All contract data

Every other field reported for this award, as of its latest reported action

Competition

Evaluation preference
No preference used
Local area set-aside
No
Simplified procedures for commercial items
No
A-76 (FAIR Act) action
No

Pricing and financing

Paid by purchase card
No

Socio-economic and policy

Recovered materials and sustainability
No clauses included and no sustainability includedC
EPA-designated product
Not requiredE
Clinger-Cohen Act planning (IT)
No
Research program (SBIR/STTR)
Small technology transfer research program phase iiST2
Walsh-Healey Act (materials and supplies)
No
Construction wage rates (Davis-Bacon)
No

Place and origin

Domestic or foreign entity
U.S. owned businessA
Country of product or service origin
United statesUSA
Place of manufacture
Not a manufactured end productC

Structure

Award or IDV
Award
Award type
Definitive contractD
Awarding agency code
8000
Awarding sub-tier code
8000
Contracting office code
80NSSC
Transactions recorded under this award key
6

Funding

Funding agency code
8000
Funding sub-tier code
8000
Funding office code
80NSSC