Po NNX14CG19PTHINKING SYSTEMS, INC
Overview
Award facts
- Period of performance
- Jun 20, 2014 to Dec 19, 2014
- Ended
- Modifications
- 0
- Latest action May 28, 2014
- Contract type
- Po
- PIID NNX14CG19P
Description of requirement
IGF::OT::IGF THE GENERAL MISSION ANALYSIS TOOL (GMAT) IS A STATE OF THE ART SPACECRAFT MISSION DESIGN TOOL UNDER ACTIVE DEVELOPMENT AT NASA'S GODDARD SPACE FLIGHT CENTER (GSFC). GMAT IS AN OPEN SOURCE PROJECT, PERIODICALLY RELEASING CODE ON PUBLICLY ACCESSIBLE REPOSITORIES. THE TOOL HAS RECENTLY BEEN OPERATIONALLY CERTIFIED FOR USE PLANNING MANEUVERS FOR THE ADVANCED COMPOSITION EXPLORER (ACE). THE CURRENT IMPLEMENTATION OF GMAT IS BUILT ON AN ARCHITECTURE THAT WAS ORIGINALLY DESIGNED TO SUPPORT MULTIPLE PARALLEL RUNS OF SPACE FLIGHT PROBLEMS ON A DISTRIBUTED PROCESSING PLATFORM. THE IMPLEMENTATION OF GMAT, TO DATE, HAS NOT EXERCISED THE FEATURES OF THE DESIGN THAT MAKE PARALLEL PROCESSING AVAILABLE TO USERS. THE GMAT PROGRAM IN ITS CURRENT IMPLEMENTATION RUNS ON A SINGLE EXECUTION THREAD ON MODERN COMPUTER SYSTEMS, EVEN WHEN THOSE SYSTEMS CONTAIN MULTIPLE PROCESSING CORES THAT ALLOW FOR PARALLEL EXECUTION OF OPERATIONS. THINKING SYSTEMS IS EQUIPPED TO UNDERTAKE THE TASK OF CODING COMPONENTS THAT PLUG INTO GMAT'S BASE CODE LIBRARIES IN ORDER TO PRODUCE AN EFFICIENT PARALLELIZATION OF GMAT'S CAPABILITIES. THE PARALLELIZATION OF GMAT WILL BE BUILT BY BUILDING REPLACEMENT ELEMENTS OF SEVERAL COMPONENTS OF GMAT'S CORE CONTROL ENGINE AND BY IMPLEMENTING USER SCRIPTABLE ELEMENTS THAT CAPITALIZE ON THESE CORE COMPONENTS TO PROVIDE PROCESSING ON MULTIPLE THREADS SIMULTANEOUSLY. THINKING SYSTEMS WILL CONSTRUCT THESE COMPONENTS IN A WAY THAT ALLOWS THE PARALLEL PROCESSING ENGINE TO RUN USING GMAT'S CORE LIBRARY CODE. THE PARALLEL ENGINE WILL BE BUILT TO WORK ALONGSIDE EXISTING GMAT CODE, AND WILL BE ACCESSED USING A SEPARATE USER INTERFACE TAILORED TO THE PARALLEL ENGINE. EXAMPLES OF THE TYPES OF PROBLEMS THAT BENEFIT FROM THE PROPOSED SYSTEM ARE PARAMETRIC STUDIES USING SYSTEMATIC CHANGES IN ONE OR MORE PARAMETERS, MONTE CARLO ANALYSIS PROBLEMS, LARGE SCALE TARGETING PROBLEMS, AND DISPERSION ANALYSIS STUDIES
Dates and value
- Award date
- Signed on May 28, 2014
- Potential end of performance
- Dec 18, 2014
Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded May 28, 2014. View on USAspending · Recipient on SAM.gov
Recipient
Business types and certifications
As represented in SAM.gov at the time of the action.
Subcontracting network
The prime, the subcontractors on this award, and their own subcontractors.
Agency and place
Awarding and funding
- Awarded by
- National Aeronautics and Space Administration
- NASA SHARED SERVICES CENTER
- Funded by
- National Aeronautics and Space Administration
- NASA SHARED SERVICES CENTER
Place of performance
- Place of performance
- Tucson, Pima County, Arizona 85718-2025 United States Of America
- Congressional district (place of performance)
- AZ-06As reported at the time of the action
Classification and competition
Classification
- Product or service (PSC)
- AR11R&D- SPACE: AERONAUTICS/SPACE TECHNOLOGY (BASIC RESEARCH) (research and development)
Competition
- Extent competed
- Full and open competition after exclusion of sourcesD
- Solicitation procedures
- Negotiated proposal/quoteNP
- Set-aside
- Small business set aside - totalSBA
- Contract pricing
- Firm fixed priceJ
- Offers received
- 500
Solicitation and notices
- Solicitation ID
- NNX14SBIRPHASEI(as reported)
Contract details
- Subcontracting plan
- Plan not requiredB
- Major program
- Parallel enhancements of the general mission analy
- Service Contract Act labor standards
- No
- Government-furnished property
- Transaction does not use GFE/GFPN
- Bundled requirement
- Not a bundled requirementD
- Consolidated requirement
- No
- Undefinitized action (terms not final)
- No
- Performance-based service acquisition
- No - service where PBA is not used.N
Linked notices
Notice | Notice ID | Type | Link | Posted |
|---|---|---|---|---|
Transaction history
Modification history
- Base award
- May 28, 2014Base obligation at award: $89,944
- Latest action
- May 28, 2014 — Base awardModification 0; obligation change +$89,944
- Actions by type
- Base award1
Similar awards
PIID | Match | Awardee |
|---|---|---|
All contract data
All contract data
Every other field reported for this award, as of its latest reported action
Competition
- Evaluation preference
- No preference used
- Simplified procedures for commercial items
- No
Pricing and financing
- Paid by purchase card
- No
- Latest action: change in base and exercised options
- $89,944
- Latest action: change in base and all options
- $89,944
Socio-economic and policy
- Recovered materials and sustainability
- No clauses included and no sustainability includedC
- EPA-designated product
- Not requiredE
- Research program (SBIR/STTR)
- Small business innovation research program phase i actionSR1
- Walsh-Healey Act (materials and supplies)
- No
- Construction wage rates (Davis-Bacon)
- No
Place and origin
- Domestic or foreign entity
- U.S. owned businessA
- Place of manufacture
- Not a manufactured end productC
Structure
- Award or IDV
- Award
- Award type
- PoB
- Awarding agency code
- 8000
- Awarding sub-tier code
- 8000
- Contracting office code
- NSSC0
- Transactions recorded under this award key
- 1
Funding
- Funding agency code
- 8000
- Funding sub-tier code
- 8000
- Funding office code
- NSSC0