Po NNX14CM17PLITTLE PRAIRIE SERVICES LLC
Overview
Award facts
- Period of performance
- Jun 20, 2014 to Dec 19, 2014
- Ended
- Modifications
- 0
- Latest action Jun 4, 2014
- Contract type
- Po
- PIID NNX14CM17P
Description of requirement
IGF::OT::IGF HISTORICALLY, DESIGNING A NUCLEAR THERMAL ROCKET ENGINE AND DETERMINING FUEL PERFORMANCE HAS BEEN A REFRACTORY AND ANFRACTUOUS PROCESS. TYPICALLY, FUEL FORMS WOULD BE DEVELOPED AND TESTED IN SEPARATE TESTS OF MECHANICAL, RADIATION AND THERMAL TESTING, AND, IN THE NERVA PROGRAM, THE FUEL ELEMENTS WERE ASSEMBLED IN A ROCKET ENGINE AND TESTED. THE FUEL DID NOT PERFORM TO EXPECTATIONS, AND THE ENGINE NEEDED TO BE DISASSEMBLED, THE FUEL EXAMINED AND FIXED NEEDED TO BE DETERMINED; THEN THE PROCESS WOULD REPEAT ITSELF. IN THE SPACE NUCLEAR THERMAL PROPULSION PROGRAM, INDIVIDUAL FUEL ELEMENTS WERE TESTED, BUT THEY COULD NOT BE TESTED TO FULL POWER DENSITY DUE TO TEST REACTOR LIMITATIONS. NEVERTHELESS, THIS WAS A FAR LESS EXPENSIVE APPROACH THAT FULL ENGINE TESTING TO DETERMINE WHETHER THE FUEL ELEMENTS IN PARTICULAR WOULD WITHSTAND THE RIGORS OF THE NRE (NUCLEAR ROCKET ENGINE) MISSION. THIS PROPOSAL OUTLINE HOW LPS AND ITS TEAM MEMBERS PLAN TO INTEGRATE THE LATEST IN MULTI-PHYSICS MODEL TO SIMULATE A FUEL ELEMENT BASED ON A PARTICULAR NRE DESIGN BUILT UP FROM DESIGNER PARAMETERS. THE MULTI-PHYSICS MODULES CAN DETERMINE FUEL INTEGRITY AND FISSION PRODUCT RETENTION AS A FUNCTION OF TEMPERATURE AND OPERATING TIMES, DETERMINE MICRO-STRUCTURE EVOLUTION INCLUDING CRACKING AND GRAIN GROWTH. THE FUEL ELEMENT PARAMETERS ARE DERIVED FROM HIGH LEVEL NRE REQUIREMENTS VIA THE INTEGRATION OF THE IROC (INTEGRATED ROCKET OPTIMIZATION CODE), LINKED WITH PHOENIX, A PROGRAM LINKING MULTIPHYSICS MODULES THROUGH MOOSE (MULTI-PHYSICS OBJECT-ORIENTED SIMULATION ENVIRONMENT)ULTIMATELY, DETAILED SAFETY RELATED INFORMATION INCLUDING RESULTS OF IMPACT ANALYSES THROUGH EXTENSIVE HYDRO-CODES SUCH AS PRONTO/SPH AND RADIATION TRANSPORT CODES SUCH AS MACCS2. THIS ENABLES SAFETY TO BE INTEGRATED IN FROM THE VERY BEGINNING OF THE DESIGN PROCESS RESULTING IN A MUCH MORE OPTIMIZED SAFETY BASED NUCLEAR ROCKET ENGINE.
Dates and value
- Award date
- Signed on Jun 4, 2014
- Potential end of performance
- Dec 18, 2014
Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Jun 4, 2014. View on USAspending · Recipient on SAM.gov
Recipient
Business types and certifications
As represented in SAM.gov at the time of the action.
Subcontracting network
The prime, the subcontractors on this award, and their own subcontractors.
Agency and place
Awarding and funding
- Awarded by
- National Aeronautics and Space Administration
- NASA SHARED SERVICES CENTER
- Funded by
- National Aeronautics and Space Administration
- NASA SHARED SERVICES CENTER
Place of performance
- Place of performance
- Edgewood, Santa Fe County, New Mexico 87015-9798 United States Of America
- Congressional district (place of performance)
- NM-01As reported at the time of the action
Classification and competition
Classification
- Product or service (PSC)
- AR11R&D- SPACE: AERONAUTICS/SPACE TECHNOLOGY (BASIC RESEARCH) (research and development)
Competition
- Extent competed
- Full and open competition after exclusion of sourcesD
- Solicitation procedures
- Negotiated proposal/quoteNP
- Set-aside
- Small business set aside - totalSBA
- Contract pricing
- Firm fixed priceJ
- Offers received
- 500
Solicitation and notices
- Solicitation ID
- NNX14SBIRPHASEI(as reported)
Contract details
- Subcontracting plan
- Plan not requiredB
- Major program
- Integrated multi-physics and advanced diagnostics
- Service Contract Act labor standards
- No
- Government-furnished property
- Transaction does not use GFE/GFPN
- Bundled requirement
- Not a bundled requirementD
- Consolidated requirement
- No
- Undefinitized action (terms not final)
- No
- Performance-based service acquisition
- No - service where PBA is not used.N
Linked notices
Notice | Notice ID | Type | Link | Posted |
|---|---|---|---|---|
Transaction history
Modification history
- Base award
- Jun 4, 2014Base obligation at award: $124,694
- Latest action
- Jun 4, 2014 — Base awardModification 0; obligation change +$124,694
- Actions by type
- Base award1
Similar awards
PIID | Match | Awardee |
|---|---|---|
All contract data
All contract data
Every other field reported for this award, as of its latest reported action
Competition
- Evaluation preference
- No preference used
- Simplified procedures for commercial items
- No
Pricing and financing
- Paid by purchase card
- No
- Latest action: change in base and exercised options
- $124,694
- Latest action: change in base and all options
- $124,694
Socio-economic and policy
- Recovered materials and sustainability
- No clauses included and no sustainability includedC
- EPA-designated product
- Not requiredE
- Research program (SBIR/STTR)
- Small business innovation research program phase i actionSR1
- Walsh-Healey Act (materials and supplies)
- No
- Construction wage rates (Davis-Bacon)
- No
Place and origin
- Domestic or foreign entity
- U.S. owned businessA
- Place of manufacture
- Not a manufactured end productC
Structure
- Award or IDV
- Award
- Award type
- PoB
- Awarding agency code
- 8000
- Awarding sub-tier code
- 8000
- Contracting office code
- NSSC0
- Transactions recorded under this award key
- 1
Funding
- Funding agency code
- 8000
- Funding sub-tier code
- 8000
- Funding office code
- NSSC0