Definitive contract NNX15CC10CGRIDQUANT TECHNOLOGIES, LLC
Overview
Award facts
- Net obligations
- $748.17K
- $748,170of $748.17K potential value
- Period of performance
- Apr 17, 2017 to Jun 8, 2017
- Ended
- Modifications
- 1
- Latest action Apr 17, 2017
- Contract type
- Definitive contract
- PIID NNX15CC10C
Description of requirement
IGF::OT::IGF THE PROPOSED INNOVATION ADVANCES THE ABILITY TO APPLY THE HOLOMORPHIC EMBEDDING LOAD FLOW TECHNOLOGY (HELM ) METHOD TO PROVIDE DETERMINISTIC LOAD FLOW MODELING FOR SPACECRAFT POWER SYSTEMS. FUTURE DEEP-SPACE VEHICLES NEED INTELLIGENT, FAULT-TOLERANT AND AUTONOMOUS CONTROL OF POWER MANAGEMENT AND DISTRIBUTION. DUE TO COMMUNICATIONS LATENCY, CONTROL ALGORITHMS FOR FUTURE AUTONOMOUS SPACE POWER SYSTEMS NEED TO BE VERY ROBUST, HIGHLY RELIABLE AND FAULT TOLERANT. MODELING OF LOAD FLOWS IS VITAL BOTH TO DESIGN SPACECRAFT POWER SYSTEMS AND TO OPERATE THEM AUTONOMOUSLY. A KEY ELEMENT IS STATE ESTIMATION GIVEN THE AVAILABLE SENSORS AND THEIR READINGS, WHAT IS THE REAL STATE OF THE SYSTEM? WHAT ACTION IS REQUIRED TO MAINTAIN OPERATION? STATE ESTIMATION IS ESPECIALLY IMPORTANT WHEN THE SYSTEM IS IN AN OFF-NOMINAL CONDITION. HUMAN OPERATORS DRAW UPON EXPERIENCE TO INTEGRATE OFF-NOMINAL SENSOR READINGS AND DEVELOP A GESTALT OF SYSTEM STATE, BUT AUTONOMOUS OPERATION REQUIRES COMPUTATION. CURRENT MODELING TECHNIQUES (I.E., NEWTON-RAPHSON (NR) OPTIMIZATION) ARE NOT EQUAL TO THIS TASK DUE TO THEIR ITERATIVE NATURE AND INITIAL POINT DEPENDENCY. MANY OFF-NOMINAL CASES CANNOT BE SOLVED AT ALL USING NR. WORSE, EVEN MORE OFF-NOMINAL CASES APPEAR TO BE SOLVABLE USING NR, BUT THE SOLUTIONS ARE ACTUALLY INVALID. AN NR-BASED AUTONOMOUS CONTROL SYSTEM FACED WITH OFF-NOMINAL CONDITIONS WILL REACH AN INCORRECT CONCLUSION MORE OFTEN THAN NOT, WITH POTENTIALLY CATASTROPHIC CONSEQUENCES FOR THE SPACECRAFT. BY CONTRAST, HELM PROVIDES DETERMINISTIC SOLUTIONS FOR OFF-NOMINAL STATES, WITHOUT DEPENDENCE ON INITIAL SOLUTION SEEDS, THEREBY PROVIDING THE LEVEL OF FIDELITY AND SURETY NEEDED TO DEVELOP AN AUTONOMOUS SYSTEM. IN PHASE I, GRIDQUANT TECHNOLOGIES LLC SUCCESSFULLY ADAPTED HELM TO SOLVE THE NON-LINEARITY PROBLEMS OF A SMALL DC MICRO-GRID, WHICH WILL ENABLE NASA TO DEVELOP AND IMPLEMENT THE ADVANCED ARCHITECTURES NEEDED FOR FUTURE LONG-TERM DEEP-SPACE EXPLORATION.
Dates and value
- Award date
- Signed on Jun 9, 2015
- Potential end of performance
- Jun 7, 2017
- Current value
- $748,170Base and exercised options
- Potential value (if all options are exercised)
- $748,170
Obligations by fiscal year of action
- FY2015: $748,170
Total across 1 fiscal year: $748,170
Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Apr 17, 2017. View on USAspending · Recipient on SAM.gov
Recipient
Business types and certifications
As represented in SAM.gov at the time of the action.
Subcontracting network
The prime, the subcontractors on this award, and their own subcontractors.
Agency and place
Awarding and funding
- Awarded by
- National Aeronautics and Space Administration
- NASA SHARED SERVICES CENTER
- Funded by
- National Aeronautics and Space Administration
- NASA SHARED SERVICES CENTER
Place of performance
- Place of performance
- Duluth, Gwinnett County, Georgia 30097-2212
- Congressional district (place of performance)
- GA-04As reported at the time of the action
Classification and competition
Classification
- Product or service (PSC)
- AR11R&D- SPACE: AERONAUTICS/SPACE TECHNOLOGY (BASIC RESEARCH) (research and development)
Competition
- Extent competed
- Full and open competition after exclusion of sourcesD
- Solicitation procedures
- Negotiated proposal/quoteNP
- Set-aside
- Small business set aside - totalSBA
- Contract pricing
- Firm fixed priceJ
- Offers received
- 500
Contract details
- Subcontracting plan
- Plan not requiredB
- Major program
- Holomorphic embedded load flow for autonomous spacecraft power systems
- Cost Accounting Standards clause
- No - CAS waiver approvedN
- Certified cost or pricing data
- No
- Service Contract Act labor standards
- No
- Commercial procedures
- Commercial item procedures not usedD
- Government-furnished property
- Transaction does not use GFE/GFPN
- Bundled requirement
- Not a bundled requirementD
- Consolidated requirement
- No
- Undefinitized action (terms not final)
- No
- Multi-year contract
- Yes
- Performance-based service acquisition
- No - service where PBA is not used.N
Linked notices
Notice | Notice ID | Type | Link | Posted |
|---|---|---|---|---|
Transaction history
Modification history
- Base award
- Jun 9, 2015Base obligation at award: $748,170
- Latest action
- Apr 17, 2017 — Other administrative actionModification 1; administrative: no change in scope or value
- Actions by type
- Base award1
- Other administrative action1
Similar awards
PIID | Match | Awardee |
|---|---|---|
All contract data
All contract data
Every other field reported for this award, as of its latest reported action
Competition
- Evaluation preference
- No preference used
- Local area set-aside
- No
- Simplified procedures for commercial items
- No
- A-76 (FAIR Act) action
- No
Pricing and financing
- Paid by purchase card
- No
Socio-economic and policy
- Recovered materials and sustainability
- No clauses included and no sustainability includedC
- EPA-designated product
- Not requiredE
- Clinger-Cohen Act planning (IT)
- No
- Research program (SBIR/STTR)
- Small business innovation research program phase ii actionSR2
- Walsh-Healey Act (materials and supplies)
- No
- Construction wage rates (Davis-Bacon)
- No
Place and origin
- Domestic or foreign entity
- U.S. owned businessA
- Country of product or service origin
- United statesUSA
- Place of manufacture
- Not a manufactured end productC
Structure
- Award or IDV
- Award
- Award type
- Definitive contractD
- Awarding agency code
- 8000
- Awarding sub-tier code
- 8000
- Contracting office code
- 80NSSC
- Transactions recorded under this award key
- 2
Funding
- Funding agency code
- 8000
- Funding sub-tier code
- 8000
- Funding office code
- 80NSSC