GovChime
AWARDPOSmall business

Po NNX15CC41PCONCEPTS TO SYSTEMS INC.

Overview

Award facts

Period of performance
Jun 17, 2015 to Dec 17, 2015
Ended
Modifications
0
Latest action Jun 10, 2015
Contract type
Po
PIID NNX15CC41P

Description of requirement

IGF::OT::IGF THE VIBROACOUSTIC CHARACTERISTICS OF STRUCTURES ARE VITAL IN DETERMINING THE OPERATIONAL ENVELOPE AND MISSION FEASIBILITIES. THE SOURCES OF VIBROACOUSTIC EXCITATION ARE MAINLY DUE TO NOISE GENERATED BY THE LAUNCHER DURING IGNITION, LIFT-OFF, AND ATMOSPHERIC FLIGHT. TYPICALLY, FOAM OR FIBERGLASS CLADDINGS AND CORES OR ACOUSTIC LINERS WHICH INCORPORATE RESONATING CHAMBERS ARE USED TO PREVENT THE TRANSMISSION OF SOUND THROUGH SUCH STRUCTURAL LOCATIONS. HOWEVER, THIS APPROACH IS FOUND TO BE INEFFECTIVE FOR VIBROACOUSTIC SOURCES WITH DOMINANT FREQUENCY CONTENT BELOW 400 HZ. IT IS PROPOSED TO DEVELOP A METAMATERIAL-INSPIRED COMPOSITE STRUCTURE INCORPORATING LOW-FREQUENCY VIBRO-IMPACT RESONATING ELEMENTS COUPLED WITH CONVENTIONAL HIGH-FREQUENCY ACOUSTIC ABSORBERS. THE IDEA IS TO EMPLOY STRUCTURALLY-INTEGRAL TUNED RESONATORS TO PICK UP ENERGY FROM INCIDENT LOW-FREQUENCY SOUND WAVES AND UTILIZING THE MECHANISM OF FREQUENCY UP-CONVERSION VIA IMPACTS, TRANSFER THE ENERGY TO HIGHER MODES IN THE SANDWICH PRIMARY STRUCTURE FOR SUBSEQUENT DISSIPATION WITH CONVENTIONAL ACOUSTIC ABSORBERS. THE ADVANTAGE OF THE PROPOSED STRUCTURE WOULD BE IN REDUCING THE TRANSMITTED PRESSURE OF LOW FREQUENCY WAVES, FOR WHICH CONVENTIONAL METHODS ARE INEFFECTIVE. OUR INITIAL BOUND FOR THE ATTACHMENT MASS IS WITHIN 5 TO 10% OF THE BASELINE STRUCTURE TO SHOW SIGNIFICANT PEAK PRESSURE REDUCTION FOR LF WAVES. THE STATE-OF-THE-ART CONVENTIONAL ABSORBERS PROVIDE ABOUT 10-20% SOUND TRANSMISSION LOSS (STL) IN THE 100-150 HZ RANGE. OUR PERFORMANCE OBJECTIVE IS TO ACHIEVE STL OF ABOUT 50-60% IN FREQUENCY RANGE BELOW 400 HZ WITH 5-10% MASS INCREASE WITHOUT DETERIORATING STIFFNESS RESPONSE OF THE STRUCTURE. SUCCESSFUL COMPLETION OF PHASE I WORK WILL RESULT IN A "PROOF-OF-CONCEPT" MIAS UNIT CELL. IN PHASE II, DETAILED DESIGN AND FABRICATION OF THE MIAS PROTOTYPE PANEL WILL BE COMPLETED.

Dates and value

Award date
Signed on Jun 10, 2015
Potential end of performance
Dec 16, 2015

Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Jun 10, 2015. View on USAspending · Recipient on SAM.gov

Recipient

LocationDANVILLE, VA
UEIQ22YAM8ME4A8
Business sizeSmall businessSize at award, per the contracting officer

Business types and certifications

Minority-ownedSelf-certified small disadvantaged businessFor-profit organizationCorporation (not tax-exempt)

As represented in SAM.gov at the time of the action.

Subcontracting network

The prime, the subcontractors on this award, and their own subcontractors.

Subaward amounts are self-reported by prime contractors to SAM.gov and appear 1 to 2 months after the work. Duplicates are removed on a best-effort basis. Totals are incomplete and not an audit. Source: USAspending.

Agency and place

Awarding and funding

Awarded by
  1. National Aeronautics and Space Administration
  2. NASA SHARED SERVICES CENTER
Funded by
  1. National Aeronautics and Space Administration
  2. NASA SHARED SERVICES CENTER

Place of performance

Place of performance
Danville, Danville (City), Virginia 24540-5397 United States Of America
Congressional district (place of performance)
VA-05As reported at the time of the action

Classification and competition

Classification

Competition

Extent competed
Full and open competition after exclusion of sourcesD
Solicitation procedures
Negotiated proposal/quoteNP
Set-aside
Small business set aside - totalSBA
Contract pricing
Firm fixed priceJ
Offers received
500

Solicitation and notices

Solicitation ID
NNX15SBIRI(as reported)

Contract details

Subcontracting plan
Plan not requiredB
Major program
Metamaterials-inspired aerospace structures (MIAS)
Service Contract Act labor standards
No
Government-furnished property
Transaction does not use GFE/GFPN
Bundled requirement
Not a bundled requirementD
Consolidated requirement
No
Undefinitized action (terms not final)
No
Performance-based service acquisition
No - service where PBA is not used.N

Linked notices

Notice
Notice ID
Type
Link
Posted

Transaction history

Modification history

Base award
Jun 10, 2015Base obligation at award: $124,825
Latest action
Jun 10, 2015 — Base awardModification 0; obligation change +$124,825
Actions by type
  • Base award1
1 actions recorded, Jun 10, 2015 to Jun 10, 2015; each action counted once.

Similar awards

PIID
Match
Awardee

All contract data

All contract data

Every other field reported for this award, as of its latest reported action

Competition

Evaluation preference
No preference used
Simplified procedures for commercial items
No

Pricing and financing

Paid by purchase card
No
Latest action: change in base and exercised options
$124,825
Latest action: change in base and all options
$124,825

Socio-economic and policy

Recovered materials and sustainability
No clauses included and no sustainability includedC
EPA-designated product
Not requiredE
Research program (SBIR/STTR)
Small business innovation research program phase i actionSR1
Walsh-Healey Act (materials and supplies)
No
Construction wage rates (Davis-Bacon)
No

Place and origin

Domestic or foreign entity
U.S. owned businessA
Place of manufacture
Not a manufactured end productC

Structure

Award or IDV
Award
Award type
PoB
Awarding agency code
8000
Awarding sub-tier code
8000
Contracting office code
NSSC0
Transactions recorded under this award key
1

Funding

Funding agency code
8000
Funding sub-tier code
8000
Funding office code
NSSC0