Po NNX15CC41PCONCEPTS TO SYSTEMS INC.
Overview
Award facts
- Period of performance
- Jun 17, 2015 to Dec 17, 2015
- Ended
- Modifications
- 0
- Latest action Jun 10, 2015
- Contract type
- Po
- PIID NNX15CC41P
Description of requirement
IGF::OT::IGF THE VIBROACOUSTIC CHARACTERISTICS OF STRUCTURES ARE VITAL IN DETERMINING THE OPERATIONAL ENVELOPE AND MISSION FEASIBILITIES. THE SOURCES OF VIBROACOUSTIC EXCITATION ARE MAINLY DUE TO NOISE GENERATED BY THE LAUNCHER DURING IGNITION, LIFT-OFF, AND ATMOSPHERIC FLIGHT. TYPICALLY, FOAM OR FIBERGLASS CLADDINGS AND CORES OR ACOUSTIC LINERS WHICH INCORPORATE RESONATING CHAMBERS ARE USED TO PREVENT THE TRANSMISSION OF SOUND THROUGH SUCH STRUCTURAL LOCATIONS. HOWEVER, THIS APPROACH IS FOUND TO BE INEFFECTIVE FOR VIBROACOUSTIC SOURCES WITH DOMINANT FREQUENCY CONTENT BELOW 400 HZ. IT IS PROPOSED TO DEVELOP A METAMATERIAL-INSPIRED COMPOSITE STRUCTURE INCORPORATING LOW-FREQUENCY VIBRO-IMPACT RESONATING ELEMENTS COUPLED WITH CONVENTIONAL HIGH-FREQUENCY ACOUSTIC ABSORBERS. THE IDEA IS TO EMPLOY STRUCTURALLY-INTEGRAL TUNED RESONATORS TO PICK UP ENERGY FROM INCIDENT LOW-FREQUENCY SOUND WAVES AND UTILIZING THE MECHANISM OF FREQUENCY UP-CONVERSION VIA IMPACTS, TRANSFER THE ENERGY TO HIGHER MODES IN THE SANDWICH PRIMARY STRUCTURE FOR SUBSEQUENT DISSIPATION WITH CONVENTIONAL ACOUSTIC ABSORBERS. THE ADVANTAGE OF THE PROPOSED STRUCTURE WOULD BE IN REDUCING THE TRANSMITTED PRESSURE OF LOW FREQUENCY WAVES, FOR WHICH CONVENTIONAL METHODS ARE INEFFECTIVE. OUR INITIAL BOUND FOR THE ATTACHMENT MASS IS WITHIN 5 TO 10% OF THE BASELINE STRUCTURE TO SHOW SIGNIFICANT PEAK PRESSURE REDUCTION FOR LF WAVES. THE STATE-OF-THE-ART CONVENTIONAL ABSORBERS PROVIDE ABOUT 10-20% SOUND TRANSMISSION LOSS (STL) IN THE 100-150 HZ RANGE. OUR PERFORMANCE OBJECTIVE IS TO ACHIEVE STL OF ABOUT 50-60% IN FREQUENCY RANGE BELOW 400 HZ WITH 5-10% MASS INCREASE WITHOUT DETERIORATING STIFFNESS RESPONSE OF THE STRUCTURE. SUCCESSFUL COMPLETION OF PHASE I WORK WILL RESULT IN A "PROOF-OF-CONCEPT" MIAS UNIT CELL. IN PHASE II, DETAILED DESIGN AND FABRICATION OF THE MIAS PROTOTYPE PANEL WILL BE COMPLETED.
Dates and value
- Award date
- Signed on Jun 10, 2015
- Potential end of performance
- Dec 16, 2015
Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Jun 10, 2015. View on USAspending · Recipient on SAM.gov
Recipient
Business types and certifications
As represented in SAM.gov at the time of the action.
Subcontracting network
The prime, the subcontractors on this award, and their own subcontractors.
Agency and place
Awarding and funding
- Awarded by
- National Aeronautics and Space Administration
- NASA SHARED SERVICES CENTER
- Funded by
- National Aeronautics and Space Administration
- NASA SHARED SERVICES CENTER
Place of performance
- Place of performance
- Danville, Danville (City), Virginia 24540-5397 United States Of America
- Congressional district (place of performance)
- VA-05As reported at the time of the action
Classification and competition
Classification
- Product or service (PSC)
- AR11R&D- SPACE: AERONAUTICS/SPACE TECHNOLOGY (BASIC RESEARCH) (research and development)
Competition
- Extent competed
- Full and open competition after exclusion of sourcesD
- Solicitation procedures
- Negotiated proposal/quoteNP
- Set-aside
- Small business set aside - totalSBA
- Contract pricing
- Firm fixed priceJ
- Offers received
- 500
Solicitation and notices
- Solicitation ID
- NNX15SBIRI(as reported)
Contract details
- Subcontracting plan
- Plan not requiredB
- Major program
- Metamaterials-inspired aerospace structures (MIAS)
- Service Contract Act labor standards
- No
- Government-furnished property
- Transaction does not use GFE/GFPN
- Bundled requirement
- Not a bundled requirementD
- Consolidated requirement
- No
- Undefinitized action (terms not final)
- No
- Performance-based service acquisition
- No - service where PBA is not used.N
Linked notices
Notice | Notice ID | Type | Link | Posted |
|---|---|---|---|---|
Transaction history
Modification history
- Base award
- Jun 10, 2015Base obligation at award: $124,825
- Latest action
- Jun 10, 2015 — Base awardModification 0; obligation change +$124,825
- Actions by type
- Base award1
Similar awards
PIID | Match | Awardee |
|---|---|---|
All contract data
All contract data
Every other field reported for this award, as of its latest reported action
Competition
- Evaluation preference
- No preference used
- Simplified procedures for commercial items
- No
Pricing and financing
- Paid by purchase card
- No
- Latest action: change in base and exercised options
- $124,825
- Latest action: change in base and all options
- $124,825
Socio-economic and policy
- Recovered materials and sustainability
- No clauses included and no sustainability includedC
- EPA-designated product
- Not requiredE
- Research program (SBIR/STTR)
- Small business innovation research program phase i actionSR1
- Walsh-Healey Act (materials and supplies)
- No
- Construction wage rates (Davis-Bacon)
- No
Place and origin
- Domestic or foreign entity
- U.S. owned businessA
- Place of manufacture
- Not a manufactured end productC
Structure
- Award or IDV
- Award
- Award type
- PoB
- Awarding agency code
- 8000
- Awarding sub-tier code
- 8000
- Contracting office code
- NSSC0
- Transactions recorded under this award key
- 1
Funding
- Funding agency code
- 8000
- Funding sub-tier code
- 8000
- Funding office code
- NSSC0