GovChime
AWARDPOSmall business

Po NNX15CM47PKBN OPTICS LLC

Overview

Award facts

Period of performance
Jun 17, 2015 to Dec 17, 2015
Ended
Modifications
0
Latest action Jun 2, 2015
Contract type
Po
PIID NNX15CM47P

Description of requirement

IGF::OT::IGF WE PROPOSOE A RESEARCH PROGRAM AIMED AT DEVELOPING SPECTRAL INTERFEROMETERS WITH DRAMATICALLY ENHANCED PERFORMANCE. A KEY ASPECT OF OUR APPROACH IS TO PLACE A HIGHLY DISPERSIVE (SLOW-LIGHT) MATERIAL INTO ONE ARM OF A TWO-PATH, MACH ZEHNDER INTERFEROMETER (MZI). THEORETICAL ANALYSIS SHOWS THAT THE SPECTRAL RESOLUTION UNDER THESE CIRCUMSTANCES CAN BE ENHANCED BY A FACTOR AS LARGE AS THE GROUP INDEX OF THE SLOW-LIGHT MATERIAL BEING USED. SLOW-LIGHT INTERFEROMETERS CAN PRODUCE DRAMATIC INCREASES IN THE RESOLUTION OR A SPECTROMETER OR THEY CAN PERMIT MUCH SMALLER PHYSICAL DIMENSIONS THAN STANDARD SPECTROMETERS WITHOUT ANY DEGRADATION OF RESOLUTION. IN THE PRESENT PROGRAM, WE WILL UNDERTAKE TO DEVELOP SPECTROMETERS THAT CAN BE EMPLOYED UNDER PRACTICAL CONDITIONS AND ESPECIALLY THOSE OF INTEREST TO NASA. WE PROPOSE THREE RELATED APPROACHES TO THE DESIGN OF ENHANCED SPECTROMETERS AND WILL PERFORM CONCEPTUAL TO QUANTIFY THE RELATIVE MERITS OF THESE APPROACHES. THIS WILL ALLOW FUTURE WORK TO FURTHER DEVELOP THE MOST PROMISING DESIGN(S). THE THREE APPROACHES: 1.) A HYBRID INTERFEROMETER: A FABRY-PEROT (FP) INTERFEROMETER WILL BE PLACED WITHIN A MZ INTERFEROMETER. THE TRANSFER CHARACTERISTICS OF THE FP MIMIC THOSE OF A SLOW-LIGHT MATERIAL. THIS DESIGN CAN ACHIEVE THE SAME SORT OF ENHANCEMENT OF SENSITIVITY AS THAT OF A TRUE SLOW-LIGHT MEDIUM PLACED INSIDE THE MZI. 2.) OUR SECOND APPROACH MAKES USE OF A SIMILAR ANALOGY, BUT ON A MUCH SMALLER DISTANCE SCALE. THIS APPROACH ENTAILS THE FABRICATION OF WAVELENGTH-SCALE DEFECT RESONATORS IN AN OTHERWISE PERFECT PHOTONIC CRYSTAL (PHC). THE DESIGN EMPLOYS A SEQUENCE OF SUCH RESONATORS EACH WITH A SLIGHTLY DIFFERENT RESONANCE WAVELENGTH. 3.) OUR THIRD APPROACH IS TO FABRICATE MM-SCALE INTERFEROMETERS USING NANO FABRICATION ON SILICON. THE SLOW LIGHT MEDIUM IS A PHC WAVEGUIDE FORMED BY A LINE DEFECT IN A SILICON PHC STRUCTURE. WE WILL COUPLE THESE STRUCTURES TO WAVEGUIDES IN AN INTERFEROMETER CONFIGURATION.

Dates and value

Award date
Signed on Jun 2, 2015
Potential end of performance
Dec 16, 2015

Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Jun 2, 2015. View on USAspending · Recipient on SAM.gov

Recipient

LocationPITTSFORD, NY
UEIG9WFM313LG65
Business sizeSmall businessSize at award, per the contracting officer
Parent companyKBN OPTICS LLC

Business types and certifications

For-profit organizationLimited liability companyPartnership or LLP

As represented in SAM.gov at the time of the action.

Subcontracting network

The prime, the subcontractors on this award, and their own subcontractors.

Subaward amounts are self-reported by prime contractors to SAM.gov and appear 1 to 2 months after the work. Duplicates are removed on a best-effort basis. Totals are incomplete and not an audit. Source: USAspending.

Agency and place

Awarding and funding

Awarded by
  1. National Aeronautics and Space Administration
  2. NASA SHARED SERVICES CENTER
Funded by
  1. National Aeronautics and Space Administration
  2. NASA SHARED SERVICES CENTER

Place of performance

Place of performance
Pittsford, Monroe County, New York 14534-9529 United States Of America
Congressional district (place of performance)
NY-25As reported at the time of the action

Classification and competition

Classification

Competition

Extent competed
Full and open competition after exclusion of sourcesD
Solicitation procedures
Negotiated proposal/quoteNP
Set-aside
Small business set aside - totalSBA
Contract pricing
Firm fixed priceJ
Offers received
500

Solicitation and notices

Solicitation ID
NNX15SBIRI(as reported)

Contract details

Subcontracting plan
Plan not requiredB
Major program
Slow-light-enhanced spectral interferometers
Service Contract Act labor standards
No
Government-furnished property
Transaction does not use GFE/GFPN
Bundled requirement
Not a bundled requirementD
Consolidated requirement
No
Undefinitized action (terms not final)
No
Performance-based service acquisition
No - service where PBA is not used.N

Linked notices

Notice
Notice ID
Type
Link
Posted

Transaction history

Modification history

Base award
Jun 2, 2015Base obligation at award: $98,819
Latest action
Jun 2, 2015 — Base awardModification 0; obligation change +$98,819
Actions by type
  • Base award1
1 actions recorded, Jun 2, 2015 to Jun 2, 2015; each action counted once.

Similar awards

PIID
Match
Awardee

All contract data

All contract data

Every other field reported for this award, as of its latest reported action

Competition

Evaluation preference
No preference used
Simplified procedures for commercial items
No

Pricing and financing

Paid by purchase card
No
Latest action: change in base and exercised options
$98,819
Latest action: change in base and all options
$98,819

Socio-economic and policy

Recovered materials and sustainability
No clauses included and no sustainability includedC
EPA-designated product
Not requiredE
Research program (SBIR/STTR)
Small business innovation research program phase i actionSR1
Walsh-Healey Act (materials and supplies)
No
Construction wage rates (Davis-Bacon)
No

Place and origin

Domestic or foreign entity
U.S. owned businessA
Place of manufacture
Not a manufactured end productC

Structure

Award or IDV
Award
Award type
PoB
Awarding agency code
8000
Awarding sub-tier code
8000
Contracting office code
NSSC0
Transactions recorded under this award key
1

Funding

Funding agency code
8000
Funding sub-tier code
8000
Funding office code
NSSC0