Purchase order NNX15CM65PMOUND LASER & PHOTONICS CENTER, INC.
Overview
Award facts
- Period of performance
- Mar 11, 2016 to Jun 17, 2016
- Ended
- Modifications
- 2
- Latest action Mar 11, 2016
- Contract type
- Purchase order
- PIID NNX15CM65P
Description of requirement
IGF::OT::IGF THIS STTR PROJECT SEEKS TO DEVELOP A FAST PREDICTIVE MODEL FOR SELECTIVE LASER MELTING (SLM) PROCESSES AND THEN INTEGRATE THAT MODEL WITH AN SLM CHAMBER THAT ALLOWS FULL CONTROL OF PROCESS VARIABLES AND IS EQUIPPED WITH IN-PROCESS SENSORS. THE COMBINATION WILL CREATE A CLOSED LOOP IN WHICH THE MODEL SUGGESTS PROCESS PARAMETER SETTINGS FOR TEST BUILDS AND THE SENSORS PROVIDE FEEDBACK TO THE MODEL. THIS CREATES A POWERFUL TOOL FOR ITERATIVE PROCESS DEVELOPMENT FAR FASTER THAN IS CURRENTLY POSSIBLE BY STANDARD SIMULATION METHODS AND ACCESSIBLE TO A WIDE RANGE OF POTENTIAL SLM INNOVATORS WHO ARE NOT SIMULATION SPECIALISTS. THE KEY INNOVATION WILL BE THE DEVELOPMENT OF A SIMPLE SET OF EMPIRICAL EQUATIONS THAT RELATE SLM PROCESS INPUTS TO ACTUAL BUILD RESULTS. THIS IS ACCOMPLISHED BY A COMBINATION OF FINITE ELEMENT SIMULATIONS AND VERIFICATION EXPERIMENTS WHOSE PROCESS PARAMETERS ARE SELECTED BY A DESIGN-OF-EXPERIMENTS METHODOLOGY. THE RESULTING EASILY CALCULABLE EMPIRICAL FUNCTIONS (A.K.A. THE FAST PREDICTIVE MODEL) WILL REPLACE ARDUOUS SIMULATION AND UNDIRECTED TRIAL-AND-ERROR AS METHODS OF SLM PROCESS DEVELOPMENT. A USER-FRIENDLY INTERFACE WILL BE WRITTEN THAT LINKS THE FAST PREDICTIVE MODEL TO SENSORIZED SLM CHAMBER TO ALLOW EASY, RAPID AND FLEXIBLE SLM PROCESS DEVELOPMENT. THE SIMPLICITY OF THE SYSTEM, AND RELATIVELY LOW COST OF THE SLM CHAMBER WILL ALLOW LARGE NUMBERS OF NEW INNOVATORS AND INDUSTRIES TO ENTER THE FIELD OF SLM AND DEVELOP NOVEL PROCESSES THAT MEET THEIR APPLICATION NEEDS, AS WELL AS HELP SOLVE SPECIFIC PROBLEMS OF NASA INTEREST. PHASE I ACTIVITIES INCLUDE 1) DEVELOPMENT OF THE FAST PREDICTIVE MODEL, 2) DEVELOPMENT OF A CONTROL ALGORITHM AND USER INTERFACE LINKING THE MODEL TO THE SLM CHAMBER, AND 3) DEMONSTRATION OF THE INTEGRATED SYSTEM FOR RAPID DEVELOPMENT OF NOVEL SLM PROCESSES.
Dates and value
- Award date
- Signed on Jun 4, 2015
- Potential end of performance
- Jun 16, 2016
Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Mar 11, 2016. View on USAspending · Recipient on SAM.gov
Recipient
Business types and certifications
As represented in SAM.gov at the time of the action.
Subcontracting network
The prime, the subcontractors on this award, and their own subcontractors.
Agency and place
Awarding and funding
- Awarded by
- National Aeronautics and Space Administration
- NASA SHARED SERVICES CENTER
- Funded by
- National Aeronautics and Space Administration
- NASA SHARED SERVICES CENTER
Place of performance
- Place of performance
- Dayton, Montgomery County, Ohio 45420-1172
- Congressional district (place of performance)
- OH-10As reported at the time of the action
Classification and competition
Classification
- Product or service (PSC)
- AR11R&D- SPACE: AERONAUTICS/SPACE TECHNOLOGY (BASIC RESEARCH) (research and development)
Competition
- Extent competed
- Full and open competition after exclusion of sourcesD
- Solicitation procedures
- Negotiated proposal/quoteNP
- Set-aside
- Small business set aside - totalSBA
- Contract pricing
- Firm fixed priceJ
- Offers received
- 500
Solicitation and notices
- Solicitation ID
- NNX15STTRI(as reported)
Contract details
- Subcontracting plan
- Plan not requiredB
- Major program
- Integration of fast predictive model and slm process development chamber
- Service Contract Act labor standards
- No
- Commercial procedures
- Commercial item procedures not usedD
- Government-furnished property
- Transaction does not use GFE/GFPN
- Bundled requirement
- Not a bundled requirementD
- Consolidated requirement
- No
- Undefinitized action (terms not final)
- No
- Performance-based service acquisition
- No - service where PBA is not used.N
Linked notices
Notice | Notice ID | Type | Link | Posted |
|---|---|---|---|---|
Transaction history
Modification history
- Base award
- Jun 4, 2015Base obligation at award: $129,975
- Latest action
- Mar 11, 2016 — Other administrative actionModification 2; administrative: no change in scope or value
- Actions by type
- Base award1
- Other administrative action2
Similar awards
PIID | Match | Awardee |
|---|---|---|
All contract data
All contract data
Every other field reported for this award, as of its latest reported action
Competition
- Evaluation preference
- No preference used
- Local area set-aside
- No
- Simplified procedures for commercial items
- No
- A-76 (FAIR Act) action
- No
Pricing and financing
- Paid by purchase card
- No
Socio-economic and policy
- Recovered materials and sustainability
- No clauses included and no sustainability includedC
- EPA-designated product
- Not requiredE
- Clinger-Cohen Act planning (IT)
- No
- Research program (SBIR/STTR)
- Small technology transfer research program phase iST1
- Walsh-Healey Act (materials and supplies)
- No
- Construction wage rates (Davis-Bacon)
- No
Place and origin
- Domestic or foreign entity
- U.S. owned businessA
- Country of product or service origin
- United statesUSA
- Place of manufacture
- Not a manufactured end productC
Structure
- Award or IDV
- Award
- Award type
- Purchase orderB
- Awarding agency code
- 8000
- Awarding sub-tier code
- 8000
- Contracting office code
- NSSC0
- Transactions recorded under this award key
- 3
Funding
- Funding agency code
- 8000
- Funding sub-tier code
- 8000
- Funding office code
- NSSC0