Purchase order NNX16CC35PSILICON TECHNOLOGIES INC
Overview
Award facts
- Period of performance
- Sep 14, 2016 to Dec 9, 2016
- Ended
- Modifications
- 1
- Latest action Sep 14, 2016
- Contract type
- Purchase order
- PIID NNX16CC35P
Description of requirement
IGF::OT::IGF A ROBUST AND RELIABLE WIRELESS COMMUNICATION SYSTEM CAPABLE OF SURVIVING THE HARSHNESS AND RADIATION OF SPACE IS REQUIRED FOR FUTURE SPACE MISSIONS. CURRENT EVA (EXTRA VEHICULAR ACTIVITY) COMMUNICATIONS SYSTEMS ARE OUT DATED AND IN NEED OF AN OVERHAUL. SILICON TECHNOLOGIES INC. (STI) PROPOSES TO DESIGN A WIRELESS COMMUNICATION ASIC THAT WILL INCLUDE AUDIO DACS, ADCS, AND A DUAL-BAND WLAN AS WELL AS SPEAKER DRIVERS FOR A COMPLETE COMMUNICATION SOLUTION. TO MINIMIZE DESIGN AND LAYOUT TIME, STI SHALL USE ITS ADONIS RAD HARD BY DESIGN ANALOG CELL LIBRARY (RADL). RADL CONTAINS THE BASIC COMPONENTS REQUIRED FOR THE DESIGN OF THE ASIC INCLUDING RADIATION HARDENED BY DESIGN OPERATIONAL AMPLIFIERS, VOLTAGE REFERENCES, ANALOG TRANSISTORS, RESISTORS AND CAPACITORS. STI HAS DEVELOPED A REVOLUTIONARY NEW DESIGN TOOL, ADONIS, WHICH WILL BE USED FOR THIS ASIC DESIGN. ONE OF THE KEY BENEFITS OF USING STI'S ADONIS TECHNOLOGY IS THAT IT PROVIDES NASA RAD HARD TECHNOLOGY THAT IS PORTABLE TO NEW PROCESSES AND WILL EXTEND THE POTENTIAL LIFE OF THE PROGRAM BY ENSURING THAT THE DESIGN CAN BE MANUFACTURED IN A NEW FAB IF THE EXISTING FAB CLOSES. ADDITIONALLY, ADONIS CAN DO THIS AT A LOWER COST WITH REDUCED RISK COMPARED TO EXISTING DESIGN TECHNOLOGIES. IN PHASE II, STI SHALL TAKE THE FEASIBILITY DESIGN IN PHASE I, BUILD A PROTOTYPE ASIC, AND TEST THE SILICON ELECTRICALLY BEFORE AND AFTER RADIATION EXPOSURE. OTHER ADVANTAGES OF THE PATENTED ADONIS DESIGN TECHNOLOGY ARE: (1)CONSISTENT CELL STRUCTURES WITH RAD HARD DESIGN, (2)REDUCED MASK COSTS BY 80% USING CONVENTIONAL TECHNIQUES, (3)REPEATABLE STRUCTURES WHICH CONTROL LEAKAGE, (4)INTERACTIONS BETWEEN CELLS ARE KNOWN AT DESIGN TIME, (5)FASTER DESIGN CYCLE RESULTING IN A SAVINGS OF MORE THAN 2X STANDARD DESIGN TIME, (6)PORTABILITY BETWEEN DIFFERENT CMOS PROCESSES (7)NOISE AND IR REDUCTION DUE TO A PROPRIETARY POWER AND GROUND MESH, (8)1D APPROACH, AND (9)COMPATIBLE WITH FUTURE EBEAM DIRECT WRITE TECHNOLOGY WHEN IT IS COMMERCIALIZED.
Dates and value
- Award date
- Signed on Jun 9, 2016
- Potential end of performance
- Dec 8, 2016
Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Sep 14, 2016. View on USAspending · Recipient on SAM.gov
Recipient
Business types and certifications
As represented in SAM.gov at the time of the action.
Subcontracting network
The prime, the subcontractors on this award, and their own subcontractors.
Agency and place
Awarding and funding
- Awarded by
- National Aeronautics and Space Administration
- NASA SHARED SERVICES CENTER
- Funded by
- National Aeronautics and Space Administration
- NASA SHARED SERVICES CENTER
Place of performance
- Place of performance
- Salt Lake City, Salt Lake County, Utah 84117-4233
- Congressional district (place of performance)
- UT-03As reported at the time of the action
Classification and competition
Classification
- Product or service (PSC)
- AR11R&D- SPACE: AERONAUTICS/SPACE TECHNOLOGY (BASIC RESEARCH) (research and development)
Competition
- Extent competed
- Full and open competition after exclusion of sourcesD
- Solicitation procedures
- Negotiated proposal/quoteNP
- Set-aside
- Small business set aside - totalSBA
- Contract pricing
- Firm fixed priceJ
- Offers received
- 500
Solicitation and notices
- Solicitation ID
- NNX16SBIRPH1(as reported)
Contract details
- Subcontracting plan
- Plan not requiredB
- Major program
- Speaker driver and wireless transciever asic
- Service Contract Act labor standards
- No
- Commercial procedures
- Commercial item procedures not usedD
- Government-furnished property
- Transaction does not use GFE/GFPN
- Bundled requirement
- Not a bundled requirementD
- Consolidated requirement
- No
- Undefinitized action (terms not final)
- No
- Performance-based service acquisition
- No - service where PBA is not used.N
Linked notices
Notice | Notice ID | Type | Link | Posted |
|---|---|---|---|---|
Transaction history
Modification history
- Base award
- Jun 9, 2016Base obligation at award: $124,888
- Latest action
- Sep 14, 2016 — Other administrative actionModification 1; administrative: no change in scope or value
- Actions by type
- Base award1
- Other administrative action1
Similar awards
PIID | Match | Awardee |
|---|---|---|
All contract data
All contract data
Every other field reported for this award, as of its latest reported action
Competition
- Evaluation preference
- No preference used
- Local area set-aside
- No
- Simplified procedures for commercial items
- No
- A-76 (FAIR Act) action
- No
Pricing and financing
- Paid by purchase card
- No
Socio-economic and policy
- Recovered materials and sustainability
- No clauses included and no sustainability includedC
- EPA-designated product
- Not requiredE
- Clinger-Cohen Act planning (IT)
- No
- Research program (SBIR/STTR)
- Small business innovation research program phase i actionSR1
- Walsh-Healey Act (materials and supplies)
- No
- Construction wage rates (Davis-Bacon)
- No
Place and origin
- Domestic or foreign entity
- U.S. owned businessA
- Country of product or service origin
- United statesUSA
- Place of manufacture
- Not a manufactured end productC
Structure
- Award or IDV
- Award
- Award type
- Purchase orderB
- Awarding agency code
- 8000
- Awarding sub-tier code
- 8000
- Contracting office code
- 80NSSC
- Transactions recorded under this award key
- 2
Funding
- Funding agency code
- 8000
- Funding sub-tier code
- 8000
- Funding office code
- 80NSSC