Purchase order NNX16CG37PNANORAMIC, INC.
Overview
Award facts
- Period of performance
- Jun 10, 2016 to Dec 9, 2016
- Ended
- Modifications
- 0
- Latest action Jun 3, 2016
- Contract type
- Purchase order
- PIID NNX16CG37P
Description of requirement
IGF::OT::IGF FASTCAP PROPOSES TO DEVELOP AN ULTRA-HIGH POWER DENSITY AND HIGH FREQUENCY ULTRACAPACITOR CAPABLE OF SURVIVING OVER THE WIDE TEMPERATURE RANGE OF -60C TO 130C AND EXHIBITING PEAK GRAVIMETRIC AND VOLUMETRIC POWER DENSITY OF 120KW/KG AND 150KW/L RESPECTIVELY. FASTCAP IS PLANNING TO DESIGN AND PROTOTYPE A HYBRID SYSTEM COMPRISED OF THE PROPOSED ULTRACAPACITOR IN PARALLEL WITH A HIGH ENERGY DENSITY, RECHARGEABLE, LITHIUM ION BATTERY SHOWING AT LEAST 50% VOLUME REDUCTION AND 100% LIFETIME INCREASE COMPARED TO STAND-ALONE LITHIUM BATTERIES, MEETING LONG DURATION RESEARCH BALLOON REQUIREMENTS. DURING PHASE I, FASTCAP WILL EVALUATE BOTH NOVEL UNDER-DEVELOPMENT AND OFF-THE-SHELF LITHIUM CHEMISTRIES UTILIZED IN AEROSPACE APPLICATIONS. THE RESULTING HYBRID BATTERY-ULTRACAPACITOR (HBU) SYSTEM COMBINES THE BENEFITS OF BOTH TECHNOLOGIES AND WILL MEET NASA'S SCIENTIFIC BALLOON REQUIREMENTS OF ENERGY DENSITY, POWER DENSITY, SHELF LIFE, TEMPERATURE, RELIABILITY AND CYCLE LIFE. THIS ULTRACAPACITOR CAN ALSO BE COUPLED TO A PIEZOELECTRIC GENERATOR, THANKS TO A HIGH CUT OFF FREQUENCY GREATER THAN 500HZ. THE PROPOSED HBU SYSTEM WILL ENABLE SIGNIFICANT IMPROVEMENTS IN THE DESIGN OF POWER STORAGE FOR TERRESTRIAL AND PLANETARY BALLOONS, REDUCING THEIR WEIGHT, VOLUME, AND COMPLEXITY, WHILE IMPROVING PERFORMANCE AND RELAXING DESIGN CONSTRAINTS ON SCARCE CANDIDATE BATTERY TECHNOLOGIES. COMPARED TO TODAY'S HIGH-RATE RESERVE AND RECHARGEABLE BATTERY TECHNOLOGIES, THE PROPOSED HYBRID SYSTEM WILL PROVIDE MUCH HIGHER POWER AND HIGHER ENERGY DENSITY, SHOW TREMENDOUS IMPROVEMENT IN CYCLE LIFETIME, AND SHOW REDUCED RISK OF EXPLOSION AND THERMAL RUNAWAY ASSOCIATED WITH HIGH-RATE DISCHARGE, THANKS TO THE POWER BUFFERING ROLE OF THE ULTRACAPACITOR WITHIN THE HBU SYSTEM. IN APPLICATIONS WHERE BATTERIES ARE CURRENTLY OVERSIZED FOR POWER HANDLING, DRAMATIC REDUCTIONS IN TOTAL ENERGY STORAGE SYSTEM WEIGHT WILL BE ACHIEVED BY COMPLEMENTING THOSE BATTERIES WITH ULTRACAPACITORS.
Dates and value
- Award date
- Signed on Jun 3, 2016
- Potential end of performance
- Dec 8, 2016
Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Jun 3, 2016. View on USAspending · Recipient on SAM.gov
Recipient
Business types and certifications
As represented in SAM.gov at the time of the action.
Subcontracting network
The prime, the subcontractors on this award, and their own subcontractors.
Agency and place
Awarding and funding
- Awarded by
- National Aeronautics and Space Administration
- NASA SHARED SERVICES CENTER
- Funded by
- National Aeronautics and Space Administration
- NASA SHARED SERVICES CENTER
Place of performance
- Place of performance
- Boston, Suffolk County, Massachusetts 02210-2384
- Congressional district (place of performance)
- MA-08As reported at the time of the action
Classification and competition
Classification
- Product or service (PSC)
- AR11R&D- SPACE: AERONAUTICS/SPACE TECHNOLOGY (BASIC RESEARCH) (research and development)
Competition
- Extent competed
- Full and open competition after exclusion of sourcesD
- Solicitation procedures
- Negotiated proposal/quoteNP
- Set-aside
- Small business set aside - totalSBA
- Contract pricing
- Firm fixed priceJ
- Offers received
- 500
Solicitation and notices
- Solicitation ID
- NNX16SBIRPH1(as reported)
Contract details
- Subcontracting plan
- Plan not requiredB
- Major program
- High efficiency hybrid energy storage utilizing high power density
- Service Contract Act labor standards
- No
- Commercial procedures
- Commercial item procedures not usedD
- Government-furnished property
- Transaction does not use GFE/GFPN
- Bundled requirement
- Not a bundled requirementD
- Consolidated requirement
- No
- Undefinitized action (terms not final)
- No
- Performance-based service acquisition
- No - service where PBA is not used.N
Linked notices
Notice | Notice ID | Type | Link | Posted |
|---|---|---|---|---|
Transaction history
Modification history
- Base award
- Jun 3, 2016Base obligation at award: $124,623
- Latest action
- Jun 3, 2016 — Base awardModification 0; obligation change +$124,623
- Actions by type
- Base award1
Similar awards
PIID | Match | Awardee |
|---|---|---|
All contract data
All contract data
Every other field reported for this award, as of its latest reported action
Competition
- Evaluation preference
- No preference used
- Local area set-aside
- No
- Simplified procedures for commercial items
- No
- A-76 (FAIR Act) action
- No
Pricing and financing
- Paid by purchase card
- No
- Latest action: change in base and exercised options
- $124,623
- Latest action: change in base and all options
- $124,623
Socio-economic and policy
- Recovered materials and sustainability
- No clauses included and no sustainability includedC
- EPA-designated product
- Not requiredE
- Clinger-Cohen Act planning (IT)
- No
- Research program (SBIR/STTR)
- Small business innovation research program phase i actionSR1
- Walsh-Healey Act (materials and supplies)
- No
- Construction wage rates (Davis-Bacon)
- No
Place and origin
- Domestic or foreign entity
- U.S. owned businessA
- Country of product or service origin
- United statesUSA
- Place of manufacture
- Not a manufactured end productC
Structure
- Award or IDV
- Award
- Award type
- Purchase orderB
- Awarding agency code
- 8000
- Awarding sub-tier code
- 8000
- Contracting office code
- 80NSSC
- Transactions recorded under this award key
- 1
Funding
- Funding agency code
- 8000
- Funding sub-tier code
- 8000
- Funding office code
- 80NSSC