GovChime
AWARDPURCHASE ORDERSmall business

Purchase order NNX16CG37PNANORAMIC, INC.

Overview

Award facts

Period of performance
Jun 10, 2016 to Dec 9, 2016
Ended
Modifications
0
Latest action Jun 3, 2016
Contract type
Purchase order
PIID NNX16CG37P

Description of requirement

IGF::OT::IGF FASTCAP PROPOSES TO DEVELOP AN ULTRA-HIGH POWER DENSITY AND HIGH FREQUENCY ULTRACAPACITOR CAPABLE OF SURVIVING OVER THE WIDE TEMPERATURE RANGE OF -60C TO 130C AND EXHIBITING PEAK GRAVIMETRIC AND VOLUMETRIC POWER DENSITY OF 120KW/KG AND 150KW/L RESPECTIVELY. FASTCAP IS PLANNING TO DESIGN AND PROTOTYPE A HYBRID SYSTEM COMPRISED OF THE PROPOSED ULTRACAPACITOR IN PARALLEL WITH A HIGH ENERGY DENSITY, RECHARGEABLE, LITHIUM ION BATTERY SHOWING AT LEAST 50% VOLUME REDUCTION AND 100% LIFETIME INCREASE COMPARED TO STAND-ALONE LITHIUM BATTERIES, MEETING LONG DURATION RESEARCH BALLOON REQUIREMENTS. DURING PHASE I, FASTCAP WILL EVALUATE BOTH NOVEL UNDER-DEVELOPMENT AND OFF-THE-SHELF LITHIUM CHEMISTRIES UTILIZED IN AEROSPACE APPLICATIONS. THE RESULTING HYBRID BATTERY-ULTRACAPACITOR (HBU) SYSTEM COMBINES THE BENEFITS OF BOTH TECHNOLOGIES AND WILL MEET NASA'S SCIENTIFIC BALLOON REQUIREMENTS OF ENERGY DENSITY, POWER DENSITY, SHELF LIFE, TEMPERATURE, RELIABILITY AND CYCLE LIFE. THIS ULTRACAPACITOR CAN ALSO BE COUPLED TO A PIEZOELECTRIC GENERATOR, THANKS TO A HIGH CUT OFF FREQUENCY GREATER THAN 500HZ. THE PROPOSED HBU SYSTEM WILL ENABLE SIGNIFICANT IMPROVEMENTS IN THE DESIGN OF POWER STORAGE FOR TERRESTRIAL AND PLANETARY BALLOONS, REDUCING THEIR WEIGHT, VOLUME, AND COMPLEXITY, WHILE IMPROVING PERFORMANCE AND RELAXING DESIGN CONSTRAINTS ON SCARCE CANDIDATE BATTERY TECHNOLOGIES. COMPARED TO TODAY'S HIGH-RATE RESERVE AND RECHARGEABLE BATTERY TECHNOLOGIES, THE PROPOSED HYBRID SYSTEM WILL PROVIDE MUCH HIGHER POWER AND HIGHER ENERGY DENSITY, SHOW TREMENDOUS IMPROVEMENT IN CYCLE LIFETIME, AND SHOW REDUCED RISK OF EXPLOSION AND THERMAL RUNAWAY ASSOCIATED WITH HIGH-RATE DISCHARGE, THANKS TO THE POWER BUFFERING ROLE OF THE ULTRACAPACITOR WITHIN THE HBU SYSTEM. IN APPLICATIONS WHERE BATTERIES ARE CURRENTLY OVERSIZED FOR POWER HANDLING, DRAMATIC REDUCTIONS IN TOTAL ENERGY STORAGE SYSTEM WEIGHT WILL BE ACHIEVED BY COMPLEMENTING THOSE BATTERIES WITH ULTRACAPACITORS.

Dates and value

Award date
Signed on Jun 3, 2016
Potential end of performance
Dec 8, 2016

Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Jun 3, 2016. View on USAspending · Recipient on SAM.gov

Recipient

LocationBOSTON, MA
UEIRV5BLFKQHJ18
Business sizeSmall businessSize at award, per the contracting officer
Parent companyNANORAMIC, INC.

Business types and certifications

For-profit organizationCorporation (not tax-exempt)Manufacturer of goods

As represented in SAM.gov at the time of the action.

Subcontracting network

The prime, the subcontractors on this award, and their own subcontractors.

Subaward amounts are self-reported by prime contractors to SAM.gov and appear 1 to 2 months after the work. Duplicates are removed on a best-effort basis. Totals are incomplete and not an audit. Source: USAspending.

Agency and place

Awarding and funding

Awarded by
  1. National Aeronautics and Space Administration
  2. NASA SHARED SERVICES CENTER
Funded by
  1. National Aeronautics and Space Administration
  2. NASA SHARED SERVICES CENTER

Place of performance

Place of performance
Boston, Suffolk County, Massachusetts 02210-2384
Congressional district (place of performance)
MA-08As reported at the time of the action

Classification and competition

Classification

Competition

Extent competed
Full and open competition after exclusion of sourcesD
Solicitation procedures
Negotiated proposal/quoteNP
Set-aside
Small business set aside - totalSBA
Contract pricing
Firm fixed priceJ
Offers received
500

Solicitation and notices

Solicitation ID
NNX16SBIRPH1(as reported)

Contract details

Subcontracting plan
Plan not requiredB
Major program
High efficiency hybrid energy storage utilizing high power density
Service Contract Act labor standards
No
Commercial procedures
Commercial item procedures not usedD
Government-furnished property
Transaction does not use GFE/GFPN
Bundled requirement
Not a bundled requirementD
Consolidated requirement
No
Undefinitized action (terms not final)
No
Performance-based service acquisition
No - service where PBA is not used.N

Linked notices

Notice
Notice ID
Type
Link
Posted

Transaction history

Modification history

Base award
Jun 3, 2016Base obligation at award: $124,623
Latest action
Jun 3, 2016 — Base awardModification 0; obligation change +$124,623
Actions by type
  • Base award1
1 actions recorded, Jun 3, 2016 to Jun 3, 2016; each action counted once.

Similar awards

PIID
Match
Awardee

All contract data

All contract data

Every other field reported for this award, as of its latest reported action

Competition

Evaluation preference
No preference used
Local area set-aside
No
Simplified procedures for commercial items
No
A-76 (FAIR Act) action
No

Pricing and financing

Paid by purchase card
No
Latest action: change in base and exercised options
$124,623
Latest action: change in base and all options
$124,623

Socio-economic and policy

Recovered materials and sustainability
No clauses included and no sustainability includedC
EPA-designated product
Not requiredE
Clinger-Cohen Act planning (IT)
No
Research program (SBIR/STTR)
Small business innovation research program phase i actionSR1
Walsh-Healey Act (materials and supplies)
No
Construction wage rates (Davis-Bacon)
No

Place and origin

Domestic or foreign entity
U.S. owned businessA
Country of product or service origin
United statesUSA
Place of manufacture
Not a manufactured end productC

Structure

Award or IDV
Award
Award type
Purchase orderB
Awarding agency code
8000
Awarding sub-tier code
8000
Contracting office code
80NSSC
Transactions recorded under this award key
1

Funding

Funding agency code
8000
Funding sub-tier code
8000
Funding office code
80NSSC