Purchase order NNX16CP63PSPACE PROPULSION GROUP, INC.
Overview
Award facts
- Net obligations
- $123.75K
- $123,746of $123.75K potential value
- Period of performance
- Jun 10, 2016 to Dec 9, 2016
- Ended
- Modifications
- 0
- Latest action Jun 2, 2016
- Contract type
- Purchase order
- PIID NNX16CP63P
Description of requirement
IGF::OT::IGF A MARS SAMPLE RETURN (MSR) CAMPAIGN HAS BEEN IDENTIFIED AS THE CRITICAL NEXT STEP IN MARS SCIENCE. OF THE TASKS NEEDING TO BE ACCOMPLISHED, THE MARS ASCENT VEHICLE (MAV), OR MEANS FOR GETTING THE SAMPLES INTO ORBIT AROUND MARS, IS CONSIDERED THE HIGHEST RISK. THE MAV WILL BE REQUIRED TO REMAIN ON THE MARTIAN SURFACE FOR A YEAR OR MORE IN ORDER TO RETURN TO EARTH ON A MINIMUM ENERGY TRAJECTORY AND COORDINATE WITH THE OTHER ASPECTS OF THE MSR. ENVIRONMENTAL CONDITIONS ON MARS ARE A SIGNIFICANT CONCERN, WITH SEASONAL EXTREMES OF ABOUT ?110?C AND 25?C. TO REDUCE THE REQUIRED SYSTEM MASS AND POWER RELATED TO THERMAL MANAGEMENT, FUEL, OXIDIZER, AND IGNITION SYSTEM COMPONENTS SHOULD BE ABLE TO WITHSTAND THESE TEMPERATURE VARIATIONS. THE TRAJECTORY OF THE MAV ALSO HAS THE REQUIREMENT FOR RESTART CAPABILITIES. THE FOCUS OF THIS PROPOSAL IS THE DEVELOPMENT OF HYPERGOLIC IGNITION SYSTEMS FOR MAV APPLICATION. THE CURRENT OXIDIZER OF CHOICE FOR THE MAV IS A MIXED OXIDES OF NITROGEN (MON), WHICH IS A KNOWN HYPERGOL WITH MANY FUELS. THE PROPOSED SOLUTION USES METAL PARTICLES (E.G., HYDRIDES, BORANES, OR BOROHYDRIDES) TO GENERATE IGNITION BY INJECTION AND MIXING WITH THE OXIDIZER. THE PARTICLES ARE INITIALLY HOUSED IN A SEALED, PRESSURIZED CHAMBER PRIOR TO INJECTION. AN INERT GAS ACTS AS THE PRESSURANT FOR THE PARTICLES AND ALSO SERVES TO PROTECT THE PARTICLES FROM OXIDATION AND HYDROLYSIS DURING STORAGE. ELIMINATION OF POLYMERIC MATERIALS FROM THE IGNITION TRAIN ELIMINATES CONCERNS OF GLASS TRANSITION, WHICH COULD LEAD TO IGNITION FAILURE IN TRADITIONAL PYROTECHNIC/PYROGEN IGNITERS. THE FOCUS OF THE STUDY IS THE DESIGN, ANALYSIS, AND TESTING OF POTENTIAL PARTICLE INJECTION CONFIGURATIONS AND THE SELECTION OF THE IDEAL CANDIDATE PARTICLE TYPE AND MORPHOLOGY. AT THE COMPLETION OF PHASE I, AS SYSTEM READY FOR SUBSCALE TESTING IN A HYBRID ROCKET MOTOR WILL BE READY FOR IMPLEMENTATION.
Dates and value
- Award date
- Signed on Jun 2, 2016
- Potential end of performance
- Dec 8, 2016
- Current value
- $123,746Base and exercised options
- Potential value (if all options are exercised)
- $123,746
Obligations by fiscal year of action
- FY2016: $123,746
Total across 1 fiscal year: $123,746
Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Jun 2, 2016. View on USAspending · Recipient on SAM.gov
Recipient
Business types and certifications
As represented in SAM.gov at the time of the action.
Subcontracting network
The prime, the subcontractors on this award, and their own subcontractors.
Agency and place
Awarding and funding
- Awarded by
- National Aeronautics and Space Administration
- NASA SHARED SERVICES CENTER
- Funded by
- National Aeronautics and Space Administration
- NASA SHARED SERVICES CENTER
Place of performance
- Place of performance
- San Mateo, California 94402-1835
- Congressional district (place of performance)
- CA-15As reported at the time of the action
Classification and competition
Classification
- Product or service (PSC)
- AR11R&D- SPACE: AERONAUTICS/SPACE TECHNOLOGY (BASIC RESEARCH) (research and development)
Competition
- Extent competed
- Full and open competition after exclusion of sourcesD
- Solicitation procedures
- Negotiated proposal/quoteNP
- Set-aside
- Small business set aside - totalSBA
- Contract pricing
- Firm fixed priceJ
- Offers received
- 500
Solicitation and notices
- Solicitation ID
- NNX16SBIRPH1(as reported)
Contract details
- Subcontracting plan
- Plan not requiredB
- Major program
- Ignition systems for long-term storage and multi-start capability
- Service Contract Act labor standards
- No
- Commercial procedures
- Commercial item procedures not usedD
- Government-furnished property
- Transaction does not use GFE/GFPN
- Bundled requirement
- Not a bundled requirementD
- Consolidated requirement
- No
- Undefinitized action (terms not final)
- No
- Performance-based service acquisition
- No - service where PBA is not used.N
Linked notices
Notice | Notice ID | Type | Link | Posted |
|---|---|---|---|---|
Transaction history
Modification history
- Base award
- Jun 2, 2016Base obligation at award: $123,746
- Latest action
- Jun 2, 2016 — Base awardModification 0; obligation change +$123,746
- Actions by type
- Base award1
Similar awards
PIID | Match | Awardee |
|---|---|---|
All contract data
All contract data
Every other field reported for this award, as of its latest reported action
Competition
- Evaluation preference
- No preference used
- Local area set-aside
- No
- Simplified procedures for commercial items
- No
- A-76 (FAIR Act) action
- No
Pricing and financing
- Paid by purchase card
- No
- Latest action: change in base and exercised options
- $123,746
- Latest action: change in base and all options
- $123,746
Socio-economic and policy
- Recovered materials and sustainability
- No clauses included and no sustainability includedC
- EPA-designated product
- Not requiredE
- Clinger-Cohen Act planning (IT)
- No
- Research program (SBIR/STTR)
- Small business innovation research program phase i actionSR1
- Walsh-Healey Act (materials and supplies)
- No
- Construction wage rates (Davis-Bacon)
- No
Place and origin
- Domestic or foreign entity
- U.S. owned businessA
- Country of product or service origin
- United statesUSA
- Place of manufacture
- Not a manufactured end productC
Structure
- Award or IDV
- Award
- Award type
- Purchase orderB
- Awarding agency code
- 8000
- Awarding sub-tier code
- 8000
- Contracting office code
- 80NSSC
- Transactions recorded under this award key
- 1
Funding
- Funding agency code
- 8000
- Funding sub-tier code
- 8000
- Funding office code
- 80NSSC