Purchase order NNX17CK13POLSEN, ROLF M
Overview
Award facts
- Net obligations
- $124.98K
- $124,984of $124.98K potential value
- Period of performance
- Jun 8, 2018 to Jun 8, 2018
- Ended
- Modifications
- 1
- Latest action Jun 8, 2018
- Contract type
- Purchase order
- PIID NNX17CK13P
Description of requirement
IGF::OT::IGF THIS PROPOSAL COVERS PROCESSING OF RAW MARTIAN REGOLITH TO BOTH AN ENRICHED IRON ORE AND LIBERATED WATER, AND ALSO IRON ORE REDUCTION AND OXYGEN PRODUCTION, METAL PURIFICATION AND STEEL POWDER MAKING. OUR PROPOSAL USES HEAT RE-CYCLING TO IMPROVE THE ENERGY EFFICIENCY OF BOTH REGOLITH-TO-ORE ENRICHMENT AND IRON ORE REDUCTION. THIS HEAT RE-CYCLING CREATES A BONUS, THE LIBERATION OF WATER (FORMERLY BOUND TO THE REGOLITH) AS LIQUID WATER AND A RELATIVELY LOW TEMPERATURE WATER VAPOR. THIS WATER CAN BE RETRIEVED WITH THE ADDITION OF A SMALL CONDENSER UNIT AND A WATER STORAGE TANK/HEAT SINK. IRON (AND OTHER TRANSITION METAL) OXIDES ARE REDUCED USING A REDUCING GAS MIXTURE OF HYDROGEN AND CARBON MONOXIDE INSIDE TWO MULTI-USE VESSELS (MUVS, IN WHICH HEAT RECYCLING IS ALSO DONE). THE REDUCTION MAKES METALS, MOSTLY IRON, BUT ALSO EXHAUSTS WATER AND CARBON DIOXIDE. THIS EXHAUST IS RE-CYCLED TO A WATER/CARBON DIOXIDE SPLITTER THAT PRODUCES THE HYDROGEN AND CARBON MONOXIDE REDUCING GASES AND ALSO OXYGEN. THE PREFERRED WATER/CARBON DIOXIDE SPLITTER IS A SOLID OXIDE ELECTROLYSIS CELL (SOEC) FROM CERAMATEC (MAKER OF THE SOEC FOR NASA'S MOXIE), AND CERAMATEC HAS ASKED TO BE INCLUDED IN THE PROPOSAL WITH A BUDGET PLACEHOLDER AS A SUPPLIER. METAL PURIFICATION AND STEEL POWDER MAKING IS DONE USING CARBONYL METALLURGY TECHNIQUES DEVELOPED BY BASF WITH A POSSIBLE VARIATION TO REPLACE STEEL POWDER MAKING WITH METAL VAPOR DEPOSITION TO SHAPED STEEL OBJECTS (AS PREVIOUSLY ADVOCATED FOR BY WILLIAM JENKINS). IT SHOULD BE EMPHASIZED THAT THE ENTIRE MANUFACTURING CHAIN, AND AN EXTENDED CHAIN THAN INCLUDES 3D METAL POWDER PRINTING TO FINISHED STEEL OBJECTS, (I) CAN BE OPERATED BY ROBOTS (THAT CAN ALSO CARRY OUT ORE MINING), AND (II) THE ROBOTS AND EQUIPMENT NEEDED TO CARRY OUT THIS MINING AND MANUFACTURING CHAIN CAN BE MADE SUCH THAT THEIR ENTIRE COMBINED TOTAL MASS IS SMALL ENOUGH TO FIT IN MARS LANDING CRAFT PAYLOADS WELL UNDER 2500 KG.
Dates and value
- Award date
- Signed on Jun 7, 2017
- Potential end of performance
- Jun 7, 2018
- Current value
- $124,984Base and exercised options
- Potential value (if all options are exercised)
- $124,984
Obligations by fiscal year of action
- FY2017: $124,984
Total across 1 fiscal year: $124,984
Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Jun 8, 2018. View on USAspending · Recipient on SAM.gov
Recipient
Business types and certifications
As represented in SAM.gov at the time of the action.
Subcontracting network
The prime, the subcontractors on this award, and their own subcontractors.
Agency and place
Awarding and funding
- Awarded by
- National Aeronautics and Space Administration
- NASA SHARED SERVICES CENTER
- Funded by
- National Aeronautics and Space Administration
- NASA SHARED SERVICES CENTER
- Funded from
- Space technology (DIRECT)Program activities080-0131Federal accounts (agency financial reports)
Place of performance
- Place of performance
- West Bloomfield, Michigan
Classification and competition
Classification
- Product or service (PSC)
- AR11R&D- SPACE: AERONAUTICS/SPACE TECHNOLOGY (BASIC RESEARCH) (research and development)
Competition
- Extent competed
- Full and open competition after exclusion of sourcesD
- Solicitation procedures
- Negotiated proposal/quoteNP
- Set-aside
- Small business set aside - totalSBA
- Contract pricing
- Firm fixed priceJ
- Offers received
- 500
Contract details
- Subcontracting plan
- Plan not requiredB
- Major program
- Regolith to steel powder, oxygen&water with small equipment
- Service Contract Act labor standards
- No
- Commercial procedures
- Commercial item procedures not usedD
- Government-furnished property
- Transaction does not use GFE/GFPN
- Bundled requirement
- Not bundledH
- Consolidated requirement
- Not consolidatedD
- Undefinitized action (terms not final)
- No
- Performance-based service acquisition
- No - service where PBA is not used.N
Linked notices
Notice | Notice ID | Type | Link | Posted |
|---|---|---|---|---|
Transaction history
Modification history
- Base award
- Jun 7, 2017Base obligation at award: $124,984
- Latest action
- Jun 8, 2018 — Other administrative actionModification 1; administrative: no change in scope or value
- Actions by type
- Base award1
- Other administrative action1
Similar awards
PIID | Match | Awardee |
|---|---|---|
All contract data
All contract data
Every other field reported for this award, as of its latest reported action
Competition
- Evaluation preference
- No preference used
- Local area set-aside
- No
- Simplified procedures for commercial items
- No
- A-76 (FAIR Act) action
- No
Pricing and financing
- Paid by purchase card
- No
Socio-economic and policy
- Inherently governmental functions
- Other functionsOT
- Recovered materials and sustainability
- No clauses included and no sustainability includedC
- EPA-designated product
- Not requiredE
- Clinger-Cohen Act planning (IT)
- No
- Research program (SBIR/STTR)
- Small technology transfer research program phase iST1
- Walsh-Healey Act (materials and supplies)
- No
- Construction wage rates (Davis-Bacon)
- No
Place and origin
- Domestic or foreign entity
- U.S. owned businessA
- Country of product or service origin
- United statesUSA
- Place of manufacture
- Not a manufactured end productC
Structure
- Award or IDV
- Award
- Award type
- Purchase orderB
- Awarding agency code
- 8000
- Awarding sub-tier code
- 8000
- Contracting office code
- 80NSSC
- Transactions recorded under this award key
- 2
Funding
- Funding agency code
- 8000
- Funding sub-tier code
- 8000
- Funding office code
- 80NSSC
- Treasury accounts
- 080-2017/2018-0131-000
- Object classes
- 25.5: Research and development contracts