GovChime
AWARDPOSmall business

Po V640C04540JOHNSON'S BOILER & CONTROL, INC.

Overview

Award facts

Period of performance
Feb 12, 2010 to Jun 12, 2010
Ended
Modifications
0
Latest action Feb 12, 2010
Contract type
Po
PIID V640C04540

Description of requirement

UNIT TOTAL ITEM DESCRIPTION QTY UNIT COST COST -------------------------------------------------------------------------------- 1 ****SERVICE REQUEST*** 1 JB 4200.00 4200.00 JOB: REPLACEMENT OF #1 BOILER'S MODULATING MOTOR AT THE LIVERMORE DIVISION OF THE VAPAHC. SERVICE CONTRACTOR WILL PROVIDE ALL LABOR AND MATERIALS NEEDED TO REPLACE EXISTING NON-FUNCTIONING HAYS CLEVELAND BOILER MODULATING CONTROL WITH A HONEYWELL MODULATING MOTOR CONTROL MODEL M9484F1031 THAT HAS THE REQUIRED 2 END SWITCHES 5-54 DEGREE ADJUSTABLE, TORQUE ENTER '^' TO HALT: UNIT TOTAL ITEM DESCRIPTION QTY UNIT COST COST -------------------------------------------------------------------------------- AND TRAVEL AS THE FACTORY MOD MOTOR. CONTRACTOR WILL LEAVE THE OLD HAYS CLEVELAND MOTOR AND END WITH PLANT OPERATOR FOR PLANT SPARE PARTS. CONTRACTOR WILL HOOK-UP THE NEW MODULATING MOTOR TO THE EXISTING D-8 AND M-D HIGH FIRE PURGE AND LOW FIRE START CIRCUITS, THEN TESTING ELECTRICALLY BEFORE FIRING THE BOILER. CONTRACTOR WILL TEST AND CONFIRM OPERATIONAL COMPATIBILITY OF THE EXISTING SUB MASTER CONTROLLER AND THE NEW MODULATING MOTOR. ENTER '^' TO HALT: UNIT TOTAL ITEM DESCRIPTION QTY UNIT COST COST -------------------------------------------------------------------------------- CONTRACTOR WILL UPDATE THE PLANT MASTER SCHEMATIC DRAWINGS TO REFLECT CHANGES MADE AS A RESULT OF THE NEW MODULATING MOTOR INTERFACE WITH EXISTING SYSTEM OPERATION. CONTRACTOR WILL NOT DISTURB THE FIRING POINTS ADJUSTMENTS OF THE GAS AND FUEL OIL VALVES AND LINKAGES. IF A DISTURBANCE OF FIRING POINTS OCCURS THE COTR WILL BE NOTIFIED IN ORDER TO ADDRESS WHAT FURTHER ACTION MAY BE NEEDED, SUCH AS RETUNING THE ENTER '^' TO HALT: UNIT TOTAL ITEM DESCRIPTION QTY UNIT COST COST -------------------------------------------------------------------------------- BOILER. COST ADJUSTMENT MAY BE REQUIRED. CONTRACTOR WILL CHECK THE COMBUSTION WITH A PORTABLE TESTER TO CONFIRM THE FIRING O2 LEVELS FOR PROPER OPERATION OF THE OXYMIZER LOW O2 ALARM CIRCUITS. BOC: 2520 FMS LINE: 001

Dates and value

Award date
Signed on Feb 12, 2010
Potential end of performance
Jun 11, 2010

Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Feb 12, 2010. View on USAspending · Recipient on SAM.gov

Recipient

LocationFRESNO, CA
UEIJC9VMLJN35N3
Business sizeSmall businessSize at award, per the contracting officer

Business types and certifications

For-profit organizationCorporation (not tax-exempt)

As represented in SAM.gov at the time of the action.

Subcontracting network

The prime, the subcontractors on this award, and their own subcontractors.

Subaward amounts are self-reported by prime contractors to SAM.gov and appear 1 to 2 months after the work. Duplicates are removed on a best-effort basis. Totals are incomplete and not an audit. Source: USAspending.

Agency and place

Awarding and funding

Awarded by
  1. Department of Veterans Affairs
  2. 640-PALO ALTO
Funded by
  1. Department of Veterans Affairs
  2. 640-PALO ALTO

Place of performance

Place of performance
Palo Alto, Santa Clara County, California 94304-1290
Congressional district (place of performance)
CA-16As reported at the time of the action

Classification and competition

Classification

Competition

Extent competed
Not competed under SAPG
Reason not competed
Authorized by statuteOTH
Solicitation procedures
Simplified acquisitionSP1
Set-aside
No set-aside used
Contract pricing
Firm fixed priceJ
Offers received
1

Contract details

Subcontracting plan
Plan not requiredB
Service Contract Act labor standards
No
Government-furnished property
Transaction does not use GFE/GFPN
Bundled requirement
Not a bundled requirementD
Consolidated requirement
No
Undefinitized action (terms not final)
No
Performance-based service acquisition
Yes - service where PBA is used.Y

Linked notices

Notice
Notice ID
Type
Link
Posted

Transaction history

Modification history

Base award
Feb 12, 2010Base obligation at award: $4,200
Latest action
Feb 12, 2010 — Base awardModification 0; obligation change +$4,200
Actions by type
  • Base award1
1 actions recorded, Feb 12, 2010 to Feb 12, 2010; each action counted once.

Similar awards

PIID
Match
Awardee

All contract data

All contract data

Every other field reported for this award, as of its latest reported action

Competition

Evaluation preference
No preference used
Synopsized publicly (SAM.gov / FedBizOpps)
No
Simplified procedures for commercial items
No

Pricing and financing

Paid by purchase card
No
Latest action: change in base and exercised options
$4,200
Latest action: change in base and all options
$4,200

Socio-economic and policy

Recovered materials and sustainability
No clauses included and no sustainability incluC
EPA-designated product
Not requiredE
Walsh-Healey Act (materials and supplies)
No
Construction wage rates (Davis-Bacon)
No

Place and origin

Domestic or foreign entity
U.S. owned businessA
Place of manufacture
Not a manufactured end productC

Structure

Award or IDV
Award
Award type
PoB
Awarding agency code
3600
Awarding sub-tier code
3600
Contracting office code
00640
Transactions recorded under this award key
1

Funding

Funding agency code
3600
Funding sub-tier code
3600
Funding office code
00640