GovChime
AWARDPURCHASE ORDERSmall business

Purchase order W912DQ09P0204FRITSCHI BROTHERS HARDWOODS

Overview

Award facts

Net obligations
$8K
$8,000of $8K potential value
Period of performance
Aug 19, 2009 to Nov 1, 2009
Ended
Modifications
0
Latest action Aug 20, 2009
Contract type
Purchase order
PIID W912DQ09P0204

Description of requirement

TAS::96 3135::TAS ARRA-CUT TREES IN SPILLWAY THIS CONTRACT WILL BE FUNDED BY MONEY FROM THE AMERICAN RECOVERY AND REINVESTMENT ACT. THE TUTTLE CREEK CORPS OF ENGINEERS IS SOLICITING BIDS FOR THE CLEARING OF ALL WOODY MATERIALS, TREES AND BRUSH, FROM THE TUTTLE CREEK SPILLWAY ON THE EAST SIDE OF TUTTLE CREEK DAM. THIS IS A TURNKEY JOB. THE CONTRACTOR WILL FURNISH ALL TOOLS, MATERIALS, FUEL AND SUPPLIES NECESSARY TO DO THE JOB. THE WORK MUST BE COMPLETED BY 20 SEPTEMBER 2009. IN THE EVENT OF A FLOOD THE CORPS DOES NOT WANT TREES UPSTREAM OF THE SPILLWAY TAINTER GATES THAT MIGHT WASH OUT AND GET LODGED IN THE GATES. TREES BELOW THE GATES SHOULD ALSO BE CUT SO THEY DO NOT TRAP DEBRIS AND FORM A DAM HINDERING THE FLOW OF WATER. THE SPILLWAY IS APPROXIMATELY 6,000 LONG. ITS WIDTH VARIES FROM 250 TO 800 . ALL TREES FROM THE UPSTREAM END OF THE SPILLWAY THAT TOUCHES TUTTLE CREEK LAKE THROUGH THE ENTIRE SPILLWAY TO THE PAVED ROAD THAT CROSSES THE SPILLWAY AT ITS LOWER END ARE TO BE CUT DOWN. BESIDES ALL THE TREES ON THE FLOOR OF THE SPILLWAY TREES UPSTREAM OF THE GATES WILL BE CUT 50 UP FROM THE BOTTOM OF THE SPILLWAY ON THE SIDE ON THE EMBANKMENT. TREES DOWNSTREAM OF THE SPILLWAY GATES WILL BE CUT FIVE FEET UP ON EACH SIDE EMBANKMENT. ALL CEDAR TREES WILL BE CUT BELOW THEIR LOWEST BRANCH OR HAVE THE REMAINING BRANCHES CUT OFF. ALL DECIDUOUS TREES SHALL HAVE THEIR STUMPS TREATED WITH PATHWAY, TORDON RTU OR ANOTHER STUMP TREATMENT TO KEEP THEM FROM RESPROUTING. . BRUSH SUCH AS, BUT NOT LIMITED TO, BUCKBRUSH OR SUMAC WITH A STEM OF LESS THAN 1 IN DIAMETER MAY BE SPRAYED WITH HERBICIDE TO KILL THEM. IF A RESTRICTED USE HERBICIDE IS USED, THE APPLICATOR MUST HAVE THE PROPER TRAINING AND LICENSES. THE CONTRACTOR WILL BE RESPONSIBLE FOR RETURNING AND RETREATING ANY STUMP THAT RESPROUTS OR BRUSH THAT IS NOT KILLED. ALL TREES UPSTREAM OF THE GATES MUST BE DISPOSED OF OR REDUCED SO THAT THE DEAD TREES WILL NOT FLOAT INTO THE GATES. ACCEPTABLE METHODS ARE HAULING OFFSITE TO DISPOSE OF THE DEAD TREES, CHIPPING THEM OR BURNING THEM. IF THEY ARE BURNED POTTAWATOMIE SHERIFF S OFFICE MUST BE NOTIFIED. TRACTORS, ATVS, CHIPPERS AND OTHER MACHINES MAY BE BROUGHT INTO THE SPILLWAY TO FACILITATE WORK, HOWEVER THE UPSTREAM AREA IS OFTEN MUDDY AND THE DOWNSTREAM AREA IS VERY ROUGH TERRAIN. ALL RUTS AND DAMAGE TO THE TERRAIN MUST BE REPAIRED. A SITE VISIT IS STRONGLY ENCOURAGED. ACCESS TO THE UPSTREAM SIDE OF THE SPILLWAY IS THROUGH THE TREVI ICOS YARD, THE PARKING LOT ON THE NORTH SIDE OF THE ROAD ON THE EAST END OF THE DAM. DOWNSTREAM ACCESS IS THROUGH THE SPILLWAY CYCLE AREA PARKING LOT. TREES DOWNSTREAM OF THE GATES SHALL BE CUT, THE STUMPS TREATED AND THE TREE CAN BE LEFT LAYING WHERE IT FALLS. ALL WORK MUST BE DONE ACCORDING TO THE SAFETY RULES LAID OUT IN EM 385-1-1.

Dates and value

Award date
Signed on Aug 20, 2009
Potential end of performance
Oct 31, 2009
Current value
$8,000Base and exercised options
Potential value (if all options are exercised)
$8,000

Obligations by fiscal year of action

  • FY2009: $8,000

Total across 1 fiscal year: $8,000

The Department of Defense funded and awarded this contract. DoD contract actions are withheld at the source for about 90 days after signature, so actions signed after Aug 21, 2026 are not yet public.

Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Aug 20, 2009. View on USAspending · Recipient on SAM.gov

Recipient

LocationHANOVER, KS
UEIW2NYKKMXD2H3
Business sizeSmall businessSize at award, per the contracting officer
Organization typeSole proprietorship

Business types and certifications

For-profit organization

As represented in SAM.gov at the time of the action.

Subcontracting network

The prime, the subcontractors on this award, and their own subcontractors.

Subaward amounts are self-reported by prime contractors to SAM.gov and appear 1 to 2 months after the work. Duplicates are removed on a best-effort basis. Totals are incomplete and not an audit. Source: USAspending.

Agency and place

Awarding and funding

Awarded by
  1. Department of Defense
  2. Department Of The Army
  3. W071 ENDIST KANSAS CITY
Funded by
  1. Department of Defense
  2. Department Of The Army
  3. W071 ENDIST KANSAS CITY

Place of performance

Place of performance
Manhattan, Kansas

Classification and competition

Classification

Product or service (PSC)
F014TREE THINNING SERVICES (service)

Competition

Extent competed
Full and open competition after exclusion of sourcesD
Solicitation procedures
Negotiated proposal/quoteNP
Set-aside
Small business set aside - totalSBA
Contract pricing
Firm fixed priceJ
Offers received
4

Solicitation and notices

Solicitation ID
W912DQ09T1033(as reported)

Contract details

Subcontracting plan
Plan not requiredB
Service Contract Act labor standards
No
Commercial procedures
Commercial itemA
Government-furnished property
Transaction does not use GFE/GFPN
Consolidated requirement
No
Undefinitized action (terms not final)
Letter contractA
Performance-based service acquisition
No - service where PBA is not used.N

Linked notices

Notice
Notice ID
Type
Link
Posted

Transaction history

Modification history

Base award
Aug 20, 2009Base obligation at award: $8,000
Latest action
Aug 20, 2009 — Base awardModification 0; obligation change +$8,000
Actions by type
  • Base award1
1 actions recorded, Aug 20, 2009 to Aug 20, 2009; each action counted once.

Similar awards

PIID
Match
Awardee

All contract data

All contract data

Every other field reported for this award, as of its latest reported action

Competition

Evaluation preference
No preference used
Local area set-aside
No
Simplified procedures for commercial items
No
A-76 (FAIR Act) action
No

Pricing and financing

Paid by purchase card
No
Latest action: change in base and exercised options
$8,000
Latest action: change in base and all options
$8,000

Socio-economic and policy

Recovered materials and sustainability
No clauses included and no sustainability includedC
EPA-designated product
Not requiredE
Clinger-Cohen Act planning (IT)
No
Walsh-Healey Act (materials and supplies)
No
Construction wage rates (Davis-Bacon)
No

Place and origin

Domestic or foreign entity
U.S. owned businessA
Country of product or service origin
United statesUSA
Place of manufacture
Not a manufactured end productC
Sea transportation
No

Structure

Award or IDV
Award
Award type
Purchase orderB
IT commercial item category
Not IT products or servicesZ
DoD claimant program
ServicesS1
Awarding agency code
9700
Awarding sub-tier code
2100
Contracting office code
W912DQ
Transactions recorded under this award key
1

Funding

Funding agency code
9700
Funding sub-tier code
2100
Funding office code
W912DQ