GovChime
IDVOther than small business

IDC (single-award IDV) NNK15MA02BSIERRA NEVADA COMPANY, LLC

Overview

Award facts

Obligated on orders under this IDV
$10.98M
$10,975,680 across 7 orders
Period of performance
From Feb 25, 2019
Modifications
10
Latest action Feb 25, 2019
Contract type
IDC (single-award IDV)
PIID NNK15MA02B

Description of requirement

IGF::OT::IGF ADVANCED PLANT HABITAT. THE CONTRACTOR SHALL PROVIDE THE ITEM OR SERVICES SPECIFIED IN SECTION B IN ACCORDANCE WITH THE FOLLOWING: 1.0 THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION PLANS FOR THE ADVANCED PLANT HABITAT (APH) PROJECT IS TO FABRICATE AND CERTIFY A PLANT HABITAT (PH) FACILITY FOR IMPLEMENTATION ON THE INTERNATIONAL SPACE STATION (ISS) THAT WILL PROVIDE THE RESEARCH COMMUNITY A LARGE ENVIRONMENTALLY CONTROLLED GROWTH CHAMBER FOR USE ON THE ISS. THE NATIONAL AERONAUTICS AND SPACE ADMINISTRATION REQUIRES FABRICATION, CERTIFICATION, AND IMPLEMENTATION SUPPORT IN THE DEVELOPMENT OF THIS FACILITY WHICH INCLUDES SUBSYSTEMS/ORBITAL REPLACEMENT UNIT (ORU) AND PARTS TO REPAIR THE SUBSYSTEMS/ORU IN ACCORDANCE WITH ATTACHMENT J-01 SYSTEMS REQUIREMENTS DOCUMENT FOR THE PLANT HABITAT (PH), PH-R0001 AND ATTACHMENT J-02 CONTRACT WORK BREAKDOWN STRUCTURE. 2.0 THE CONTRACTOR SHALL FABRICATE FLIGHT PH THAT CONSISTS OF THE FOLLOWING: A. AVIONICS (2.1) THE PLANT HABITAT AVIONICS REAL-TIME MANAGER (PHARMER) IN EXPEDITE THE PROCESSING OF EXPERIMENTS TO SPACE STATION (EXPRESS) RACK IS THE PRIMARY HARDWARE THAT COMMUNICATES WITH THE CORE MICROCONTROLLERS THAT EXISTS IN EACH SUBSYSTEM AND ALLOWS CONTROL AND COLLECTION OF SYSTEM AND SCIENCE DATA. B. SOFTWARE (2.2) THE SOFTWARE CONTROLS BOTH SYSTEM AND PLANT GROWTH CHAMBER PARAMETERS AND COLLECTS BOTH SCIENCE AND SYSTEM DATA. THE THREE SOFTWARE S BEING DEVELOPED IS FOR THE PHARMER, GROUND SCIENCE STATION, AND THE EXPRESS RACK COMPUTER ON THE ISS. C. GROWTH LIGHT ASSEMBLY (GLA) (2.3) THE GLA PROVIDES THE NECESSARY LIGHT INTENSITY (UP TO 1000 MOL/M2S @ 15CM) AND LIGHT LEVEL ( MOL/M2S @ 15CM) AT 600 RED, 400 BLUE, 100 GREEN, 50 FAR RED, 600 WHITE, AND INFRA-RED (IR) FOR NIGHT FOR PLANT GROWTH. THE GLA ALSO CONTAINS A CAMERA FOR TOP VIEW IMAGING OF THE PLANTS. D. POWER DISTRIBUTION ASSEMBLY (PDA) (2.4) THE PDA RECEIVES 28V POWER FROM FOUR EXPRESS RACK POWER FEEDS. THE PDA CONVERTS THAT POWER AS NECESSARY (DIFFERENT VOLTAGES) TO PROVIDE POWER TO THE OTHER SUBSYSTEMS WITHIN PH AS REQUIRED. E. THERMAL CONTROL SYSTEM (TCS) (2.5) THE TCS CONSIST OF THE MODERATE TEMPERATURE LOOP (MTL) COLDPLATES ON THE ENVIRONMENTAL CONTROL SYSTEM (ECS), AVIONICS UNIT, PDA, AND GLA; IT ALSO CONSIST OF THE AVIONICS AIR ASSEMBLY (AAA) FORCED AIR FROM THE EXPRESS RACK THAT COOLS THE ORU DRAWER INSIDE THE PH CAVITY, AND INSIDE THE INTERNATIONAL SUBRACK INTERFACE STANDARD)(ISIS) DRAWER. F. WATER RECOVERY AND DELIVERY SYSTEM (WRADS) (2.6) THE WRADS STORES RECOVERED CONDENSATE WATER DELIVERED BY THE ECS, TRANSFER WATER FROM THE RECOVERY STORAGE RESERVOIR TO THE HUMIDITY CONTROL UNIT DURING PRIMING OPERATIONS, TRANSFER RECOVERED CONDENSATE WATER TO THE DISTRIBUTION STORAGE RESERVOIR, TRANSFER WATER FROM THE DISTRIBUTION STORAGE RESERVOIR TO THE SCIENCE CARRIER ROOT TRAY FOR MOISTURE CONTROL (FEEDING), AND PRIME THE SCIENCE CARRIER ROOT TRAY FOR SEED GERMINATION. G. ENVIRONMENTAL CONTROL SYSTEM (ECS) (2.7) THE ECS HAS CAPABILITY FOR AIR CIRCULATION&TEMPERATURE/HUMIDITY CONTROL, CARBON DIOXIDE CONTROL, ETHYLENE REMOVAL&AIR SAMPLE, AND ECS PRESSURE AND OXYGEN CONCENTRATION MAINTENANCE. H. SCIENCE CARRIER (2.8) THE SCIENCE CARRIER IS A REMOVABLE AND RECONFIGURABLE TRAY WITHIN THE APH THAT WILL PROVIDE THE PRINCIPLE STRUCTURAL SUPPORT AND FINAL WATER DELIVERY TO THE ROOT-ZONE FOR PLANT GROWTH EXPERIMENTATION. I. GROWTH CHAMBER (2.9) THE GROWTH CHAMBER IS THE PLANT GROW AREA. IT INTERFACES WITH THE ECS MODULES, SCIENCE CARRIER, AND THE GLA (THROUGH A WINDOW). IT ALSO CONTAINS COMPONENTS ON THE BACK OF THE CHAMBER FOR ATMOSPHERE CONTROL, IMAGING CAPABILITY (2 CAMERAS), AND A POWER&COMMUNICATION MICROCONTROLLER. J. STRUCTURAL MOUNTING ASSEMBLY (SMA) (2.10) THE SMA CONSISTS OF THE BACKPLATE, OUTER SKIN, BOTTOM PAN, AND ORU/CHAMBER MOUNTING RAILS, ORU DRAWER, AND AIR FILTRATION ASSEMBLY. 3.0 THE CONTRACTOR SHALL FABRICATE ORBITAL REPLACEMENT UNIT (ORU) FOR PH THAT CONSISTS OF AVIONICS (3.1

Dates and value

Award date
Signed on Dec 10, 2014
Ordering period ends
Sep 30, 2019
Ceiling
Ceiling (single-award vehicle): $11,350,000

Source: Federal Procurement Data System contract actions as published by SAM.gov and USAspending.gov; latest action recorded Feb 25, 2019. View on USAspending · Recipient on SAM.gov

Recipient

LocationSPARKS, NV
UEIDD2QET4D27T3
CAGE code8X691
Business sizeOther than small businessSize at award, per the contracting officer
Organization typeCorporate not tax exempt

Business types and certifications

Women-ownedFor-profit organizationSubchapter S corporationCorporation (not tax-exempt)Manufacturer of goods

Self-reported at the time of the action.

Agency and place

Awarding and funding

Awarded by
  1. National Aeronautics and Space Administration
  2. NASA KENNEDY SPACE CENTER
Funded by
  1. National Aeronautics and Space Administration
  2. NASA KENNEDY SPACE CENTER

Classification and competition

Classification

Product or service (PSC)
AR14R&D- SPACE: AERONAUTICS/SPACE TECHNOLOGY (ENGINEERING DEVELOPMENT) (research and development)

Competition

Extent competed
Not competedC
Reason not competed
Follow-on contract (FAR 6.302-1(A)(2)(II/III))FOC
Solicitation procedures
Only one sourceSSS
Set-aside
No set-aside used
Contract pricing
Firm fixed priceJ
Offers received
1

Solicitation and notices

Solicitation ID
NNK14ZMS004R
Notices

Contract details

Subcontracting plan
Plan not requiredB
Major program
Advanced plant habitat (APH)
Cost Accounting Standards clause
Yes - CAS clause includedY
Certified cost or pricing data
Yes
Commercial procedures
Commercial item procedures not usedD
Government-furnished property
Transaction does not use GFE/GFPN
Bundled requirement
Not a bundled requirementD
Consolidated requirement
No
Undefinitized action (terms not final)
No
Multi-year contract
Yes
Performance-based service acquisition
No - service where PBA is not used.N

Transaction history

Modification history

Base award
Dec 10, 2014
Latest action
Feb 25, 2019 — Supplemental agreement (within scope)Modification 10
Latest substantive action
Feb 25, 2019 — Supplemental agreement (within scope)Modification 10
Actions by type
  • Base award1
  • Supplemental agreement (within scope)6
  • Other administrative action3
  • Novation (contract transferred)1
11 actions recorded, Dec 10, 2014 to Feb 25, 2019; each action counted once.

All contract data

All contract data

Every other field reported for this award, as of its latest reported action

Competition

Evaluation preference
No preference used
Local area set-aside
No
Synopsized publicly (SAM.gov / FedBizOpps)
Yes
Simplified procedures for commercial items
No
A-76 (FAIR Act) action
No

Socio-economic and policy

Inherently governmental functions
Other functionsOT
Recovered materials and sustainability
No clauses included and no sustainability includedC
Clinger-Cohen Act planning (IT)
No

Place and origin

Domestic or foreign entity
U.S. owned businessA

Structure

Award or IDV
IDV
IDV type
IDCB
Indefinite-delivery contract type
Indefinite delivery / indefinite quantityB
Multiple or single award
Single awardS
Awarding agency code
8000
Awarding sub-tier code
8000
Contracting office code
80KSC0
Transactions recorded under this award key
9

Funding

Funding agency code
8000
Funding sub-tier code
8000
Funding office code
80KSC0