4520-01-328-7252 Igniter,spark,fuel
One item DLA buys: its open requests for quotation, approved sources and past DLA awards.
Overview
National Stock Number record
- Open RFQs
- 1
- Next due November 23, 2026
- Last price paid
- …
- Standard price
- $0.97 per EA
- DLA's catalog price, not a price paid
- Approved sources
- 1
- One approved manufacturer listed
- Awards on record
- 0
- DLA demand
- –
Identification
- Item name
- Igniter,spark,fuel
- NSG (group)
- 45 · Plumbing, heating, waste disposal
- NIIN assigned
- 06-NOV-90
- Unit
- EA (Each)
- NSN
- 4520-01-328-7252
- NIIN
- 01-328-7252
Name, end product, NIIN date and unit: DLA's Federal Logistics Information System (PUB LOG). Source: the request-for-quotation (RFQ) files DLA publishes on DIBBS each day. An RFQ that is also a SAM.gov notice links to that notice. Return-by dates are DIBBS's.
Approved suppliers
Manufacturers and part numbers DLA has qualified for this item, and the part numbers in its catalog record
| Supplier | CAGE | CAGE status | Part status (RNCC / RNVC) | Supplier part # | Listed in |
|---|---|---|---|---|---|
| UNISON INDUSTRIES LLC | 59501 | A (Active) | 5 (Secondary reference) / 2 (An item-identifying number) | 44252 | DLA approved-source file |
| 99207 | A (Active) | 1 (Source control reference) / 2 (An item-identifying number) | 4068T11P02 | FLIS part list | |
| 83311 | A (Active) | 3 (Design control reference) / 9 (Was the design control reference) | 44525 | FLIS part list | |
| 9009H | A (Active) | 6 (Informative reference) / 9 (Was the design control reference) | 4520PL2175973 | FLIS part list |
Source: DLA's approved-source file published with the RFQs and the part list of DLA's catalog record (FLIS). CAGE and part status are FLIS's codes with DLA's wording.
Pricing and awardees
Characteristics
Government-defined characteristics of this item (FLIS)
Hazardous and environmental
- Hazardous material (HMIC)
- N (No data in hmirs)
Product characteristics
| Code | Requirement | Description |
|---|---|---|
| HGTH | Height | INCHES MAXIMUM 4.670 |
| ABRY | Length | INCHES MAXIMUM 5.030 |
| CXCY | Part name assigned by controlling agency | EXCITER, IGNITION |
| AXNM | Plug design | STRAIGHT |
| FEAT | Special features | RECEPTACLE SHALL MEET THE INTERFACE REQUIREMENTS OF MIL-DTL-83723/88H; SHELL SIZE 12, PIN INSERT 3, KEYWAY 6; CONNECTOR DESIGN MUST CONFORM WITH THE REQUIREMENTS DEFINED IN M50TF2238 CL-A; WEIGHT NOT TO EXCEED 2.5LBS |
| SPCL | Special test features | SPOT FACE PERMISSIBLE IF NECESSARY TO MAINTAIN THICKNESS FOR MINUMUM DIAMETER; SPOT FACE TO BE CONCENTRIC WITH DIAMETER WITHIN + OR - .01 RADIUS |
| SUPP | Supplementary features | MARKINGS SHALL INCLUDE SERIAL NUMBER AND DATE OF MANUFACTURE; IDENTIFYING CHARACTERS SHALL BE BLACK ON WHITE OR ALUMINUM BACKGROUND OR WHITE OR ALUMINUM ON BLACK BACKGROUND OR PERMANENTLY MARKED PER AS478-15B2 OR AS478-15B3; A TRANSPARENT ENVIRONMENT RESISTING COATING SHALL BE PROVIDED OVER THE IDENTIFICATION MARKING |
| ABGL | Width | INCHES MAXIMUM 2.720 |
Additional identifiers
- II
- 0
- DEMIL
- A: No demilitarization required
- Precious metals (PMIC)
- U (Type/content is unknown)
- PINC
- 0033715
- Criticality (CRIT CD)
- X
Source: DLA's PUB LOG files (FLIS Data Electronic Reading Room), updated monthly; code wording from DLA's code table (P_HELP).
Major organizational entity (MOE) rules
How each service or agency buys and manages this item
| Rule | MOE | AMC | AMSC | NIMSC | IMC | AAC | DSOR |
|---|---|---|---|---|---|---|---|
| FXGI | Air Force (DF) | 1Suitable for competition (second or later time) | BSource control drawing names the makers | Z | |||
| WG01 | United arab emirates (WG) | ||||||
| WP01 | Poland (WP) | ||||||
| YB01 | Spain (YB) | ||||||
| YC01 | Columbia (YC) | ||||||
| YJ01 | Singapore (YJ) | ||||||
| YW01 | Malaysia (YW) | ||||||
| ZH01 | Republic of korea (ZH) | ||||||
| ZJ01 | Japan (ZJ) | ||||||
| ZW01 | Turkey (ZW) | ||||||
| ZX01 | Nato maintenance and supply agency (ZX) |
Showing 1 to 10 of 11 results
Source: DLA's PUB LOG files (FLIS Data Electronic Reading Room), updated monthly; code wording from DLA's code table (P_HELP). AMC and AMSC wording: DFARS PGI 217.7506. Hover a code for DLA's wording.
Government organizations
The services and agencies that manage or use this item
| Organization | Effective date | Unit of issue | Unit price | Qty per unit | Controlled inventory | Shelf life | Acquisition advice | Source of supply |
|---|---|---|---|---|---|---|---|---|
| Air Force (DF) | 01-OCT-2026 | EA (Each) | $0.97 | 1 (1) | U (Unclassified) | No limit | Z (Insurance/numeric stockage objective) | SMS (Defense logistics agency) |
| DLA (DS) | 01-OCT-2026 | EA (Each) | $0.97 | 1 (1) | U (Unclassified) | No limit | Z (Insurance/numeric stockage objective) | SMS (Defense logistics agency) |
Source: DLA's PUB LOG files (FLIS Data Electronic Reading Room), updated monthly; code wording from DLA's code table (P_HELP). Unit prices are DLA's standard prices (its catalog price to its customers, with DLA's surcharge), not prices DLA paid.
Packaging
FLIS packaging data of this item
FLIS packaging
- Level A
- E (Requirements of ASTM-D4169)
- Level B
- Q (Table c.ii)
- Unit container
- 10 (Numeric)
Source: DLA's PUB LOG files (FLIS Data Electronic Reading Room), updated monthly; code wording from DLA's code table (P_HELP).
DIBBS RFQs
Recent DLA requests for quotation for this item on DIBBS, newest first: 1 open now
| Solicitation | NSN | Item name | Qty | Unit | Std. price | Last price | Est. value | Set-aside | Tech docs | Posted | Return by |
|---|---|---|---|---|---|---|---|---|---|---|---|
| SPE8E827T0561DIBBS only | 4520-01-328-7252 | Igniter,spark,fuel | 7 | EA | $0.97 per EA | … | … | No set-aside | Yes | November 11, 2026 | November 23, 20269 days left |
| SPE8E826T3919DIBBS only | 4520-01-328-7252 | Igniter,spark,fuel | 7 | EA | $0.97 per EA | … | … | No set-aside | November 3, 2026First seen | June 8, 2026Closed |
→ These RFQs in the DIBBS list
“First seen”: an RFQ from DIBBS's file of all open RFQs, which gives no issue date. Source: the request-for-quotation (RFQ) files DLA publishes on DIBBS each day. An RFQ that is also a SAM.gov notice links to that notice. Return-by dates are DIBBS's.
DLA forecast
DLA's purchase forecast for the next 24 months, and its lead time
DLA's own figures
- Lead time
- administrative 104 days, production 134 days (238 in all)
Source: DLA's monthly files in its FOIA reading room: the 24-month demand forecast (what DLA expects to buy, not a commitment) and the ALT/PLT file (administrative lead time: requirement to award; production lead time: award to delivery).