GovChime

4710-01-419-1874 Tube,metallic

One item DLA buys: its open requests for quotation, approved sources and past DLA awards.

Overview

National Stock Number record

Open RFQs
1
Next due November 16, 2026
Last price paid
…
Standard price
$15.38 per EA
DLA's catalog price, not a price paid
Approved sources
1
One approved manufacturer listed
Awards on record
0
DLA demand
–

Identification

Item name
Tube,metallic
End product
Radar; next generation radar (NEXRAD)
NSG (group)
47 · Pipe, tubing, hose, and fittings
NIIN assigned
15-SEP-95
Unit
EA (Each)
NSN
4710-01-419-1874
NIIN
01-419-1874

Name, end product, NIIN date and unit: DLA's Federal Logistics Information System (PUB LOG). Source: the request-for-quotation (RFQ) files DLA publishes on DIBBS each day. An RFQ that is also a SAM.gov notice links to that notice. Return-by dates are DIBBS's.

Approved suppliers

Manufacturers and part numbers DLA has qualified for this item, and the part numbers in its catalog record

SupplierCAGECAGE statusPart status (RNCC / RNVC)Supplier part #Listed in
ELECTROMECHANICAL SYSTEMS INC.1M813A (Active)3 (Design control reference) / 2 (An item-identifying number)1025616DLA approved-source file
72081A (Active)5 (Secondary reference) / 9 (Was the design control reference)1/4 20 B&SFLIS part list
8N225A (Active)5 (Secondary reference) / 9 (Was the design control reference)1/4 20 B&SFLIS part list

Source: DLA's approved-source file published with the RFQs and the part list of DLA's catalog record (FLIS). CAGE and part status are FLIS's codes with DLA's wording.

Pricing and awardees

Characteristics

Government-defined characteristics of this item (FLIS)

Hazardous and environmental

Hazardous material (HMIC)
N (No data in hmirs)

Product characteristics

CodeRequirementDescription
AAGRCross-sectional shape style–
MATTMaterialCOPPER ALLOY
FEATSpecial features2 1/2 FOOT PIECE; FITS ON GEARBOX ASSEMBLIES; 40505-1201-101 AND 405051202-102

Additional identifiers

II
0
DEMIL
A: No demilitarization required
Precious metals (PMIC)
A (Does not contain precious metal)
PINC
0031979
Criticality (CRIT CD)
X
On FedMall
Yes

Source: DLA's PUB LOG files (FLIS Data Electronic Reading Room), updated monthly; code wording from DLA's code table (P_HELP).

Major organizational entity (MOE) rules

How each service or agency buys and manages this item

RuleMOEAMCAMSCNIMSCIMCAACDSOR
FXGCAir Force (DF)3From the actual manufacturer (second or later time)DTechnical data not availableZ
RGX1National weather service (RA)3From the actual manufacturer (second or later time)DTechnical data not available

Source: DLA's PUB LOG files (FLIS Data Electronic Reading Room), updated monthly; code wording from DLA's code table (P_HELP). AMC and AMSC wording: DFARS PGI 217.7506. Hover a code for DLA's wording.

Government organizations

The services and agencies that manage or use this item

OrganizationEffective dateUnit of issueUnit priceQty per unitControlled inventoryShelf lifeAcquisition adviceSource of supply
Air Force (DF)01-OCT-2026EA (Each)$15.381 (1)U (Unclassified)No limitJ (Not stocked)SMS (Defense logistics agency)
DLA (DS)01-OCT-2026EA (Each)$15.381 (1)U (Unclassified)No limitJ (Not stocked)SMS (Defense logistics agency)

Source: DLA's PUB LOG files (FLIS Data Electronic Reading Room), updated monthly; code wording from DLA's code table (P_HELP). Unit prices are DLA's standard prices (its catalog price to its customers, with DLA's surcharge), not prices DLA paid.

DIBBS RFQs

Recent DLA requests for quotation for this item on DIBBS, newest first: 1 open now

SolicitationNSNItem nameQtyUnitStd. priceLast priceEst. valueSet-asideTech docsPostedReturn by
SPE7M427T2392DIBBS only4710-01-419-1874Tube,metallic71EA$15.38 per EA……No set-asideYesNovember 5, 2026November 16, 20262 days left
SPE7M026T9546DIBBS only4710-01-419-1874Tube,metallic20EA$15.38 per EA……No set-asideNovember 3, 2026First seenJuly 2, 2026Closed

→ These RFQs in the DIBBS list

“First seen”: an RFQ from DIBBS's file of all open RFQs, which gives no issue date. Source: the request-for-quotation (RFQ) files DLA publishes on DIBBS each day. An RFQ that is also a SAM.gov notice links to that notice. Return-by dates are DIBBS's.

DLA forecast

DLA's purchase forecast for the next 24 months, and its lead time

DLA's own figures

Lead time
administrative 90 days, production 127 days (217 in all)

Source: DLA's monthly files in its FOIA reading room: the 24-month demand forecast (what DLA expects to buy, not a commitment) and the ALT/PLT file (administrative lead time: requirement to award; production lead time: award to delivery).

Winning bids