GovChime

5325-01-394-4489 Insert,screw thread

One item DLA buys: its open requests for quotation, approved sources and past DLA awards.

Overview

National Stock Number record

Open RFQs
1
Next due November 27, 2026
Last price paid
…
Standard price
$50.44 per EA
DLA's catalog price, not a price paid
Approved sources
1
One approved manufacturer listed
Awards on record
0
DLA demand
–

Identification

Item name
Insert,screw thread
NSG (group)
53 · Hardware and abrasives
NIIN assigned
09-AUG-94
Unit
EA (Each)
NSN
5325-01-394-4489
NIIN
01-394-4489

Name, end product, NIIN date and unit: DLA's Federal Logistics Information System (PUB LOG). Source: the request-for-quotation (RFQ) files DLA publishes on DIBBS each day. An RFQ that is also a SAM.gov notice links to that notice. Return-by dates are DIBBS's.

Approved suppliers

Manufacturers and part numbers DLA has qualified for this item, and the part numbers in its catalog record

SupplierCAGECAGE statusPart status (RNCC / RNVC)Supplier part #Listed in
HOWMET GLOBAL FASTENING SYSTEMS INC.293726499-344676-5DLA approved-source file
29373H (Obsolete entity has been discontinued)3 (Design control reference) / 9 (Was the design control reference)KNJ 11FLIS part list
3B150A (Active)5 (Secondary reference) / 9 (Was the design control reference)6499-344676-5FLIS part list
49956A (Active)5 (Secondary reference) / 9 (Was the design control reference)6499-344676-5FLIS part list
80070A (Active)5 (Secondary reference) / 9 (Was the design control reference)6499-344676-5FLIS part list
04614A (Active)7 (Vendor item drawing reference) / 2 (An item-identifying number)6499-344676-5FLIS part list

Source: DLA's approved-source file published with the RFQs and the part list of DLA's catalog record (FLIS). CAGE and part status are FLIS's codes with DLA's wording.

Pricing and awardees

Characteristics

Government-defined characteristics of this item (FLIS)

Hazardous and environmental

Hazardous material (HMIC)
N (No data in hmirs)

Additional identifiers

II
0
DEMIL
A: No demilitarization required
Precious metals (PMIC)
A (Does not contain precious metal)
Schedule B
9606100000
PINC
0011444
Criticality (CRIT CD)
X
On FedMall
Yes

Source: DLA's PUB LOG files (FLIS Data Electronic Reading Room), updated monthly; code wording from DLA's code table (P_HELP).

Major organizational entity (MOE) rules

How each service or agency buys and manages this item

RuleMOEAMCAMSCNIMSCIMCAACDSOR
FXGIAir Force (DF)0Never screened0Z

Source: DLA's PUB LOG files (FLIS Data Electronic Reading Room), updated monthly; code wording from DLA's code table (P_HELP). AMC and AMSC wording: DFARS PGI 217.7506. Hover a code for DLA's wording.

Government organizations

The services and agencies that manage or use this item

OrganizationEffective dateUnit of issueUnit priceQty per unitControlled inventoryShelf lifeAcquisition adviceSource of supply
Air Force (DF)01-OCT-2026EA (Each)$50.440 (No qup)U (Unclassified)No limitJ (Not stocked)SMS (Defense logistics agency)
DLA (DS)01-OCT-2026EA (Each)$50.440 (No qup)U (Unclassified)No limitJ (Not stocked)SMS (Defense logistics agency)

Source: DLA's PUB LOG files (FLIS Data Electronic Reading Room), updated monthly; code wording from DLA's code table (P_HELP). Unit prices are DLA's standard prices (its catalog price to its customers, with DLA's surcharge), not prices DLA paid.

DIBBS RFQs

Recent DLA requests for quotation for this item on DIBBS, newest first: 1 open now

SolicitationNSNItem nameQtyUnitStd. priceLast priceEst. valueSet-asideTech docsPostedReturn by
SPE4A027T0686DIBBS only5325-01-394-4489Insert,screw thread1EA$50.44 per EA……No set-asideNoNovember 18, 2026November 27, 20267 days left

→ These RFQs in the DIBBS list

Source: the request-for-quotation (RFQ) files DLA publishes on DIBBS each day. An RFQ that is also a SAM.gov notice links to that notice. Return-by dates are DIBBS's.

DLA forecast

DLA's purchase forecast for the next 24 months, and its lead time

DLA's own figures

Lead time
administrative 124 days, production 189 days (313 in all)

Source: DLA's monthly files in its FOIA reading room: the 24-month demand forecast (what DLA expects to buy, not a commitment) and the ALT/PLT file (administrative lead time: requirement to award; production lead time: award to delivery).

Winning bids