3 Phase Power Supply Test System
Archived on May 30, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 9:00 PM EDT
- Posted
- May 13, 2026
- Notice type
- Sources Sought
- Set-aside
- No Set aside used
- NAICS
- 334516: Analytical Laboratory Instrument Manufacturing
- Agency
- Department of WarDEFENSE LOGISTICS AGENCY
Notice details
- Office
- DCSO.DCSO ENERGY.DCSO-COLUMBUS-DIVISION-2
- Place of performance
- Columbus, Ohio, 43213
- PSC
- 6640: LABORATORY EQUIPMENT AND SUPPLIES
- Last updated
- Oct 30, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- SP4706-26-Q-00XX
- Notice ID
- 0235a2d7fa2247c89934e54ddfeeeacc
Description
The contractor shall provide all labor, materials, tools, transportation, supplies, supervision, etc. (except as noted), necessary to provide all components for a 18kVA 3Φ Power Supply Test System and 1kVA 3Φ Power Supply Test System to the Defense Supply Center Columbus (DSCC), Columbus, Ohio. The salient characteristics of the 3Φ Power Supply Test Systems are as listed below:
A. DC, 1Φ and 3Φ power system with support equipment with the following salient characteristics:
1.Shall be new, not refurbished.
2.Shall be supplied with Operating manual.
3.First system shall be capable of supplying: DC, 1Φ and 3Φ power from DC to 5kHz (sinusoidal, square wave, and arbitrary waveform) rated to 18kVA
4.Second system shall be capable of supplying: DC, 1Φ and 3Φ power from DC to 5kHz (sinusoidal, square wave, and arbitrary waveform) rated to 1kVA
5.Shall have accuracy of at least 0.15%.
6.Shall have no more than 0.3% distortion at 50/60Hz and no more than 1% distortion above these frequencies.
7.Shall have no less than 0.98 power factor.
8.Shall have resolution of no less than 0.1V.
9.Optional extended warranty and multi-year service contract must be offered.
10.Shall have: NIST Traceable Calibration Certificate and ISO 17025 accredited calibration certificate with data and uncertainties.
11.Shall include all the cables, sub-equipment and accessories for the system to reliably operate.
12.Shall be on a wheeled frame for easy movement.
13.Shall be able to fit through standard commercial double door (approximately 83”H x 70”W).
14.First system shall work as a single system to only require one 480V/3φ delta hard-wired disconnect for the entire system. Seconds system shall work as a single system to only require standard 120V/1φ 20A outlet.
B. Required Upgrades and Accessories - Brand Name or Equal:
1.GPIB, ethernet, USB Interfaces.
2.2 Windows 11 PCs with all necessary peripherals, hardware, ports, et cetera with software and permanent license to reliably control system.
3.8 hours of on-site training and setup.
C. Place of Performance
The instrument shall be delivered to:
Defense Supply Center Columbus
300 North James Road, Bldg 17-3
Mark for: DLA Product Test Center, Bldg 11-7 (TE Lab)
Columbus, Ohio 43213
Other Requirements:
1.Delivery: 30 days from date of the award.
2.Contractor shall give notification when the instrument is ready to be delivered.
3.All shipping costs are to be included in the contracted price.
Award Overview
Contacts
Contracting Officer
Primary Contact
Documents
No documents available.
Lifecycle
- 1Version 1Sources SoughtArchived
3 Phase Power Supply Test System
- 4Version 4Sources SoughtArchivedCurrent
3 Phase Power Supply Test System
- 6Version 6Combined Synopsis/SolicitationArchived
Type changed from Sources Sought to Combined Synopsis/Solicitation
3 Phase Power Supply Test System
Similar Opportunities
Additional Details
Solicitation Number
SP4706-26-Q-00XX
Archive Date
May 30, 2026
Office Address
COLUMBUS, OH, 43218