GovChime
Notice ID: 06181b0e6cbc47e2bc9231d2c3d01c25Combined Synopsis/Solicitation

Climate Controlled Storage Buildings

Responses closed . Full description on SAM.gov.

Overview

Response deadline
2:00 PM CDT
Posted
July 27, 2026
Notice type
Combined Synopsis/Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
332311: Prefabricated Metal Building and Component Manufacturing
Agency
Department of WarDepartment of the Army

Notice details

Office
AMC.ACC.MISSION INSTALLATION CONTRACTING COMMAND.419TH CSB.W6QM MICC-FT DRUM
Place of performance
Fort Campbell Kentucky, 42223
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
W911S226U3832
Notice ID
06181b0e6cbc47e2bc9231d2c3d01c25

Description

Environmental Storage Buildings

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Documents

Lifecycle

  1. 1
    Version 1Combined Synopsis/SolicitationCurrent

    Climate Controlled Storage Buildings

    Notice 06181b0e6cbc47e2bc9231d2c3d01c25 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Climate Controlled Storage Building
-Combined Synopsis09/02/2026
Climate Controlled Storage Building
-Combined Synopsis09/02/2026
Hazmat lockers
-Combined Synopsis09/01/2026
The chemical storage building must meet several specifications for construction, safety, and utility. The required minimum dimensions are 42 feet in length, 8 feet in width, and 8 feet 3 inches in height. Access shall be provided by a 60-inch by 80-inch set of double doors, with at least one 36-inch active leaf, centered on one of the 42-foot walls and secured with a padlock-compatible handle. For spill containment, the building must include a sump with a minimum capacity of 1200 gallons.The structure must feature a robust fire-rated design, with walls tested by Intertek for a minimum 4-hour rating and a roof tested for a minimum 3-hour rating. Electrical specifications include a 12-space, 100-amp NEMA 3R main breaker panel (120V/240V), two Class 1, Division 2 explosion-proof LED light fixtures with a switch for the interior, and a dust/vapor-resistant exterior light with a photocell installed outside the hazard zone. Ventilation will be handled by an explosion-proof exhaust system rated for 335 CFM or higher, suitable for petroleum-based storage and compliant with all NFPA/UFC codes, complete with an indicator light and an emergency shut-off switch.For safety and functionality, the building shall be equipped with a grounding kit including an 8-foot ground rod, 10 feet of cable, and a clamp. The interior will be furnished with three-tier, 5-foot-long shelves that are 14 inches deep with a 2-inch lip. A non-perforated, skid-resistant steel ramp, measuring at least 52 inches wide by 72 inches long, must be included. Additionally, the unit shall come with three 10-pound ABC dry chemical fire extinguishers: two installed inside on either side of the door, and one mounted outside in a weatherproof cabinet. The completed chemical storage building is to be delivered to Building P-91, Railroad Street, Fort Drum, NY 13602.
-Combined Synopsis08/27/2026
Contractor shall supply and deliver within 12 weeks, a complete ready-to-assemble, heavy-duty commercial-grade galvanized steel carport kit measuring 16 feet to18 feet in width by 35 feet to 38 feet in length, 8 feet legs with a maximum height of 10 feet at the roof peak. This is a materials only procurement; the vendor is responsible for delivery of all components but shall not perform any on-site assembly or installation. The structural framing kit must feature a minimum of 14 gauge galvanized steel tubing to ensure industrial grade strength and comprehensive corrosion resistance. The roofing material package must utilize an A frame vertical panel configuration composed of a minimum 29 gauge steel panels with a weather-resistant finish; horizontal roof systems are not acceptable due to drainage requirements over the 36-foot span. All supplied components, when assembled according to the manufacturers instructions, must meet certified engineering ratings capable of resisting wind speeds of at least 130 MPH and a minimum snow load capacity of 30 PSF. Additionally, the vendor shall supply a complete, heavy-duty anchoring kit engineered specifically for the target installation surface (concrete, asphalt, or ground) along with all necessary assembly hardware and detailed, step by step installation instructions. All materials and structural components must strictly comply with ASTM standards for cold-formed steel structural members. Spec Sheet with picture of product required in offer. Buy American Form Required.
-Combined Synopsis08/26/2026

Additional Details

Solicitation Number

W911S226U3832

Archive Date

Jul 27, 2027

Office Address

FORT DRUM, NY, 13602-5220