Notice ID: 06181b0e6cbc47e2bc9231d2c3d01c25Combined Synopsis/Solicitation
Climate Controlled Storage Buildings
Responses closed . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM CDT
- Posted
- July 27, 2026
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 332311: Prefabricated Metal Building and Component Manufacturing
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- AMC.ACC.MISSION INSTALLATION CONTRACTING COMMAND.419TH CSB.W6QM MICC-FT DRUM
- Place of performance
- Fort Campbell Kentucky, 42223
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- W911S226U3832
- Notice ID
- 06181b0e6cbc47e2bc9231d2c3d01c25
Description
Environmental Storage Buildings
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Documents
Links (4)
- PIEE Solicitation Module Link for W911S226U3832piee.eb.milPosted
- Web Based Training for the PIEE Solicitation Modulepieetraining.eb.milPosted
- Registration Instructions for the PIEE Solicitation Modulewww.acq.osd.milPosted
- Department of Defense Procurement Toolboxdodprocurementtoolbox.comPosted
Lifecycle
- 1Version 1Combined Synopsis/SolicitationCurrent
Climate Controlled Storage Buildings
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Climate Controlled Storage Building | - | Combined Synopsis | 09/02/2026 |
Climate Controlled Storage Building | - | Combined Synopsis | 09/02/2026 |
Hazmat lockers | - | Combined Synopsis | 09/01/2026 |
The chemical storage building must meet several specifications for construction, safety, and utility. The required minimum dimensions are 42 feet in length, 8 feet in width, and 8 feet 3 inches in height. Access shall be provided by a 60-inch by 80-inch set of double doors, with at least one 36-inch active leaf, centered on one of the 42-foot walls and secured with a padlock-compatible handle. For spill containment, the building must include a sump with a minimum capacity of 1200 gallons.The structure must feature a robust fire-rated design, with walls tested by Intertek for a minimum 4-hour rating and a roof tested for a minimum 3-hour rating. Electrical specifications include a 12-space, 100-amp NEMA 3R main breaker panel (120V/240V), two Class 1, Division 2 explosion-proof LED light fixtures with a switch for the interior, and a dust/vapor-resistant exterior light with a photocell installed outside the hazard zone. Ventilation will be handled by an explosion-proof exhaust system rated for 335 CFM or higher, suitable for petroleum-based storage and compliant with all NFPA/UFC codes, complete with an indicator light and an emergency shut-off switch.For safety and functionality, the building shall be equipped with a grounding kit including an 8-foot ground rod, 10 feet of cable, and a clamp. The interior will be furnished with three-tier, 5-foot-long shelves that are 14 inches deep with a 2-inch lip. A non-perforated, skid-resistant steel ramp, measuring at least 52 inches wide by 72 inches long, must be included. Additionally, the unit shall come with three 10-pound ABC dry chemical fire extinguishers: two installed inside on either side of the door, and one mounted outside in a weatherproof cabinet. The completed chemical storage building is to be delivered to Building P-91, Railroad Street, Fort Drum, NY 13602. | - | Combined Synopsis | 08/27/2026 |
Contractor shall supply and deliver within 12 weeks, a complete ready-to-assemble, heavy-duty commercial-grade galvanized steel carport kit measuring 16 feet to18 feet in width by 35 feet to 38 feet in length, 8 feet legs with a maximum height of 10 feet at the roof peak. This is a materials only procurement; the vendor is responsible for delivery of all components but shall not perform any on-site assembly or installation. The structural framing kit must feature a minimum of 14 gauge galvanized steel tubing to ensure industrial grade strength and comprehensive corrosion resistance. The roofing material package must utilize an A frame vertical panel configuration composed of a minimum 29 gauge steel panels with a weather-resistant finish; horizontal roof systems are not acceptable due to drainage requirements over the 36-foot span. All supplied components, when assembled according to the manufacturers instructions, must meet certified engineering ratings capable of resisting wind speeds of at least 130 MPH and a minimum snow load capacity of 30 PSF. Additionally, the vendor shall supply a complete, heavy-duty anchoring kit engineered specifically for the target installation surface (concrete, asphalt, or ground) along with all necessary assembly hardware and detailed, step by step installation instructions. All materials and structural components must strictly comply with ASTM standards for cold-formed steel structural members. Spec Sheet with picture of product required in offer. Buy American Form Required. | - | Combined Synopsis | 08/26/2026 |
Additional Details
Solicitation Number
W911S226U3832
Archive Date
Jul 27, 2027
Office Address
FORT DRUM, NY, 13602-5220