Rosebud Lift Station Construction
Active, responses due . Full description on SAM.gov.
Overview
- Response deadline
- 5:00 PM EST
- Posted
- October 27, 2026
- Notice type
- Solicitation
- NAICS
- 237110: Water and Sewer Line and Related Structures Construction
- Agency
- Department of Health and Human ServicesINDIAN HEALTH SERVICE
Notice details
- Office
- DIV OF ENGINEERING SVCS - SEATTLE
- Place of performance
- Rosebud, South Dakota, 57570
- PSC
- Y1ND: CONSTRUCTION OF SEWAGE AND WASTE FACILITIES
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 75H70127R00007
- Notice ID
- 0645772ebbb24543b13eda13b37c9c20
Description
The existing lift station has been in place since the early 1990s. Since its creation the hospital anticipates increased expansion in the emergency department, added on Tribal programs (dialysis, detox, Tribal Health Administration Building), added on 19 more quarters units, and is anticipating adding an additional 23 quarters units. The existing pumps are facing replacement every 1-2 years due to the unanticipated growth, but due to the growth we need to consider increasing the capacity of the wet well. In addition to switching from standard submersible pumps to chopper pumps to accommodate the random objects that get flushed into the system. In July both pumps ended up failing and they had to not only replace the pumps but pay for sewage disposal to circumvent overflow.
A separate project is in the works to begin remediating/replacing damaged sewer mains due to inflow and infiltration.
This construction solicitation will require the full removal and replacement of the lift station for the Rosebud complex. The existing lift station provides wastewater service to the hospital quarters units, and several tribal program buildings. Once installation is complete the new lift station will take the full sanitary load for the area currently being serviced by the existing lift station and be sized to handle expansion in the future. Then the existing lift station consisting of the wet well, dry well, pumps and piping will be demolished. The new lift station will consist of a wet well, a dry well, installation of chopper pumps, and force main connection. This project will also include a new control system to allow the facility to monitor flow into the lift station and the status of the equipment.
Brand Names: Where brand names are referenced, they establish a standard of quality and performance. Offerors may propose equal products that meet or exceed the specified functional and performance requirements. The Government will evaluate equality based on technical compatibility, performance, and integration with the system.
Award Overview
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (15)
- Download
J07 Rosebud Comprehensive Health Care Facility Site Development - Utilities.pdf
22 MBAdded in Solicitation version 1Posted - Download
J06 Tribal Programs Sewer Branch.pdf
7.1 MBAdded in Solicitation version 1Posted - Download
J02 Plans RLSC.pdf
6.0 MBAdded in Solicitation version 1Posted - Download
J03 Tech Specs RLSC.pdf
3.3 MBAdded in Solicitation version 1Posted - Download
J04 RB Geotech Report from 300 feet away.pdf
1.0 MBAdded in Solicitation version 1Posted - Download
Optional Company Specialized Experience Form.pdf
574 KBAdded in Solicitation version 1Posted - Download
J05 Existing-Proposed Lift Station Site Compared to the Former Solar Array.pdf
343 KBAdded in Solicitation version 1Posted - Download
J11 WH-347 Payrolls Exp 31Jan2028.pdf
298 KBAdded in Solicitation version 1Posted - Download
B01 RFP Rosebud Lift Station Construction 75H70127R00007.pdf
731 KBAdded in Solicitation version 1Posted - Download
J01 SOW Rosebud Lift Station Construction.docx
34 KBAdded in Solicitation version 1Posted - Download
Optional Past Performance Questionnaire.docx
30 KBAdded in Solicitation version 1Posted - Download
J09 Self Performed Calculation Sheet.docx
28 KBAdded in Solicitation version 1Posted - Download
J10 Wage Det SD20260018 18May2026.pdf
62 KBAdded in Solicitation version 1Posted - Download
J12 Release of Claims.docx
14 KBAdded in Solicitation version 1Posted - Download
J08 Block 17 Support Schedule RLSC.docx
30 KBAdded in Solicitation version 1Posted
Lifecycle
- 1Version 1SolicitationCurrent
Rosebud Lift Station Construction
Similar Opportunities
- Nemo Domestic Well Northern Hills Ranger District, Black Hills NF, South Dakota
Department of Agriculture · Posted 10/29/2026
- Jennifer Brown (COW)
Department of Health and Human Services · Posted 11/04/2026
- Nambe Wastewater Treatment Improvements Lagoon #4 Nambe
Department of Health and Human Services · Posted 10/29/2026
- Kelly Pierson OSS
Department of Health and Human Services · Posted 10/29/2026
- Jennifer Brown (COW)
Department of Health and Human Services · Posted 10/22/2026
Additional Details
Solicitation Number
75H70127R00007
Archive Date
Mar 31, 2027
Office Address
SEATTLE, WA, 98121