Notice ID: 08f21908c3ff454082b9a5faa76542e6Presolicitation
Hybrid vessel Charging System Project at Caven Point Marine Terminal
Archived on September 6, 2024. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM UTC−04:00
- Posted
- August 7, 2024
- Notice type
- Presolicitation
- NAICS
- 713930: Marinas
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- W2SD ENDIST NEW YORK
- Place of performance
- Jersey City, 07305
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- W912DS24S0055
- Notice ID
- 08f21908c3ff454082b9a5faa76542e6
Description
The work that will be performed under this contract will includes demolition of existing timber fender piles, timber rub rail, and removal of existing pavement and trench drain for the installation of seven (7) new mooring dolphins. Each mooring dolphin is comprised of six tubular steel casing pipe piles (micropiles) connected to a reinforced concrete cap. Each mooring dolphin micropile is socketed to rock using a threaded bar anchoring system. Each mooring dolphin is furnished with a new steel bollard for mooring and tubular steel rub rail connected to the existing concrete cap beam using post installed epoxy anchors. The new fender system is comprised of foam-filled camels braced against vertical steel pipe piles that are connected to molded rubber cone fenders with a fabricated steel guide pile sleeve assembly. Work also includes installation of new utility service and powering of project equipment. This work will consist of the construction and installation of a new shore power station capable of delivering 480VAC 3 phase power at 550 amps to the DCV DRIFTMASTER II to recharge the vessels batteries.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Michael McCue
Documents
No documents available.
Lifecycle
Solicitation:
W912DS24S0055- Market Research
- Pre-Solicitation
Formal solicitation typically follows within 30–60 days. (estimate)
- 2×Market ResearchJul 1, 2024
Hybrid vessel Charging System Project at Caven Point Marine Terminal
- Pre-SolicitationCurrentAug 7, 2024
Hybrid vessel Charging System Project at Caven Point Marine Terminal
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
W912DS24S0055
Archive Date
Sep 6, 2024
Office Address
NEW YORK, NY, 10278-0004