Notice ID: b57ca7b742410efd46c5baf38aa1267bSolicitation
F--Disposal, Removal, Inspection, Approval and Reporting of Asbestos Containing Building Materials from Buuilding(s) located within the reservoir of the Ridges Basin Dam, Durango, Colorado.
Archived on November 7, 2008. Full description on SAM.gov.
Overview
- Posted
- November 8, 2007
- Notice type
- Solicitation
- Set-aside
- Small Business Set Aside - Total
- Agency
- Department of the InteriorBUREAU OF RECLAMATION
Notice details
- Office
- DENVER FED CENTER
- Place of performance
- Approx 10 miles from Durango, Colorado - remote location. 813037987
- PSC
- F: NATURAL RESOURCES MANAGEMENT
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- 08SQ4E0036
- Notice ID
- b57ca7b742410efd46c5baf38aa1267b
Description
The Four Corners Construction Office of the Bureau of Reclamation is scheduling demolition and removal of all structures within the Ridges Basin as part of the final completion contract for the Ridges Basin Dam and Reservoir. Asbestos removal from identified structures must take place prior to demolition. Results of the survey provided in a report dated October 1, 2007 from Plateau Inc. indicate that friable asbestos in quantities exceeding the State trigger level, and requiring removal were found in only one structure - the Bodo Farm House. Within the Bodo Farm House - five asbestos containing building materials were identified as: 1) Multi-colored linoleum, bathtub surround vertical surfaces - approx 50 sq ft. 2) Tan linoleum, bathtub surround horizontal surfaces, approx. 16 sq ft, 3) Gray transite located on the interior walls and ceiling of the foyer and laundry rooms, approx. 1,660 sq ft., 4) White caulk with green paint (window glazing), approx 525 sq ft, and 5) White/gray transite with green paint, exterior siding, approx 1,703 sq. ft. All five ACBMs will be required to be removed as part of this contract by a contractor certified by the State of Colorado under Sec. 8 regulations- subject of the scope of work. Following removal of ACBMs, air quality monitoring of the Bodo Farmhouse will be conducted by an independent air quality monitoring firm, also qualified under the State regulations and then following the air quality monitoring approval, the structure must be revisited by Plateau Inc. for final survey and approval for demolition. Final site visitation and approval shall be included in the scope of work. Contract will require disposal, removal, inspection, approval and reporting- for information and/or statement of work contact: Jere Ellenberger at 505-324-5047.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Jere Ellenberger 5053245047 jellenberger@uc.usbr.gov; Point of Contact above, or if none listed, contact the IDEAS EC HELP DESK for assistance
Documents
No documents available.
Lifecycle
Solicitation:
08SQ4E0036- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- Pre-SolicitationNov 8, 2007
F--Disposal, Removal, Inspection, Approval and Reporting of Asbestos Containing Building Materials from Buuilding(s) located within the reservoir of the Ridges Basin Dam, Durango, Colorado.
- SolicitationCurrentNov 8, 2007
F--Disposal, Removal, Inspection, Approval and Reporting of Asbestos Containing Building Materials from Buuilding(s) located within the reservoir of the Ridges Basin Dam, Durango, Colorado.
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
08SQ4E0036
Archive Date
Nov 7, 2008
Office Address
DENVER, CO, 80225