GovChime
Notice ID: 5eff2be9fcd191cbb20cf20df870d40aSolicitation

Y--Job consists of repairing coating damage on discharge manifold at Gallegos Pumping Plant - Navajo Indian Irrigation Project on the Navajo Reservation - located 20 miles south of Farmington, New Mexico -county of San Juan.

Archived on November 26, 2008. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
12:00 AM UTC−05:00
Posted
November 29, 2007
Notice type
Solicitation
Agency
Department of the InteriorBUREAU OF RECLAMATION

Notice details

Office
DENVER FED CENTER
Place of performance
Gallegos Pumping Plant - location: Navajo Reservation, 20 miles south of Farmington, New Mexico 874018110
PSC
Y: CONSTRUCT OF STRUCTURES/FACILITIES
Last updated
Sep 25, 2026

Identifiers

Solicitation number
08SQ4E0041
Notice ID
5eff2be9fcd191cbb20cf20df870d40a

Description

Job consists of repairing coating damage on discharge manifold at Gallegos Pumping Plant - Navajo Indian Irrigation Project on the Navajo Reservation - located 20 miles south of Farmington, New Mexico -county of San Juan. Specifications: Sandblasting the 120-inch steel pipe to bare metal and recoating the steel pipe with a coal tar epoxy type coating. The contractor shall provide all equipment, materials and labor to complete the work. The contractor is responsible for maintaining temperature requirements for the application and curing of the coating and for maintaining the humidity levels required in this specification. Contractor is also responsible for maintaining the ventilation in the manifold and dust control in the pumping plant. Work in the manifold can commence on January 1, 2008 and must be complete by February 15, 2008. Other contrct work will be occuring at the same time; therefore, coordination with the COR will be required. Technical questions: Emma Manzanares 505-324-5017 or e-mail emanzanares@uc.usbr.gov

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Jere Ellenberger 5053245047 jellenberger@uc.usbr.gov; Point of Contact above, or if none listed, contact the IDEAS EC HELP DESK for assistance

Documents

No documents available.

Lifecycle

Solicitation:08SQ4E0041
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationNov 27, 2007

    Y--Job consists of repairing coating damage on discharge manifold at Gallegos Pumping Plant - Navajo Indian Irrigation Project on the Navajo Reservation - located 20 miles south of Farmington, New Mexico -county of San Juan.

    Notice 0ce2369e62775f48b8748603a444a3fa on SAM.gov

  2. SolicitationCurrentNov 29, 2007

    Y--Job consists of repairing coating damage on discharge manifold at Gallegos Pumping Plant - Navajo Indian Irrigation Project on the Navajo Reservation - located 20 miles south of Farmington, New Mexico -county of San Juan.

    Notice 5eff2be9fcd191cbb20cf20df870d40a on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
NERI 326119 CMR Remove Historic Structures, New River Gorge National Park and Preserve, West Virginia
-AwardedOpen
EO 14398 - NEW REQ GOVERNOR PUMP & MOTOR IDIQ TO3
-AwardedOpen
GRCA 257282 - Replace Wastewater Plant at South Rim Village
-Solicitation12/18/2026
JEFF Cooling Tower Replacement Title III
-AwardedOpen
Timucuan Ecological and Historic Preserve TIMU-335507 Stabilize Kingsley Plantation Shoreline with Seawall Extension
-Solicitation11/13/2026

Additional Details

Solicitation Number

08SQ4E0041

Archive Date

Nov 26, 2008

Office Address

DENVER, CO, 80225