GovChime
Notice ID: 0a8a7c397d694636a7167ae73c18c7ddSolicitationArchived

Remanufacture of TF-33 Low and High-Speed Compressor Stators - MAC IDIQ

Archived on May 16, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
6:00 PM CDT
Posted
April 2, 2026
Notice type
Solicitation
Set-aside
No Set aside used
Agency
Department of WarDepartment of the Air Force

Notice details

Office
AIR FORCE MATERIEL COMMAND.AIR FORCE SUSTAINMENT CENTER.FA8121 AFSC PZAAA
Place of performance
S Coffeyville, Oklahoma, 73145
Last updated
Nov 1, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
FA812126R0004
Notice ID
0a8a7c397d694636a7167ae73c18c7dd

Description

The Air Force Sustainment Center (AFSC) is contemplating to procure the remanufacture of the TF33 Stators and Shrouds cited above for a 5-year Firm-Fixed Price (FFP) Indefinite Delivery/Indefinite Quantity (IDIQ) Multiple Award Contract (MAC) with 2 Year Basic with 3 One Year Options. 

Qualification Requirements: Sources must be qualified prior to being considered for award. To be eligible for contract award, the offeror must be an approved source IAW RFO 52.209-1, Qualification Requirements. The Government is not required to delay contract award to review pending Source Approval Requests (SARs). Therefore, offerors are encouraged to submit SARs as soon as possible. If the Government has not completed review of a SAR when the contract is awarded, the SAR will be retained, and the source will be reviewed as a possible source for future awards.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Secondary Contact

Documents

Files (23)

  • FA812126R0004.pdf

    258 KBAdded in Solicitation version 6Posted
    Download
  • FA812126R0004_Clauses.pdf

    88 KBAdded in Solicitation version 6Posted
    Download
  • Ordering_Procedures.pdf

    384 KBAdded in Solicitation version 6Posted
    Download
  • 4223003_PKGRQMT_REPORT.pdf

    80 KBAdded in Solicitation version 6Posted
    Download
  • 4222577_TRNSPDATA_REPORT.pdf

    97 KBAdded in Solicitation version 6Posted
    Download
  • SOW_Rev_0.pdf

    423 KBAdded in Solicitation version 6Posted
    Download
  • RQR_CSI.pdf

    1.3 MBAdded in Solicitation version 6Posted
    Download
  • DiD_Report_Shipping_Packaging_Descrepancy.pdf

    282 KBAdded in Solicitation version 6Posted
    Download
  • DiD_SCRM_Plan.pdf

    175 KBAdded in Solicitation version 6Posted
    Download
  • DiD_ASDP_DR.pdf

    174 KBAdded in Solicitation version 6Posted
    Download
  • DiD_Production_Surge_Plan.pdf

    157 KBAdded in Solicitation version 6Posted
    Download
  • DiD_GP_Inventory_Report.pdf

    146 KBAdded in Solicitation version 6Posted
    Download
  • SPI_1345.pdf

    210 KBAdded in Solicitation version 6Posted
    Download
  • DiD_CDM_Production_Report.pdf

    126 KBAdded in Solicitation version 6Posted
    Download
  • GFP_Attachment.pdf

    9.1 KBAdded in Solicitation version 6Posted
    Download
  • DID_GFM_by_NSN.pdf

    60 KBAdded in Solicitation version 6Posted
    Download
  • CDRLs_A001_A008.pdf

    134 KBAdded in Solicitation version 6Posted
    Download
  • SPI_1797.pdf

    83 KBAdded in Solicitation version 6Posted
    Download
  • DiD_CAV_Reporting.pdf

    23 KBAdded in Solicitation version 6Posted
    Download
  • SPI_1625.pdf

    66 KBAdded in Solicitation version 6Posted
    Download
  • SPI_1800.pdf

    59 KBAdded in Solicitation version 6Posted
    Download
  • SPI_8028.pdf

    56 KBAdded in Solicitation version 6Posted
    Download
  • Presolicitation - FD2030250415 01.pdf

    178 KBAdded in Presolicitation version 3Posted
    Download

Lifecycle

  1. 3
    Version 3PresolicitationArchived

    Remanufacture of TF-33 Vanes and Shrouds

    Notice 331575f0e8e3494999fb401337177d92 on SAM.gov

  2. 6
    Version 6SolicitationArchivedCurrent

    Type changed from Presolicitation to Solicitation

    Remanufacture of TF-33 Low and High-Speed Compressor Stators - MAC IDIQ

    Notice 0a8a7c397d694636a7167ae73c18c7dd on SAM.gov

  3. 9
    Version 9Award NoticeArchived

    Type changed from Solicitation to Award Notice

    Remanufacture of TF-33 Low and High-Speed Compressor Stators - MAC IDIQ

    Notice 93d2dad08ea54822a369b7e195c3b265 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Solicitation Amendment 03: The purpose of the amendment is to update CLIN 0011 (POST AWARD CONFERENCE) from NSP to FFP, establish it as the minimum order for the contract, and attach pricing matrix. Solicitation Amendment 02: The purpose of the amendment is to attach an updated Statement of Work (SOW) and update the CLIN structure for solicitation FA8122-26-R-0007. Solicitation Amendment 01: The purpose of the amendment is to correct National Stock Number (NSN) associated with LPT Stage I Blade subCLINs 0001AB – 4001AB (USAF) and 0002AB – 4002AB (Navy) and add Inspection/Acceptance and Quality Assurance information to subCLINs 0001AB – 4001AB (USAF). Solicitation Noun: F108 Module 13/15 & 14 LPT Assembly (USAF/USN) Remanufacture NSN: 2840-01-229-5786PN (13/15 USAF); 2840-01-484-3913PN (13/15 USN); 2840-01-189-2941PN (14 USAF); 2840-01-483-8785PN (14 USN) P/N: 305-482-301-0 (13/15 USAF); 305-482-301-0 (13/15 USN); 301-316-158- 0 (14 USAF); 301-316-158-0 (14 USN) This is a competitive acquisition to qualified sources. Please see attached. Mod 14 (USAF/USN): No. 4 Bearing is included in remanufacture. Two additional subCLINs have been added for Shaft and Stub Shaft replacement. Mod 13/15 (USAF/USN): SubCLIN has been added for Stage I Blades. 105 blades will be paid for each USAF module and 141 blades for each USN module.
79%
Solicitation09/15/2026
INTERESTED SOURCES MUST SELECT “ADD ME TO INTERESTED VENDORS” BUTTON ABOVE OR BELOW TO BE CONSIDERED PARTICIPANTS IN THIS MARKET RESEARCH EFFORT. THERE IS NO SOLICITATION AVAILABLE AT THIS TIME. REQUESTS FOR A SOLICITATION WILL NOT RECEIVE A RESPONSE. This Sources Sought Synopsis (SSS) is in support of Market Research being conducted by the United States Air Force to identify potential sources for the requirements identified below and to determine if this effort can be competitive or a Small Business Set-Aside. The Government may consider breaking the requirement out by airframe. This is not a Request for Proposal (or solicitation) or an indication that a contractual commitment will exist for this requirement. The government does not intend to award a contract on the basis of this market research. No funds are available to fund the information solicited. The Government will use the information gathered through publication of this SSS to determine the best acquisition strategy for this requirement. The Government is interested in all potential sources including Small Businesses, Small Disadvantaged Businesses, 8(a) businesses, Service-Disabled Veteran-Owned Small Businesses, HUBZone Small Businesses, Women-Owned Small Businesses, etc. The Supply Chain Management Squadron located at Tinker Air Force Base is requesting information, pursuant to FAR PART 10, in support of Market Research to identify potential sources for the of the NSN(s) listed below.
78%
Market Research03/08/2024
The US Air Force Life Cycle Management Center (AFLCMC) F100 Program intends to issue a sole source “C”-type contract (named F100 Engine Exchange) to Pratt & Whitney (P&W), a Division of RTX Corporation for a “no-cost” exchange of property whereby the Government will deliver 51 F100-PW-220 engines to the Contractor, in exchange for the Contractor delivering 13 F100-229 new engine augmentor modules to the Government. A Sources Sought Synopsis (SSS) FA8124-RFI-AUG-2026 was posted from 4 August 2026 through 3 September 2026. Results from the SSS did not indicate any source other than P&W could perform the work under this contract at the prime level without the government incurring unacceptable delays and substantial duplication of costs not recoverable through competition. The government is awarding this contract under the authority of RFO 6.103-1,"Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements." A Justification and Approval (J&A) for using Other Than Full and Open Competition was approved on 23 October 2026. All responsible sources may submit a capability statement to the Contracting Officer by the date listed in this notice to be considered by the agency. Respondents shall specify status as a large business, small business, small disadvantaged business, 8(a) concern, women-owned small business, economically disadvantaged women-owned small business, HUBZone small business, veteran-owned small business, or service-disabled veteran-owned small business. This synopsis does not constitute an Invitation for Bids (IFB) or a Request for Proposals (RFP), nor does it restrict the Government to an ultimate acquisition approach. The government will not reimburse any costs associated with preparing or submitting a response to this notice. Due to security access requirements, foreign participation is not permitted at the prime contractor level. Contracting Activity: AFLCMC/LPK, 3001 Staff Dr, Tinker AFB, OK 73145.
72%
Pre-Solicitation11/17/2026
Potential sources shall be capable of furnishing all labor, materials, facilities and equipment required to accomplish the new manufacture of the item(s) listed below. Generally, this entails the procurement/manufacture of component parts, inspection, testing, preservation/packaging, and shipping. Additionally, potential sources may be responsible for supply chain management, logistics planning, forecasting production requirements, longlead time parts procurement, diminishing manufacturing sources and material shortage issues, and shipping serviceable assets. The unit prices will be established at the time of a contract award for the item(s) listed below. Potential sources may be responsible for nonrecurring engineering costs associated with becoming an approved source. The spares requirement for this effort is identified below: Part Number: 2840 NSN: 2840-01-625-7346NZ Estimated Spares Requirement (QTY): 6
72%
Market Research01/20/2026
Potential sources shall be capable of furnishing all labor, materials, facilities and equipment required to accomplish the new manufacture of the item(s) listed below. Generally, this entails the procurement/manufacture of component parts, inspection, testing, preservation/packaging, and shipping. Additionally, potential sources may be responsible for supply chain management, logistics planning, forecasting production requirements, longlead time parts procurement, diminishing manufacturing sources and material shortage issues, and shipping serviceable assets. The unit prices will be established at the time of a contract award for the item(s) listed below. Potential sources may be responsible for nonrecurring engineering costs associated with becoming an approved source. The spares requirement for this effort is identified below: Part Number: 4089050 NSN: 2840-01-582-2802NZ Estimated Spares Requirement (QTY): 3
72%
Market Research01/20/2026

Additional Details

Solicitation Number

FA812126R0004

Archive Date

May 16, 2026

Office Address

TINKER AFB, OK, 73145-3303