GovChime
Notice ID: 0d455f653c70449796f54eea428f0d56Solicitation

KAUTZ ROAD SUBSTATION CONSTRUCION, UIP SUBPROJECT 2- KRS

Active, responses due . Full description on SAM.gov.

Overview

Response deadline
4:00 PM CST
Posted
November 2, 2026
Notice type
Solicitation
Set-aside
No Set aside used
NAICS
237130: Power and Communication Line and Related Structures Construction
Agency
Department of Energy

Notice details

Office
FERMILAB - DOE CONTRACTOR
Place of performance
Batavia, Illinois, 60510
PSC
Z2MZ: REPAIR OR ALTERATION OF EPG FACILITIES - OTHER, INCLUDING TRANSMISSION
Last updated
Nov 2, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
RFP-383167-CD
Notice ID
0d455f653c70449796f54eea428f0d56

Description

This scope of work is to rebuild and renovate the Kautz Road Substation (KRS), which is UIP subproject SP-2. The KRS supplies electricity to various lab buildings and systems. These systems serve both conventional facility needs, as well as process utility requirements. It is vital to Fermilab’s mission that KRS be revitalized and expanded, ensuring the ability to serve existing and future loads.

The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein.

The critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab.  The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window.

This project includes the following milestones:

Milestone 1 – 60 Calendar Days after issuance of Notice to Proceed (NTP). This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement.

Milestone 2 – 4th January 2028; This milestone marks the point where access is permitted inside Kautz Road Substation yard and construction work may begin.

Milestone 3 – 31st of March 2028; This milestone marks the completion of building foundation and ready for placement of the new prefabricated control house building (provided by FermiForward).

Milestone 4 – 2nd July 2029; This milestone marks the formal issuance of an Authorization for Use and Possession (AUP) of the KRS Substation facility, including all remedial work following removal of site trailers, but not including seasonal work and all final punch list items addressed..

Milestone 5 – 30th September 2029; This milestone marks the completion of the project.

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Documents

Files (18)

  • 383167 RFP 1.0 RFP Instructions to Offerors.pdf

    330 KBAdded in Solicitation version 1Posted
    Download
  • Exhibit A- Scope of Work- UIP Subproject 2 KRS.pdf

    321 KBAdded in Solicitation version 1Posted
    Download
  • Exhibit B- Construction Drawing Set.pdf

    72 MBAdded in Solicitation version 1Posted
    Download
  • Exhibit C- Specification Set.pdf

    12 MBAdded in Solicitation version 1Posted
    Download
  • Exhibit D- FFDG General Terms and Conditions for Construction (10.2026).pdf

    303 KBAdded in Solicitation version 1Posted
    Download
  • Exhibit E - Construction Insurance Requirements.pdf

    245 KBAdded in Solicitation version 1Posted
    Download
  • Exhibit F - Statement of Acknowledgment (SF-1413).pdf

    699 KBAdded in Solicitation version 1Posted
    Download
  • Exhibit G - Fermilab Subcontractor Safety Information Questionnaire.pdf

    1.4 MBAdded in Solicitation version 1Posted
    Download
  • Exhibit H- Price Proposal Form.pdf

    469 KBAdded in Solicitation version 1Posted
    Download
  • Exhibit I- SARC_Subcontractor Annual RepsCerts.pdf

    471 KBAdded in Solicitation version 1Posted
    Download
  • Exhibit J- Proposal Cerftifications Form PUR-466_r5_10.14.25.pdf

    406 KBAdded in Solicitation version 1Posted
    Download
  • Exhibit K_Bond Bid FL-41.pdf

    749 KBAdded in Solicitation version 1Posted
    Download
  • Exhibit L_FL-42 (Rev 1.25) - Payment Bond.pdf

    1.6 MBAdded in Solicitation version 1Posted
    Download
  • Exhibit M_Performance Bond_FL-40.pdf

    743 KBAdded in Solicitation version 1Posted
    Download
  • Exhibit N- Davis Bacon Wage Rater_ IL202600011.pdf

    1.4 MBAdded in Solicitation version 1Posted
    Download
  • Exhibit O- Small Business Subcontracting Plan Template.pdf

    517 KBAdded in Solicitation version 1Posted
    Download
  • Exhibit P- Compliance With Federal Anti-Discrimination Laws- PRC EXH 469.pdf

    278 KBAdded in Solicitation version 1Posted
    Download
  • Exhibit Q- Sample Firm-Fixed-Price Subcontract.pdf

    747 KBAdded in Solicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1SolicitationCurrent

    KAUTZ ROAD SUBSTATION CONSTRUCION, UIP SUBPROJECT 2- KRS

    Notice 0d455f653c70449796f54eea428f0d56 on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

RFP-383167-CD

Archive Date

Jan 2, 2027

Office Address

Batavia, IL, 60510