KAUTZ ROAD SUBSTATION CONSTRUCION, UIP SUBPROJECT 2- KRS
Active, responses due . Full description on SAM.gov.
Overview
- Response deadline
- 4:00 PM CST
- Posted
- November 2, 2026
- Notice type
- Solicitation
- Set-aside
- No Set aside used
- NAICS
- 237130: Power and Communication Line and Related Structures Construction
- Agency
- Department of Energy
Notice details
- Office
- FERMILAB - DOE CONTRACTOR
- Place of performance
- Batavia, Illinois, 60510
- PSC
- Z2MZ: REPAIR OR ALTERATION OF EPG FACILITIES - OTHER, INCLUDING TRANSMISSION
- Last updated
- Nov 2, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- RFP-383167-CD
- Notice ID
- 0d455f653c70449796f54eea428f0d56
Description
This scope of work is to rebuild and renovate the Kautz Road Substation (KRS), which is UIP subproject SP-2. The KRS supplies electricity to various lab buildings and systems. These systems serve both conventional facility needs, as well as process utility requirements. It is vital to Fermilab’s mission that KRS be revitalized and expanded, ensuring the ability to serve existing and future loads.
The General contractor shall furnish all required supervision, labor, materials, tools, plant and appurtenances necessary to perform diligently and fully all work as described in the drawings and technical specifications. All work includes transportation, overhead, bonding costs, safety oversight, quality control oversight, and supervision as required to construct the project described in the drawings, technical specification and the detailed description contained herein.
The critical schedule constraint for construction of this project is Fermilab’s accelerator shutdown, with an anticipated scheduled start on January 1, 2028, and anticipated end date of January 1, 2030- these dates may change depending on the needs of the Lab. The General Contractor must start their on-site efforts, and complete the construction scope under this contract, within the shutdown window.
This project includes the following milestones:
Milestone 1 – 60 Calendar Days after issuance of Notice to Proceed (NTP). This milestone is intended for completion of necessary submittals and RFIs, approval of shop drawings for fabrication and procurement.
Milestone 2 – 4th January 2028; This milestone marks the point where access is permitted inside Kautz Road Substation yard and construction work may begin.
Milestone 3 – 31st of March 2028; This milestone marks the completion of building foundation and ready for placement of the new prefabricated control house building (provided by FermiForward).
Milestone 4 – 2nd July 2029; This milestone marks the formal issuance of an Authorization for Use and Possession (AUP) of the KRS Substation facility, including all remedial work following removal of site trailers, but not including seasonal work and all final punch list items addressed..
Milestone 5 – 30th September 2029; This milestone marks the completion of the project.
Award Overview
Contacts
Contracting Officer
Primary Contact
Documents
Files (18)
- Download
383167 RFP 1.0 RFP Instructions to Offerors.pdf
330 KBAdded in Solicitation version 1Posted - Download
Exhibit A- Scope of Work- UIP Subproject 2 KRS.pdf
321 KBAdded in Solicitation version 1Posted - Download
Exhibit B- Construction Drawing Set.pdf
72 MBAdded in Solicitation version 1Posted - Download
Exhibit C- Specification Set.pdf
12 MBAdded in Solicitation version 1Posted - Download
Exhibit D- FFDG General Terms and Conditions for Construction (10.2026).pdf
303 KBAdded in Solicitation version 1Posted - Download
Exhibit E - Construction Insurance Requirements.pdf
245 KBAdded in Solicitation version 1Posted - Download
Exhibit F - Statement of Acknowledgment (SF-1413).pdf
699 KBAdded in Solicitation version 1Posted - Download
Exhibit G - Fermilab Subcontractor Safety Information Questionnaire.pdf
1.4 MBAdded in Solicitation version 1Posted - Download
Exhibit H- Price Proposal Form.pdf
469 KBAdded in Solicitation version 1Posted - Download
Exhibit I- SARC_Subcontractor Annual RepsCerts.pdf
471 KBAdded in Solicitation version 1Posted - Download
Exhibit J- Proposal Cerftifications Form PUR-466_r5_10.14.25.pdf
406 KBAdded in Solicitation version 1Posted - Download
Exhibit K_Bond Bid FL-41.pdf
749 KBAdded in Solicitation version 1Posted - Download
Exhibit L_FL-42 (Rev 1.25) - Payment Bond.pdf
1.6 MBAdded in Solicitation version 1Posted - Download
Exhibit M_Performance Bond_FL-40.pdf
743 KBAdded in Solicitation version 1Posted - Download
Exhibit N- Davis Bacon Wage Rater_ IL202600011.pdf
1.4 MBAdded in Solicitation version 1Posted - Download
Exhibit O- Small Business Subcontracting Plan Template.pdf
517 KBAdded in Solicitation version 1Posted - Download
Exhibit P- Compliance With Federal Anti-Discrimination Laws- PRC EXH 469.pdf
278 KBAdded in Solicitation version 1Posted - Download
Exhibit Q- Sample Firm-Fixed-Price Subcontract.pdf
747 KBAdded in Solicitation version 1Posted
Lifecycle
- 1Version 1SolicitationCurrent
KAUTZ ROAD SUBSTATION CONSTRUCION, UIP SUBPROJECT 2- KRS
Similar Opportunities
Additional Details
Solicitation Number
RFP-383167-CD
Archive Date
Jan 2, 2027
Office Address
Batavia, IL, 60510