CLR059 Utilidor Piping Upgrades
Archived on July 8, 2026. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM UTC−09:00
- Posted
- October 8, 2025
- Notice type
- Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 237110: Water and Sewer Line and Related Structures Construction
- Agency
- Department of WarDepartment of the Army
Notice details
- Office
- US ARMY CORPS OF ENGINEERS.ENGINEER DIVISION PACIFIC OCEAN.W2SN ENDIST ALASKA
- Place of performance
- Clear, AK
- PSC
- Z2NZ: REPAIR OR ALTERATION OF OTHER UTILITIES
- Last updated
- Aug 21, 2026
Identifiers
- Solicitation number
- W911KB25R0025
- Notice ID
- 0dea2d21097e4c7085032e0d4aab10d8
Description
This is a solicitation for a Request for Proposal (RFP) to renew and extend the service life of the distribution infrastructure located within the utilidor which serves the heating and water needs for the entire Clear Space Force Station. Remove and replace the steam, condensate, and water piping and supports within the Clear SFS utilidors. Repair, reseal, and insulate the utilidor where necessary. Replace ladders, hatches, lighting, switches, outlets, sump pumps, pavement and/or other supporting infrastructure as required. The estimated dollar magnitude of this project is anticipated between $25,000,000 and $100,000,000. The performance period will be approximately 1218 calendar days. The procurement will be conducted using two phase source selection procedures and the award will be based on best value tradeoff source selection procedures, considering the price and non-price factors cited in this announcement and the solicitation. All Offerors must be registered in the System for Award Management (SAM) (https://www.sam.gov/SAM/). Joint ventures must be registered in SAM as the joint venture. Offerors are advised to begin this process when they prepare their proposal in order to ensure this registration is in place should they be selected for the award. Lack of registration in the SAM database will make an Offeror ineligible for award.
Phase 2 has been posted to PIEE to vendors selected to move forward. The vendors selected to move forward are:
- Ahtna-Unit JV
- American Mechanical
- Derian
- Patrick Constructors
- Red Point Construction
Award Overview
Contacts
Contracting Officer
Primary Contact
Documents
No documents available.
Lifecycle
W911KB25R0025- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- SolicitationCurrentOct 8, 2025
CLR059 Utilidor Piping Upgrades
Similar Opportunities
Additional Details
Solicitation Number
W911KB25R0025
Archive Date
Jul 8, 2026
Office Address
ANCHORAGE, AK, 99506-0898