Z2DA--Replace Bldg. 700 UPS | project 612A4-27-040 | Mather CA

Responses closed . Full description on SAM.gov.

Overview

Response deadline
2:30 PM PDT
Posted
October 7, 2026
Notice type
Sources Sought
NAICS
236220: Commercial and Institutional Building Construction
Agency
Department of Veterans Affairs

Notice details

Office
261-NETWORK CONTRACT OFFICE 21 (36C261)
Place of performance
VA Northern California Health Care System, Mather, CA, 95655
Last updated
Oct 28, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
36C26127Q0081
Notice ID
10d462d181694a2eba28c9f498122768

Description

SOURCES SOUGHT NOTICE ONLY No# 36C26127Q0081 No Solicitation is currently Available Project Title: Install Uninterruptible Power Supply (UPS) at B700, VA Northern California Health Care System (VANCHCS) PLACE OF PERFORMANCE VA Northern California Health Care System 10535 Hospital Way, Mather, CA 95655 Description: This Sources Sought Notice is issued solely for information and planning purposes only and does not constitute a solicitation. All information received in response to this Sources Sought Notice that is marked as proprietary will be handled accordingly. In accordance with RFO 15.101(c)( https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-15#FAR_15_101), responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. Responders are solely responsible for all expenses associated with responding to this Sources Sought Notice. Point of Contact: Ms. Yuliya Kochkina, Contract Specialist, e-mail: yuliya.kochkina@va.gov. All associated project documents will be incorporated into the Proposal Request, which shall be posted electronically through https://sam.gov at a future date. Inquiries will only be accepted in writing via e-mail to yuliya.kochkina@va.gov on or before October 16, 2026, by 2:30 PM (PDT) Subject: Sources Sought Notice, Install Uninterruptible Power Supply (UPS) at B700 at VA Northern California Health Care System in room 1A526, Project No. 612A4-27-040, Mather, CA. The Government does not intend to award a contract on the basis of this Sources Sought Notice or to pay for the information solicited. All information contained in this Sources Sought Announcement is preliminary, as well as subject to modification. Although proposal, offeror, contractor, and offeror may be used in this sources sought notice, any response will be treated as information only. It shall not be used as a proposal. The purpose of this sources sought is to conduct market research to support the project identified above. This notice serves to survey the market in an attempt to ascertain whether or not sources are capable of providing the requested services. This notice allows potential contractors/vendors to submit a non-binding statement of interest and documentation demonstrating their capability. The sources sought effort is intended to assess industry capabilities and develop/support the intended direction of acquisition planning. The Network Contracting Office (NCO 21) is requesting responses from qualified business concerns; the qualifying NAICS code for this effort is 236220 Commercial and Institutional Building Construction. This sources sought notice is to gain knowledge of potential qualified sources and their size classifications (Service Disabled/Veteran Owned Small Business (SDVOSB/VOSB), Hub zone, 8(a), small, small disadvantaged, woman-owned small business, or large business) relative to NAICS 236220. Responses to this notice will be used by the Government to make appropriate acquisition decisions. Based upon information received in response to this Sources Sought Notice, the Government shall make a determination on a procurement strategy, which shall include the type of small business set-aside, if appropriate. The eventual procurement strategy and set-aside, if appropriate, is solely within the discretion of the Government. After review of the responses to this notice, a solicitation announcement may be published. Responses to this notice are not considered adequate responses to any corresponding solicitation announcement. All interested offerors will have to respond to the solicitation announcement in addition to responding to this notice. Issuance of this notice does not constitute any obligation whatsoever on the part of the Government to procure these services, or to issue a solicitation, nor to notify respondents of the results of this notice. No solicitation documents exist at this time; however, in the event the acquisition strategy demonstrates that an internal contracting vehicle is a viable option for procuring a solution, the request for quotation (RFQ) shall be posted internally. The Department of Veterans Affairs is neither seeking quotes nor accepting unsolicited quotes, and responses to this notice cannot be accepted as offers. Any information received from a contractor in response to this Sources Sought Notice may be used in creating a solicitation. Any information received which is marked with a statement, such as proprietary or confidential, intended to restrict distribution will not be distributed outside of the Government, except as required by law. The U.S. Government will not pay for any information or administrative costs incurred in response to this Sources Sought. Background & Description of Work: The Department of Veterans Affairs (VA) is seeking vendors to provide all necessary materials and labor to ensure correct parameters and safe operations are met by manufacturer s specifications. The scope of work is the installation of the Uninterruptable Power Supply (UPS) at B700. This contract is to provide a new 300 KVA UPS and electrical distribution to provide power to 3 Radiology Imaging modalities within the facility. The modalities that will be powered from this UPS are two Cath Lab units and one hybrid OR unit. Only Cath Lab #1 and Cath Lab #2 will be connected under this project scope to the Distribution panel. The contractor must provide a 5-ton ductless split system HVAC system to provide cooling within the room where the UPS will be located. Contractor must furnish all labor, equipment, and materials needed to perform all work required by the scope at the Mather VA Campus. The period of performance for all work is two hundred twenty (220) consecutive calendar days from the issuance of the Notice to Proceed (NTP) for the VA Northern California Health Care System (VANCHCS), Mather, CA. The applicable North American Industry Classification System (NAICS) Code is 236220 Commercial and Institutional Building Construction, and the small business size standard is $45.0 Million. PSC Code is Z2DA Repair or Alterations of Hospitals and Infirmaries. Estimated Magnitude of Construction for this project is Between $500,000 and $1,000,000. Potential Offerors must be registered in the System for Award Management (SAM) to be eligible for an award (See https://sam.gov/). Potential Offerors must also have a current Online Representations and Certification Application on file with SAM. All interested Service-Disabled Veteran-Owned Small Businesses (SDVOSB) and Veteran-Owned Small Businesses (VOSB) will be verified by the Department of Veterans Affairs (VA) and be listed in the Small Business Administration s (SBA). The Contracting Officer (CO) will use the SBA Small Business Search (SBA) (https://search.certifications.sba.gov/) to verify SDVOSB status until further guidance is provided by the Department of Veterans Affairs. INSTRUCTIONS: Because the solicitation strategy is dependent upon responses to this sources sought notice, interested parties are encouraged to provide complete and accurate responses to all items below, and should be limited to a brief description of one (1) page (not including a cover letter). If any portions seem unclear or prohibited, and/or you are unsure about the descriptions of the requirement, please list your comments and/or concerns in your response so they can be addressed. a) STATEMENT OF CAPABILITY - Demonstrate how your company can provide the requested services that are required in the attached Statement of Work (SOW) both in magnitude and scope. Include past experience (within the past five years) in similar in both magnitude and scope services to the VA, other Government (Federal or State) agencies, or a private facility. Include general information, a brief description of the work, and the total magnitude of each project. b) SOCIO-ECONOMIC STATUS - Specify under which disadvantaged group and if your firm is certified under Section 8(a) of the Small Business Act. Indicate if your firm is a certified Service- Disabled Veteran Owned Small Business (SDVOSB) or Veteran- Owned Small Business (VOSB). c) INCLUDE CAGE and SAM Unique Entity Identifier (UEI) number of your company in your response. d) BONDING CAPABILITY: Include both per individual contract and aggregate. Provide the amount of aggregate bonding currently available (i.e., the amount not committed). e) QUESTIONS Provide answers to the following questions: 1. Does the Estimated Magnitude of Construction seem feasible? 2. Is the period of performance listed in the statement of work reasonable? 220 calendar days from NTP. 3. Has your firm performed a comparable project on a scale to the UPS installation, similar to the Statement of Work? If so, how recent? 4. Has your firm completed any UPS installation projects for a hospital building before and in an active healthcare environment? What would your proposed general method be? 5. Has your company had previous experience working with the Government or the VA specifically? 6. This work will require experienced journeymen technicians. Are such employees on staff, or will the services need to be subcontracted? If a subcontractor is needed, how long or how many previous jobs of similar scale and scope have your firms worked together? 7. If known, what are any estimated lead times for this project materials and any potential supply chain disruptions or other issues you foresee? 8. Do you foresee any issue(s) with adhering to the Buy American Act with this SOW or project? If so, explain concern or rationale? 9. Provide any input or project concerns that you foresee. If interested, responses are due in writing only by 2:30 pm (PT), October 16, 2026. Please submit e-mail responses to Ms. Yuliya Kochkina, Contract Specialist, at yuliya.kochkina@va.gov. Please place Response to Sources Sought Notice for UPS Installation in the VANCHCS in the subject line of your e-mail. This notice is to assist the VA in determining sources only. DISCLAIMER This Sources Sought Notice is issued solely for information and planning purposes only and does not constitute a solicitation. All information received in response to this Sources Sought Notice that is marked as proprietary will be handled accordingly. In accordance with RFO FAR Part 10 (https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-10 and RFO FAR Part 15.101(c) ( https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-15#FAR_15_101), responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. Responders are solely responsible for all expenses associated with responding to this Sources Sought Notice. ----- End of Sources Sought Notice-----

Full description on SAM.gov

Award Overview

Possible prior contract

Inferred, not confirmed

Inferred, not confirmed. Matched by agency, NAICS, place of performance and end-date proximity. This is a candidate, not the contractor of record.

Contract end date

Dec 31, 2026

NAICS

236220

Agency

Department of Veterans Affairs

Dollar amounts are not shown for inferred matches because the link is heuristic. Open the award below to check it.

Contacts

Contracting Officer

Primary Contact

Ms. Yuliya Kochkina
Contract Specialist

Documents

Files (3)

  • SSN Floor Plan Bldg 700 and cut sheet VRLA battery.pdf

    3.4 MBAdded in Sources Sought version 1Posted
    Download
  • SSN Install UPS at Building 700 SOW.pdf

    153 KBAdded in Sources Sought version 1Posted
    Download
  • 36C26127Q0081.docx

    27 KBAdded in Sources Sought version 1Posted
    Download

Lifecycle

  1. 1
    Version 1Sources SoughtCurrent

    Z2DA--Replace Bldg. 700 UPS | project 612A4-27-040 | Mather CA

    Notice 10d462d181694a2eba28c9f498122768 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline
Presolicitation Notice Presolicitation Notice Page 5 of 5 Presolicitation Notice *=Required Field Presolicitation Notice Page 1 of 5 DESCRIPTION TITLE OF PROJECT: 657-26-102JC FCA Replace Various Roofs on BLDG 1, JC Solicitation 36C25527R0012 Scope of work: The General Description: VA Saint Louis Health Care System, John Cochran Division, requires a Construction Contractor to to replace various roofs identified through FCA report. Project will replace existing roofing beyond its useful life at JC. Roofs: R01, R02, R03, R18, R23, R26, R27, R28, R30, R31, R36,and R37; totaling approximately 44,000 SF. The following roof areas are modified bitumen roofs that have exceeded their useful life and should be replaced soon: R01, R02, R03, R18, R23, R26, R27, R28, R30, R31, R36, and R37.All work shall be performed in accordance with solicitation/contract terms and conditions,specifications and drawings, and all applicable VA TIL and local and National codes. Contractorshall furnish all supervision, tools, labor, materials, equipment, transportation and testingnecessary. Contractor will perform site investigations to fully inform themselves of the conditions and limitations applied to the work.T his project has a set of drawings and specifications. These drawings and specifications indicate the work to be performed. Work includes, but is not limited to, general construction, alterations, mechanical and electrical work, utility systems, necessary demolition and removal of existing structures, associated appurtenances and certain other items necessary completion. All work shall be performed in accordance with solicitation/contract terms and conditions, specifications and drawings, and all applicable VA TIL and local and National codes. Contractor shall furnish all supervision, tools, labor, materials, equipment, transportation and testing necessary. Contractor will perform site investigations to fully inform themselves of the conditions and limitations applied to the work. All project work shall be installed in accordance with all applicable standards available at time of installation to include published commercial specifications as well as standards and preferences expressed in this document. All installation details shall be fully coordinated with VA CO and on-site Contracting Officer s Representative (COR). Period of Performance for all work is 180 calendar days. The facility location is the John Cochran VA Medical Center 915 N Grand Blvd, St. Louis, MO 63106. Pursuant to 38 USC 8127(d) and in accordance with Public Law 109-461, the Veterans Benefits, Healthcare and Information Technology Act of 2006, this procurement is set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). The estimated cost magnitude is between $1,000,000-$2,000,000 (VARR 836.204). The North American Industry Classification Code (NAICS) for this procurement is 236220 (Commercial and Institutional Building Construction) with a small business size standard of $45.0 million. The duration of the project is estimated to be 180 calendar days after receipt of notice to proceed. This completion period includes final inspection and clean-up. Award will be made utilizing the Best Value Lowest Price Technically Acceptable Source Selection Process in accordance with Federal Acquisition Regulation (FAR) 15.101-2. Proposal submission instructions and project specific instructions will be included in the solicitation package. The government plans to award without discussions but reserves the right to hold discussions if necessary. The offeror is responsible to monitor and download any amendments from the System of Award Management (SAM) Business Opportunities (https://sam.gov/) website, which may be issued to this pre-solicitation. The successful prime contractor must perform no less than 85 percent of the General Construction labor for NAICS Code 236220. Proposal submission instructions will be included in the solicitation package. The government plans to award without discussions but reserves the right to hold discussions if necessary. The offeror is responsible to monitor and download any amendments from the System of Award Management (SAM) Business Opportunities (https://sam.gov/) website, which may be issued to this pre-solicitation. In accordance with FAR 52.204-7, registration in SAM is required and in accordance with FAR 2.101, prospective contractors must be registered in SAM under the applicable NAICS code. Additionally, in accordance with the Veterans Affairs Acquisition Regulation (VAAR) 819.7003, only businesses verified under the applicable NAICS and listed in the small business administration (SBA) registry https://veterans.certify.sba.gov, shall be considered. Firms may obtain SAM information at https://www.sam.gov and VIP information at Veteran Small Business Certification at https://veterans.certify.sba.gov. The solicitation package and drawings should be available for download on or before November 16, 2026, and the proposal due date will be on or about December2 , 2026. An organized site visit will be scheduled, and the information will be made available at time of solicitation issuance. Only one site visit will be scheduled and interested offerors are highly encouraged to attend. No hard copies of the solicitation or drawings will be provided; and telephone requests or questions will NOT be accepted. Please make sure that the subject line reads, Project: 657-26-102JC FCA Replace Various Roofs on BLDG 1, JC END OF NOTICE
95%
Pre-Solicitation11/13/2026
Sources Sought Notice Sources Sought Notice Page 5 of 5 Sources Sought Notice *= Required Field Sources Sought Notice Page 1 of 5 The VA Saint Louis Health Care System, John Cochran Division, requires a Construction Contractor to replace various roofs identified through FCA report. Project will replace existing roofing beyond its useful life at JC. Roofs: R01, R02, R03, R18, R23, R26, R27, R28, R30, R31, R36, and R37; totaling approximately 44,000 SF. This project has a set of drawings and specifications. These drawings and specifications indicate the work to be performed at the John Cochran VAMC. Title: 657-26-102JC FCA Replace Various Roofs on BLDG 1, JC Solicitation Number: 36C25527R0012 Contracting Office: Network Contracting Office 15 Contracting Office Location: 3450 S 4th Street Traffic way, Leavenworth, Kansas Posted Date: 10/22/2026 Response Date: 10/30/2026 at 2:00 PM Central Time Set Aside: Service-Disabled Veteran Owned Small Business Classification Code: Z2DA - Repair or Alteration of Hospitals and Infirmaries NAICS Code: 236220 Commercial and Institutional Building Construction Synopsis: Please note that this is NOT a request for quotes or proposals, the Government is seeking information for market research purposes only. The Government may or may not issue solicitation documents. The Department of Veterans Affairs Network Contracting Office (NCO) 15, is conducting a market survey for qualified: Service-Disabled Veteran Owned Small Businesses (SDVOSB), capable of providing the required services outlined below for the John Cochran VA Medical Center, Saint Louis, Missouri. The applicable NAICS code is 236220 Commercial and Institutional Building Construction and the size standard is $45.0 Million. Responses to this notice must be submitted via e-mail and received no later than October 30, 2026, at 2:00 PM Central Time. No telephone inquiries will be accepted or returned. Additional information about this project will be issued on the Federal Contract Opportunities website https://www.sam.gov once available. Period of Performance for all work is 180 calendar days. In accordance with FAR 36.204, the estimated cost magnitude is between $1,000,000.00 and $5,000,000.00 Prospective SDVOSB firms are reminded that in accordance with Federal Acquisition Regulation (FAR) 52.219-14(e)(3), the Contractor agrees it will not pay more than 85 percent of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count towards the prime contractor's 85 percent subcontract amount that cannot be exceeded. GENERAL SCOPE OF WORK: Work includes, but is not limited to, general construction, alterations, mechanical, electrical & plumbing work, utility systems, fire protection systems, abatement work, necessary demolition and removal of existing structures, associated appurtenances, and certain other items necessary completion. All work shall be performed in accordance with solicitation/contract terms and conditions, specifications and drawings, and all applicable VA TIL and local and National codes. Contractor shall furnish all supervision, tools, labor, materials, equipment, transportation and testing necessary. Contractor will perform site investigations to fully inform themselves of the conditions and limitations applied to the work. The drawings and specifications include guidance on: Working hours allowed on this project. ICRA (Infection Control Risk Assessments) requirements and containment barriers. ILSM (Interim Life Safety Measures). Division of responsibilities between contractor and equipment vendor. This Statement of Work (SOW) is intended as an outline and is not a detailed summary of the work the contractor will be required to perform. In the event of conflict between this SOW and the project drawings and specifications, the drawings and specifications will take precedence over this SOW. The project will be completed within 210 calendar days from receipt of Notice to Proceed (NTP). END OF SCOPE OF WORK Interested firms must be registered in https://sam.gov with NAICS code 236220 and qualified as a Service Disabled Veteran Owned small business under 236220 Commercial and Institutional Building Construction. Qualified service-disabled veteran owned small businesses are encouraged to respond and required to be registered in with the Small Business Administration (SBA) registry https://veterans.certify.sba.gov on or before the response date. If interested in this opportunity, please provide Capability Statement via email. The Capability Statement is designed to inform the Department of Veteran Affairs of any prospective construction contractors' project execution capabilities. The submission is limited to 10 pages which shall include the following information: 1) Offeror's name, address, point of contact, phone number, e-mail address, and Unique Entity ID. 2) Offeror's interest in bidding on the solicitation when it is issued. 3) Offeror's capability to perform a contract of this magnitude and complexity and comparable work performed within the past 5 years - brief description of the project, customer name, timeliness of performance, customer satisfaction, and dollar value of the project - provide at least 1, but no more than 3 completed construction examples. 4) Offeror's CVE certification as a Veteran owned business. 5) Please provide Socio-economic status for NAICS code 236220 Commercial and Institutional Building Construction and provide percentage of self-performed labor your company can perform for this type of project. 6) Offeror's Joint Venture information if applicable - existing and potential. 7) Offeror's Bonding Capability in the form of a letter from Surety providing bonding level per contract and aggregate. No basis for claim against the Government shall arise as a result of a response to this sources sought or Government use of any information provided. The Government will not pay for information or comments provided and will not recognize any costs associated with submission of comments. There is no guarantee, expressed or implicit, that market research for this acquisition will result in a particular set-aside, or any other guarantee of award or acquisition strategy. Responses must be received by 2:00 PM Central on October 30, 2026, via e-mail to the Contracting Officer at Matthew.Finley@va.gov and Contract Specialist Abby.Monroe2@va.gov PLEASE REFERENCE "SOURCES SOUGHT: 657-26-102JC, Replace Various Roofs on BLDG 1 , IN THE SUBJECT LINE and cover sheet. Respondents will not be contacted regarding their submission or information gathered as a result of this Sources Sought notice. Interested firms shall be required to respond to additional announcements separately from this announcement without further notice from the Government when posted to the Contract Opportunities website at https://sam.gov. The Contract Opportunities website is the only official site to obtain these documents. Contracting Office Address: Department of Veterans Affairs; Network 15 Contracting Office; 3450 S. 4th Street, Leavenworth, KS 66048 Point of Contact(s): Abby Monroe, Contract Specialist, e-mail address: Abby.Monroe2@va.gov
95%
Market Research10/30/2026
VA Northern California Health Care System 612A4-27-018 Page 4 of 5 Statement of Work Replace B650 3rd and 2nd Flooring Project #612A4-27-018 General Intention: The purpose of this project is to replace flooring, resilient base, stainless steel corner guards, and paint throughout B650 3rd and 2nd Floor of the Sacramento Veterans Affairs Medical Center (VAMC) of VA Northern California Healthcare System (VANCHCS). Contractor shall furnish all labor and materials needed to perform all demolition, replacement, and installation required by this scope as required by specifications. Visits to the site by bidders may be made only by appointment with the Contracting Officer (CO) for the project. A preliminary/pre-proposal site visit is strongly encouraged and shall be coordinated with the Contracting Officer Representative (COR). Location of work; the geographic location for service(s) are the following areas: Sacramento VA Medical Center 10535 Hospital Way Mather, CA 95655 Buildings: 650 3rd and 2nd Floors The contractor shall consider that there are no staging areas available within the facility premises. If necessary, staging areas may be put into effect at the discretion of the COR, depending on availability. The Contractor shall note that there is absolutely NO Contractor employee parking in Patient Parking designated areas. VANCHCS will not invalidate or make reimbursement for parking violations for the Contractor under any conditions. The contractor will be responsible for disposing of all equipment components and trash demolished or replaced as part of this project. The contractor is responsible for following infection control procedures per VA specifications and site infection control protocols. Schedule of work: All work shall be performed outside of normal working hours, which are 7:30 AM to 4:00 PM, Monday through Friday, excluding weekends and holidays unless approved by the CO. Work during normal hours may only be scheduled if it is planned at least three weeks in advance for a specific location and approved by the appropriate VA personnel. Any work activities that generate noise or disruption sufficient to impact patient care, disturb patients, or interfere with staff operations must be conducted only after normal working hours or on weekends. The contractor is responsible for coordinating with VA COR to ensure all work scheduling complies with this requirement and must provide notification of planned work at least three weeks prior to commencement. Emergency work or exceptions to this schedule must be requested in writing and approved by the CO. The Contractor shall prepare any necessary construction documents and provide all necessary/required professional engineering services to include, but not limited to tools, equipment, materials, labor, travel, expertise, supervision, testing, analysis, and specialty services to accomplish all items and requirements outlined in this SOW. All work shall comply with all applicable federal, state, local and VA regulations and requirements. Scope of Work: The contractor shall replace approximately 38,000 square feet (SF) of carpet and luxury vinyl tile throughout Building 650 3rd and 2nd Floors as shown in Exhibit A - BLDG 650 2nd and 3rd Floors Room Flooring Replacement and Attachment 1 - BLDG 650 Mather 2nd and 3rd Floor Carpet Replacement Current Flooring. Resilient wall base shall also be replaced at all spaces that will receive new flooring. The Contractor shall refer to Specification Section 09 06 00, Schedules for Finishes, for the products and finishes required under this contract. The Contractor shall furnish the specified products or an equivalent product that meets or exceeds all requirements of the specified product, including, as applicable, quality, performance, durability, compatibility, dimensions, appearance, finish, color, and warranty requirements. The proposed product shall be similar in appearance and shall match the color, texture, pattern, and finish of the specified product to the satisfaction of VA Engineering. The Contractor shall submit product data, samples, color charts, and other information necessary for VA Engineering s evaluation and approval. Attachment 1 - BLDG 650 Mather 2nd and 3rd Floor Carpet Replacement Current Flooring shows current carpet with red lines across rooms or spaces that will remain the same (no change in these). Exhibit A - BLDG 650 2nd and 3rd Floors Room Flooring Replacement states room by room current flooring and resilient base to be installed. The Contractor shall refer to Specification Section 09 06 00, Schedules for Finishes, for the products and finishes required under this contract. The Contractor shall furnish the specified products or an equivalent product that meets or exceeds all requirements of the specified product, including, as applicable, quality, performance, durability, compatibility, dimensions, appearance, finish, color, and warranty requirements. The proposed product shall be similar in appearance and shall match the color, texture, pattern, and finish of the specified product to the satisfaction of VA Engineering. The Contractor shall submit product data, samples, color charts, and other information necessary for VA Engineering s evaluation and approval. The contractor shall remove and install new accessories associated with the flooring. Carpet and luxury vinyl tiles to include, but not limited to, subfloors, carpet tack strips, carpet padding, and vinyl glue. The contractor shall paint all rooms located on the 2nd and 3rd floors of Building 650 per specification Section 09 06 00, Schedule of Finishes. The Contractor shall furnish the specified products or an equivalent product that meets or exceeds all requirements of the specified product, including, as applicable, quality, performance, durability, compatibility, dimensions, appearance, finish, color, and warranty requirements. The proposed product shall be similar in appearance and shall match the color, texture, pattern, and finish of the specified product to the satisfaction of VA Engineering. The Contractor shall submit product data, samples, color charts, and other information necessary for VA Engineering s evaluation and approval. The contractor shall anticipate repairing up to 20% of the drywall surface area in each room as needed to ensure a uniform and high-quality finish. All drywall repairs must be completed to meet VA standards and industry best practices before any painting activities commence. The contractor is responsible for providing all necessary materials, labor, and equipment to complete both the repair and painting work. The VA will provide a paint plan as the installation date approaches. The contractor shall replace all existing plastic corner guards with new stainless steel corner guards to match exact material per specification Section 09 06 00, Schedules for Finishes or an equivalent. For installation purposes and material lengths, the contractor shall follow wall mockup located outside the Engineering Suite at Building 650. Contractor to coordinate visit with COR. Contractor shall take into consideration that additional corner guards up to 10 additional might be needed upon request of the VA. The contractor shall meet with the COR to discuss and outline phasing requirements for the project. These phasing requirements shall describe the general sequence of the project work, estimated project duration, and what Government constraints will exist that will influence the Contractor s approach to the construction project. The Sacramento VAMC is an active hospital and therefore will require consideration to those areas with patients and staff. The contractor shall be responsible for the administration and management of all aspects of this SOW. This includes responsibility for all Contractor employees, Subcontractors, Agents, and anyone acting for or on behalf of the Contractor. This project is to take no longer than 240 calendar days from notice to proceed (NTP). If work is approved during the week (Monday Friday), the contractor will be assigned no more than five (5) rooms at a time in which to perform work. Additional rooms will only be assigned upon satisfactory completion and inspection of the previously assigned rooms. This approach is intended to ensure quality control, minimize disruption to facility operations, and allow for efficient project management. The contractor shall coordinate with the COR regarding room assignments and completion timelines. Construction: Do not block doorways. Do not store material other than the worksite currently being worked on. Ensure GFCIs are used for all electrical tools. Remove any site obstructions. Maintain proper housekeeping. Maintain dust control to follow requirements in the ICRA permit class. Always use dust mats in place and secure work areas. Use dust barrier zipper doors at each work area. Use plastic sheeting to cover all furniture at each work area if furniture is not being removed. Post Construction: Contractor shall clean all construction areas and remove all construction debris from site. Contractor shall walk the project with the COR; project is not complete until COR provides final acceptance. Specification and Drawings for Contractor: Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense. Records Management Requirements: A.  Applicability This clause applies to all Contractors whose employees create, work with, or otherwise handle Federal records, as defined in Section B, regardless of the medium in which the record exists.  B.  Definitions Federal record as defined in 44 U.S.C. § 3301, includes all recorded information, regardless of form or characteristics, made or received by a Federal agency under Federal law or in connection with the transaction of public business and preserved or appropriate for preservation by that agency or its legitimate successor as evidence of the organization, functions, policies, decisions, procedures, operations, or other activities of the United States Government or because of the informational value of data in them.  The term Federal record: includes VHA records. does not include personal materials. applies to records created, received, or maintained by Contractors pursuant to their VHA contract. may include deliverables and documentation associated with deliverables. C.  Requirements Contractor shall comply with all applicable records management laws and regulations, as well as National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. chs. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of 1974 (5 U.S.C. 552a). These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion. In accordance with 36 CFR 1222.32, all data created for Government use and delivered to, or falling under the legal control of, the Government are Federal records subject to the provisions of 44 U.S.C. chapters 21, 29, 31, and 33, the Freedom of Information Act (FOIA) (5 U.S.C. 552), as amended, and the Privacy Act of 1974 (5 U.S.C. 552a), as amended and must be managed and scheduled for disposition only as permitted by statute or regulation. In accordance with 36 CFR 1222.32, the Contractor shall maintain all records created for Government use or created in the course of performing the contract and/or delivered to, or under the legal control of the Government and must be managed in accordance with Federal law. Electronic records and associated metadata must be accompanied by sufficient technical documentation to permit understanding and use of the records and data. VHA and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Records may not be removed from the legal custody of VHA or destroyed except in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the Contracting Activity. Willful and unlawful destruction, damage, or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. In the event of any unlawful or accidental removal, defacing, alteration, or destruction of records, the Contractor must report to VHA. The agency must report promptly to NARA in accordance with 36 CFR 1230. The Contractor shall immediately notify the appropriate Contracting Officer upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records, or equipment. Disclosure of non-public information is limited to authorized personnel with a need-to-know as described in the [contract vehicle]. The Contractor shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records, and/or equipment is properly protected. The Contractor shall not remove material from Government facilities or systems, or facilities or systems operated or maintained on the Government s behalf, without the express written permission of the Head of the Contracting Activity. When information, data, documentary material, records, and/or equipment is no longer required, it shall be returned to VHA control or the Contractor must hold it until otherwise directed. Items returned to the Government shall be hand-carried, mailed, emailed, or securely electronically transmitted to the Contracting Officer or address prescribed in the [contract vehicle]. Destruction of records is EXPRESSLY PROHIBITED unless in accordance with Paragraph (4). The Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material, and/or records generated under, or relating to, contracts. The Contractor (and any sub-contractor) is required to abide by Government and VHA guidance for protecting sensitive, proprietary information, classified, and controlled unclassified information. The Contractor shall only use Government IT equipment for purposes specifically tied to or authorized by the contract and in accordance with VHA policy. The Contractor shall not create or maintain any records containing any non-public VHA information that is not specifically tied to or authorized by the contract. The Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected from public disclosure by an exemption to the Freedom of Information Act. The VHA owns the rights to all data and records produced as part of this contract. All deliverables under the contract are the property of the U.S. Government for which VHA shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. Any Contractor rights in the data or deliverables must be identified as required by FAR 52.227-11 through FAR 52.227-20. Training.  All Contractor employees assigned to this contract who create, work with or otherwise handle records are required to take VHA-provided records management training. The Contractor is responsible for confirming training has been completed according to agency policies, including initial training and any annual or refresher training. [Note: To the extent an agency requires contractors to complete records management training, the agency must provide the training to the contractor.] D.  Flow down of requirements to subcontractors The Contractor shall incorporate the substance of this clause, its terms, and requirements including this paragraph, in all subcontracts under this [contract vehicle], and require written subcontractor acknowledgment of same. Violation by a subcontractor of any provision set forth in this clause will be attributed to the Contractor. ATTACHMENTS: The following list of documents are attached to this SOW for contractor use and incorporation into the project documents: Current Flooring Plans (see Attachment 1 - BLDG 650 Mather 2nd and 3rd Floor Carpet Replacement Current Flooring) Flooring to be used per room (Exhibit A - BLDG 650 2nd and 3rd Floors Room Flooring Replacement) NOTE: Contractor shall field verify accuracy of all attachments and RFI if something is not clear. END OF STATEMENT OF WORK 10/14: Amendment 0001- add definitions 11/4: Amendment 0002- Attach site visit sign-in sheet and contractor certification regarding safety and environmental 11/13: Amendment 0003- RFI responses, add updated attachments, extend bid due date.
90%
Solicitation11/20/2026
VA Northern California Health Care System 612A4-27-018 Page 4 of 5 Statement of Work Replace B650 3rd and 2nd Flooring Project #612A4-27-018 General Intention: The purpose of this project is to replace flooring, resilient base, stainless steel corner guards, and paint throughout B650 3rd and 2nd Floor of the Sacramento Veterans Affairs Medical Center (VAMC) of VA Northern California Healthcare System (VANCHCS). Contractor shall furnish all labor and materials needed to perform all demolition, replacement, and installation required by this scope as required by specifications. Visits to the site by bidders may be made only by appointment with the Contracting Officer (CO) for the project. A preliminary/pre-proposal site visit is strongly encouraged and shall be coordinated with the Contracting Officer Representative (COR). Location of work; the geographic location for service(s) are the following areas: Sacramento VA Medical Center 10535 Hospital Way Mather, CA 95655 Buildings: 650 3rd and 2nd Floors The contractor shall consider that there are no staging areas available within the facility premises. If necessary, staging areas may be put into effect at the discretion of the COR, depending on availability. The Contractor shall note that there is absolutely NO Contractor employee parking in Patient Parking designated areas. VANCHCS will not invalidate or make reimbursement for parking violations for the Contractor under any conditions. The contractor will be responsible for disposing of all equipment components and trash demolished or replaced as part of this project. The contractor is responsible for following infection control procedures per VA specifications and site infection control protocols. Schedule of work: All work shall be performed outside of normal working hours, which are 7:30 AM to 4:00 PM, Monday through Friday, excluding weekends and holidays unless approved by the CO. Work during normal hours may only be scheduled if it is planned at least three weeks in advance for a specific location and approved by the appropriate VA personnel. Any work activities that generate noise or disruption sufficient to impact patient care, disturb patients, or interfere with staff operations must be conducted only after normal working hours or on weekends. The contractor is responsible for coordinating with VA COR to ensure all work scheduling complies with this requirement and must provide notification of planned work at least three weeks prior to commencement. Emergency work or exceptions to this schedule must be requested in writing and approved by the CO. The Contractor shall prepare any necessary construction documents and provide all necessary/required professional engineering services to include, but not limited to tools, equipment, materials, labor, travel, expertise, supervision, testing, analysis, and specialty services to accomplish all items and requirements outlined in this SOW. All work shall comply with all applicable federal, state, local and VA regulations and requirements. Scope of Work: The contractor shall replace approximately 38,000 square feet (SF) of carpet and luxury vinyl tile throughout Building 650 3rd and 2nd Floors as shown in Exhibit A - BLDG 650 2nd and 3rd Floors Room Flooring Replacement and Attachment 1 - BLDG 650 Mather 2nd and 3rd Floor Carpet Replacement Current Flooring. Resilient wall base shall also be replaced at all spaces that will receive new flooring. The Contractor shall refer to Specification Section 09 06 00, Schedules for Finishes, for the products and finishes required under this contract. The Contractor shall furnish the specified products or an equivalent product that meets or exceeds all requirements of the specified product, including, as applicable, quality, performance, durability, compatibility, dimensions, appearance, finish, color, and warranty requirements. The proposed product shall be similar in appearance and shall match the color, texture, pattern, and finish of the specified product to the satisfaction of VA Engineering. The Contractor shall submit product data, samples, color charts, and other information necessary for VA Engineering s evaluation and approval. Attachment 1 - BLDG 650 Mather 2nd and 3rd Floor Carpet Replacement Current Flooring shows current carpet with red lines across rooms or spaces that will remain the same (no change in these). Exhibit A - BLDG 650 2nd and 3rd Floors Room Flooring Replacement states room by room current flooring and resilient base to be installed. The Contractor shall refer to Specification Section 09 06 00, Schedules for Finishes, for the products and finishes required under this contract. The Contractor shall furnish the specified products or an equivalent product that meets or exceeds all requirements of the specified product, including, as applicable, quality, performance, durability, compatibility, dimensions, appearance, finish, color, and warranty requirements. The proposed product shall be similar in appearance and shall match the color, texture, pattern, and finish of the specified product to the satisfaction of VA Engineering. The Contractor shall submit product data, samples, color charts, and other information necessary for VA Engineering s evaluation and approval. The contractor shall remove and install new accessories associated with the flooring. Carpet and luxury vinyl tiles to include, but not limited to, subfloors, carpet tack strips, carpet padding, and vinyl glue. The contractor shall paint all rooms located on the 2nd and 3rd floors of Building 650 per specification Section 09 06 00, Schedule of Finishes. The Contractor shall furnish the specified products or an equivalent product that meets or exceeds all requirements of the specified product, including, as applicable, quality, performance, durability, compatibility, dimensions, appearance, finish, color, and warranty requirements. The proposed product shall be similar in appearance and shall match the color, texture, pattern, and finish of the specified product to the satisfaction of VA Engineering. The Contractor shall submit product data, samples, color charts, and other information necessary for VA Engineering s evaluation and approval. The contractor shall anticipate repairing up to 20% of the drywall surface area in each room as needed to ensure a uniform and high-quality finish. All drywall repairs must be completed to meet VA standards and industry best practices before any painting activities commence. The contractor is responsible for providing all necessary materials, labor, and equipment to complete both the repair and painting work. The VA will provide a paint plan as the installation date approaches. The contractor shall replace all existing plastic corner guards with new stainless steel corner guards to match exact material per specification Section 09 06 00, Schedules for Finishes or an equivalent. For installation purposes and material lengths, the contractor shall follow wall mockup located outside the Engineering Suite at Building 650. Contractor to coordinate visit with COR. Contractor shall take into consideration that additional corner guards up to 10 additional might be needed upon request of the VA. The contractor shall meet with the COR to discuss and outline phasing requirements for the project. These phasing requirements shall describe the general sequence of the project work, estimated project duration, and what Government constraints will exist that will influence the Contractor s approach to the construction project. The Sacramento VAMC is an active hospital and therefore will require consideration to those areas with patients and staff. The contractor shall be responsible for the administration and management of all aspects of this SOW. This includes responsibility for all Contractor employees, Subcontractors, Agents, and anyone acting for or on behalf of the Contractor. This project is to take no longer than 240 calendar days from notice to proceed (NTP). If work is approved during the week (Monday Friday), the contractor will be assigned no more than five (5) rooms at a time in which to perform work. Additional rooms will only be assigned upon satisfactory completion and inspection of the previously assigned rooms. This approach is intended to ensure quality control, minimize disruption to facility operations, and allow for efficient project management. The contractor shall coordinate with the COR regarding room assignments and completion timelines. Construction: Do not block doorways. Do not store material other than the worksite currently being worked on. Ensure GFCIs are used for all electrical tools. Remove any site obstructions. Maintain proper housekeeping. Maintain dust control to follow requirements in the ICRA permit class. Always use dust mats in place and secure work areas. Use dust barrier zipper doors at each work area. Use plastic sheeting to cover all furniture at each work area if furniture is not being removed. Post Construction: Contractor shall clean all construction areas and remove all construction debris from site. Contractor shall walk the project with the COR; project is not complete until COR provides final acceptance. Specification and Drawings for Contractor: Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense. Records Management Requirements: A.  Applicability This clause applies to all Contractors whose employees create, work with, or otherwise handle Federal records, as defined in Section B, regardless of the medium in which the record exists.  B.  Definitions Federal record as defined in 44 U.S.C. § 3301, includes all recorded information, regardless of form or characteristics, made or received by a Federal agency under Federal law or in connection with the transaction of public business and preserved or appropriate for preservation by that agency or its legitimate successor as evidence of the organization, functions, policies, decisions, procedures, operations, or other activities of the United States Government or because of the informational value of data in them.  The term Federal record: includes VHA records. does not include personal materials. applies to records created, received, or maintained by Contractors pursuant to their VHA contract. may include deliverables and documentation associated with deliverables. C.  Requirements Contractor shall comply with all applicable records management laws and regulations, as well as National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. chs. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of 1974 (5 U.S.C. 552a). These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion. In accordance with 36 CFR 1222.32, all data created for Government use and delivered to, or falling under the legal control of, the Government are Federal records subject to the provisions of 44 U.S.C. chapters 21, 29, 31, and 33, the Freedom of Information Act (FOIA) (5 U.S.C. 552), as amended, and the Privacy Act of 1974 (5 U.S.C. 552a), as amended and must be managed and scheduled for disposition only as permitted by statute or regulation. In accordance with 36 CFR 1222.32, the Contractor shall maintain all records created for Government use or created in the course of performing the contract and/or delivered to, or under the legal control of the Government and must be managed in accordance with Federal law. Electronic records and associated metadata must be accompanied by sufficient technical documentation to permit understanding and use of the records and data. VHA and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Records may not be removed from the legal custody of VHA or destroyed except in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the Contracting Activity. Willful and unlawful destruction, damage, or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. In the event of any unlawful or accidental removal, defacing, alteration, or destruction of records, the Contractor must report to VHA. The agency must report promptly to NARA in accordance with 36 CFR 1230. The Contractor shall immediately notify the appropriate Contracting Officer upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records, or equipment. Disclosure of non-public information is limited to authorized personnel with a need-to-know as described in the [contract vehicle]. The Contractor shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records, and/or equipment is properly protected. The Contractor shall not remove material from Government facilities or systems, or facilities or systems operated or maintained on the Government s behalf, without the express written permission of the Head of the Contracting Activity. When information, data, documentary material, records, and/or equipment is no longer required, it shall be returned to VHA control or the Contractor must hold it until otherwise directed. Items returned to the Government shall be hand-carried, mailed, emailed, or securely electronically transmitted to the Contracting Officer or address prescribed in the [contract vehicle]. Destruction of records is EXPRESSLY PROHIBITED unless in accordance with Paragraph (4). The Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material, and/or records generated under, or relating to, contracts. The Contractor (and any sub-contractor) is required to abide by Government and VHA guidance for protecting sensitive, proprietary information, classified, and controlled unclassified information. The Contractor shall only use Government IT equipment for purposes specifically tied to or authorized by the contract and in accordance with VHA policy. The Contractor shall not create or maintain any records containing any non-public VHA information that is not specifically tied to or authorized by the contract. The Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected from public disclosure by an exemption to the Freedom of Information Act. The VHA owns the rights to all data and records produced as part of this contract. All deliverables under the contract are the property of the U.S. Government for which VHA shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. Any Contractor rights in the data or deliverables must be identified as required by FAR 52.227-11 through FAR 52.227-20. Training.  All Contractor employees assigned to this contract who create, work with or otherwise handle records are required to take VHA-provided records management training. The Contractor is responsible for confirming training has been completed according to agency policies, including initial training and any annual or refresher training. [Note: To the extent an agency requires contractors to complete records management training, the agency must provide the training to the contractor.] D.  Flow down of requirements to subcontractors The Contractor shall incorporate the substance of this clause, its terms, and requirements including this paragraph, in all subcontracts under this [contract vehicle], and require written subcontractor acknowledgment of same. Violation by a subcontractor of any provision set forth in this clause will be attributed to the Contractor. ATTACHMENTS: The following list of documents are attached to this SOW for contractor use and incorporation into the project documents: Current Flooring Plans (see Attachment 1 - BLDG 650 Mather 2nd and 3rd Floor Carpet Replacement Current Flooring) Flooring to be used per room (Exhibit A - BLDG 650 2nd and 3rd Floors Room Flooring Replacement) NOTE: Contractor shall field verify accuracy of all attachments and RFI if something is not clear. END OF STATEMENT OF WORK
90%
Solicitation10/09/2026
VA Northern California Health Care System 612A4-27-018 Page 4 of 5 Statement of Work Replace B650 3rd and 2nd Flooring Project #612A4-27-018 General Intention: The purpose of this project is to replace flooring, resilient base, stainless steel corner guards, and paint throughout B650 3rd and 2nd Floor of the Sacramento Veterans Affairs Medical Center (VAMC) of VA Northern California Healthcare System (VANCHCS). Contractor shall furnish all labor and materials needed to perform all demolition, replacement, and installation required by this scope as required by specifications. Visits to the site by bidders may be made only by appointment with the Contracting Officer (CO) for the project. A preliminary/pre-proposal site visit is strongly encouraged and shall be coordinated with the Contracting Officer Representative (COR). Location of work; the geographic location for service(s) are the following areas: Sacramento VA Medical Center 10535 Hospital Way Mather, CA 95655 Buildings: 650 3rd and 2nd Floors The contractor shall consider that there are no staging areas available within the facility premises. If necessary, staging areas may be put into effect at the discretion of the COR, depending on availability. The Contractor shall note that there is absolutely NO Contractor employee parking in Patient Parking designated areas. VANCHCS will not invalidate or make reimbursement for parking violations for the Contractor under any conditions. The contractor will be responsible for disposing of all equipment components and trash demolished or replaced as part of this project. The contractor is responsible for following infection control procedures per VA specifications and site infection control protocols. Schedule of work: All work shall be performed outside of normal working hours, which are 7:30 AM to 4:00 PM, Monday through Friday, excluding weekends and holidays unless approved by the CO. Work during normal hours may only be scheduled if it is planned at least three weeks in advance for a specific location and approved by the appropriate VA personnel. Any work activities that generate noise or disruption sufficient to impact patient care, disturb patients, or interfere with staff operations must be conducted only after normal working hours or on weekends. The contractor is responsible for coordinating with VA COR to ensure all work scheduling complies with this requirement and must provide notification of planned work at least three weeks prior to commencement. Emergency work or exceptions to this schedule must be requested in writing and approved by the CO. The Contractor shall prepare any necessary construction documents and provide all necessary/required professional engineering services to include, but not limited to tools, equipment, materials, labor, travel, expertise, supervision, testing, analysis, and specialty services to accomplish all items and requirements outlined in this SOW. All work shall comply with all applicable federal, state, local and VA regulations and requirements. Scope of Work: The contractor shall replace approximately 38,000 square feet (SF) of carpet and luxury vinyl tile throughout Building 650 3rd and 2nd Floors as shown in Exhibit A - BLDG 650 2nd and 3rd Floors Room Flooring Replacement and Attachment 1 - BLDG 650 Mather 2nd and 3rd Floor Carpet Replacement Current Flooring. Resilient wall base shall also be replaced at all spaces that will receive new flooring. The Contractor shall refer to Specification Section 09 06 00, Schedules for Finishes, for the products and finishes required under this contract. The Contractor shall furnish the specified products or an equivalent product that meets or exceeds all requirements of the specified product, including, as applicable, quality, performance, durability, compatibility, dimensions, appearance, finish, color, and warranty requirements. The proposed product shall be similar in appearance and shall match the color, texture, pattern, and finish of the specified product to the satisfaction of VA Engineering. The Contractor shall submit product data, samples, color charts, and other information necessary for VA Engineering s evaluation and approval. Attachment 1 - BLDG 650 Mather 2nd and 3rd Floor Carpet Replacement Current Flooring shows current carpet with red lines across rooms or spaces that will remain the same (no change in these). Exhibit A - BLDG 650 2nd and 3rd Floors Room Flooring Replacement states room by room current flooring and resilient base to be installed. The Contractor shall refer to Specification Section 09 06 00, Schedules for Finishes, for the products and finishes required under this contract. The Contractor shall furnish the specified products or an equivalent product that meets or exceeds all requirements of the specified product, including, as applicable, quality, performance, durability, compatibility, dimensions, appearance, finish, color, and warranty requirements. The proposed product shall be similar in appearance and shall match the color, texture, pattern, and finish of the specified product to the satisfaction of VA Engineering. The Contractor shall submit product data, samples, color charts, and other information necessary for VA Engineering s evaluation and approval. The contractor shall remove and install new accessories associated with the flooring. Carpet and luxury vinyl tiles to include, but not limited to, subfloors, carpet tack strips, carpet padding, and vinyl glue. The contractor shall paint all rooms located on the 2nd and 3rd floors of Building 650 per specification Section 09 06 00, Schedule of Finishes. The Contractor shall furnish the specified products or an equivalent product that meets or exceeds all requirements of the specified product, including, as applicable, quality, performance, durability, compatibility, dimensions, appearance, finish, color, and warranty requirements. The proposed product shall be similar in appearance and shall match the color, texture, pattern, and finish of the specified product to the satisfaction of VA Engineering. The Contractor shall submit product data, samples, color charts, and other information necessary for VA Engineering s evaluation and approval. The contractor shall anticipate repairing up to 20% of the drywall surface area in each room as needed to ensure a uniform and high-quality finish. All drywall repairs must be completed to meet VA standards and industry best practices before any painting activities commence. The contractor is responsible for providing all necessary materials, labor, and equipment to complete both the repair and painting work. The VA will provide a paint plan as the installation date approaches. The contractor shall replace all existing plastic corner guards with new stainless steel corner guards to match exact material per specification Section 09 06 00, Schedules for Finishes or an equivalent. For installation purposes and material lengths, the contractor shall follow wall mockup located outside the Engineering Suite at Building 650. Contractor to coordinate visit with COR. Contractor shall take into consideration that additional corner guards up to 10 additional might be needed upon request of the VA. The contractor shall meet with the COR to discuss and outline phasing requirements for the project. These phasing requirements shall describe the general sequence of the project work, estimated project duration, and what Government constraints will exist that will influence the Contractor s approach to the construction project. The Sacramento VAMC is an active hospital and therefore will require consideration to those areas with patients and staff. The contractor shall be responsible for the administration and management of all aspects of this SOW. This includes responsibility for all Contractor employees, Subcontractors, Agents, and anyone acting for or on behalf of the Contractor. This project is to take no longer than 240 calendar days from notice to proceed (NTP). If work is approved during the week (Monday Friday), the contractor will be assigned no more than five (5) rooms at a time in which to perform work. Additional rooms will only be assigned upon satisfactory completion and inspection of the previously assigned rooms. This approach is intended to ensure quality control, minimize disruption to facility operations, and allow for efficient project management. The contractor shall coordinate with the COR regarding room assignments and completion timelines. Construction: Do not block doorways. Do not store material other than the worksite currently being worked on. Ensure GFCIs are used for all electrical tools. Remove any site obstructions. Maintain proper housekeeping. Maintain dust control to follow requirements in the ICRA permit class. Always use dust mats in place and secure work areas. Use dust barrier zipper doors at each work area. Use plastic sheeting to cover all furniture at each work area if furniture is not being removed. Post Construction: Contractor shall clean all construction areas and remove all construction debris from site. Contractor shall walk the project with the COR; project is not complete until COR provides final acceptance. Specification and Drawings for Contractor: Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense. Records Management Requirements: A.  Applicability This clause applies to all Contractors whose employees create, work with, or otherwise handle Federal records, as defined in Section B, regardless of the medium in which the record exists.  B.  Definitions Federal record as defined in 44 U.S.C. § 3301, includes all recorded information, regardless of form or characteristics, made or received by a Federal agency under Federal law or in connection with the transaction of public business and preserved or appropriate for preservation by that agency or its legitimate successor as evidence of the organization, functions, policies, decisions, procedures, operations, or other activities of the United States Government or because of the informational value of data in them.  The term Federal record: includes VHA records. does not include personal materials. applies to records created, received, or maintained by Contractors pursuant to their VHA contract. may include deliverables and documentation associated with deliverables. C.  Requirements Contractor shall comply with all applicable records management laws and regulations, as well as National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. chs. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of 1974 (5 U.S.C. 552a). These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion. In accordance with 36 CFR 1222.32, all data created for Government use and delivered to, or falling under the legal control of, the Government are Federal records subject to the provisions of 44 U.S.C. chapters 21, 29, 31, and 33, the Freedom of Information Act (FOIA) (5 U.S.C. 552), as amended, and the Privacy Act of 1974 (5 U.S.C. 552a), as amended and must be managed and scheduled for disposition only as permitted by statute or regulation. In accordance with 36 CFR 1222.32, the Contractor shall maintain all records created for Government use or created in the course of performing the contract and/or delivered to, or under the legal control of the Government and must be managed in accordance with Federal law. Electronic records and associated metadata must be accompanied by sufficient technical documentation to permit understanding and use of the records and data. VHA and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Records may not be removed from the legal custody of VHA or destroyed except in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the Contracting Activity. Willful and unlawful destruction, damage, or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. In the event of any unlawful or accidental removal, defacing, alteration, or destruction of records, the Contractor must report to VHA. The agency must report promptly to NARA in accordance with 36 CFR 1230. The Contractor shall immediately notify the appropriate Contracting Officer upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records, or equipment. Disclosure of non-public information is limited to authorized personnel with a need-to-know as described in the [contract vehicle]. The Contractor shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records, and/or equipment is properly protected. The Contractor shall not remove material from Government facilities or systems, or facilities or systems operated or maintained on the Government s behalf, without the express written permission of the Head of the Contracting Activity. When information, data, documentary material, records, and/or equipment is no longer required, it shall be returned to VHA control or the Contractor must hold it until otherwise directed. Items returned to the Government shall be hand-carried, mailed, emailed, or securely electronically transmitted to the Contracting Officer or address prescribed in the [contract vehicle]. Destruction of records is EXPRESSLY PROHIBITED unless in accordance with Paragraph (4). The Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material, and/or records generated under, or relating to, contracts. The Contractor (and any sub-contractor) is required to abide by Government and VHA guidance for protecting sensitive, proprietary information, classified, and controlled unclassified information. The Contractor shall only use Government IT equipment for purposes specifically tied to or authorized by the contract and in accordance with VHA policy. The Contractor shall not create or maintain any records containing any non-public VHA information that is not specifically tied to or authorized by the contract. The Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected from public disclosure by an exemption to the Freedom of Information Act. The VHA owns the rights to all data and records produced as part of this contract. All deliverables under the contract are the property of the U.S. Government for which VHA shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. Any Contractor rights in the data or deliverables must be identified as required by FAR 52.227-11 through FAR 52.227-20. Training.  All Contractor employees assigned to this contract who create, work with or otherwise handle records are required to take VHA-provided records management training. The Contractor is responsible for confirming training has been completed according to agency policies, including initial training and any annual or refresher training. [Note: To the extent an agency requires contractors to complete records management training, the agency must provide the training to the contractor.] D.  Flow down of requirements to subcontractors The Contractor shall incorporate the substance of this clause, its terms, and requirements including this paragraph, in all subcontracts under this [contract vehicle], and require written subcontractor acknowledgment of same. Violation by a subcontractor of any provision set forth in this clause will be attributed to the Contractor. ATTACHMENTS: The following list of documents are attached to this SOW for contractor use and incorporation into the project documents: Current Flooring Plans (see Attachment 1 - BLDG 650 Mather 2nd and 3rd Floor Carpet Replacement Current Flooring) Flooring to be used per room (Exhibit A - BLDG 650 2nd and 3rd Floors Room Flooring Replacement) NOTE: Contractor shall field verify accuracy of all attachments and RFI if something is not clear. END OF STATEMENT OF WORK
90%
Solicitation10/09/2026

Additional Details

Solicitation Number

36C26127Q0081

Archive Date

Jan 23, 2027

Office Address

MATHER, CA, 95655