Notice ID: 9b4c1fd96e7a1f83b2f05dabd47d2680Combined Synopsis/Solicitation
Craig Flooring
Archived on May 26, 2018. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 2:00 PM UTC−10:00
- Posted
- May 3, 2018
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 236118: Residential Remodelers
- Agency
- Department of AgricultureFOREST SERVICE
Notice details
- Office
- Alaska Regional Office, R10
- Place of performance
- The project is located at the U.S. Forest Service Craig Ranger District Housing Apartments at 905 Beach Street Apt. #7 in Craig, Alaska 99921. Craig is accessible by vehicle via the Prince of Wales ferry or floatplane out of Ketchikan, Alaska 99901., Craig, AK, 99921
- PSC
- 56: CONSTRUCTION AND BUILDING MATERIAL
- Last updated
- Dec 4, 2025
Identifiers
- Solicitation number
- 12010918Q0051
- Notice ID
- 9b4c1fd96e7a1f83b2f05dabd47d2680
Description
THE SCHEDULE Supplies or Services and Prices/Costs SECTION B - SCHEDULE OF ITEMS Contract Line Items (CLINs): Base Items ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT 1 Carpet Removal and Disposal 1 LS $ $ 2 Laminate Flooring Installation 1 LS $ $ 3 Shipping/Transportation 1 LS $ $ TOTAL $ ABBREVIATIONS: LS = Lump Sum NOTE: OFFERORS must submit prices for all items included in the price schedule. SECTION C- DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK C-1. Scope The scope of this project includes the repair, maintenance and alteration to the buildings at the Craig Ranger District Apartments. Base bid work includes replacing the carpet in apartment #7 with laminate flooring. C-2. General Description Description: This project includes the removal and disposal of carpet and carpet pad in apartment #7 of the Craig apartment complex and shall be replaced with laminate flooring and underlayment. C-3. Project Location and Facilities The project is located at the U.S. Forest Service Craig Ranger District Housing Apartments at 905 Beach Street Apt. #7 in Craig, Alaska 99921. Craig is accessible by vehicle via the Prince of Wales ferry or floatplane out of Ketchikan, Alaska 99901. C-4. Resources Provided by the Contractor Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies, and perform all work required to complete the project in accordance with drawings, specifications, and provisions of the contract. All appurtenances, fasteners, hardware, and connections to make a complete and useable system are considered incidental to the work items. Price Range The magnitude of construction is estimated to be: Less than $25,000.00 C-5. Period of Performance May 20, 2018 through September 30, 2018 C-6. Special Conditions a. Design and construction will meet the current versions of federal, state, local ordinances, and model building codes. b. Contractor will be responsible for daily cleanup of all construction debris. c. Existing installed construction and equipment to remain will be inspected prior to onsite work. Contractor will protect this existing construction and equipment from damage during construction. d. Contractor shall repair any damage to facilities or site affected by the work. e. All items to be removed become the property of the contractor. f. All material shall be delivered, stored, handled, and installed per manufacturer's specifications and recommendations. g. Drawings and dimensions included in contract are for reference only. Contractor is responsible to verify dimensions and quantities prior to ordering materials etc. h. Government provided housing is not available. i. Electric and water service is available at the site. j. Material storage is allowed on-site during construction. However, indoor storage space is limited. Location(s) to be approved by Contracting Officer (CO). C-7. Work Items a. New Flooring 1) Demolition: Remove all existing carpet, underlayment, and trim or otherwise prepare floor per manufacturer recommendation. Vinyl and trim in kitchen and bathrooms to remain. 2) Subfloor Prep: Treat subfloor for pet odor removal. This Includes: i. Treat stains with cleaner formulated for pet urine until smell is removed. Do not use cleaners containing ammonia. ii. Seal entire floor with 1-2 coats of primer, such as solvent-based Kilz or approved equal. 3) Laminate Flooring: Install approximately 600 SF of underlayment and laminate flooring in place of the existing carpet throughout the apartment which includes the hallway, living room, bedrooms, and adjacent closets. Provide transition strips between existing vinyl flooring and new laminate flooring. 4) Trim: Remove and replace all baseboard trim, with new trim, at new flooring. Trim shall be prefinished and/or painted bright white. Provide transitions to existing trim in kitchen and other needed areas. 5) Finishes: See specification sections and submit for approval for COR before ordering. 6) Install per IRC requirements C-8. Notification and Maintenance of Work Schedule At the pre-work meeting, provide a proposed schedule of work showing beginning and completion dates of salient work items for the Contracting Officer's approval. Contractor shall maintain the schedule up to date, and provide it to the Contracting Officer upon request. Also incorporated into this contract is FAR 52.236-15, Schedules for Construction Contracts. C-9. Specifications Index- By Division 01 25 00 Substitution Procedures 01 33 00 Submittal Procedures 02 41 00 Demolition 09 65 00 Laminate Plank Flooring SECTION 01 25 00 SUBSTITUTION PROCEDURES PART 1 - GENERAL 1.1 SUMMARY A. Section includes administrative and procedural requirements for substitutions. 1.2 ACTION SUBMITTALS A. Substitution Requests: Submit three copies of each request for consideration. Identify product or fabrication or installation method to be replaced. Include Specification Section number and title and Drawing numbers and titles. 1. Documentation: Show compliance with requirements for substitutions and the following, as applicable: a. Statement indicating why specified product or fabrication or installation method cannot be provided, if applicable. b. Coordination of information, including a list of changes or revisions needed to other parts of the Work and to construction performed by Owner and separate contractors that will be necessary to accommodate proposed substitution. c. Detailed comparison of significant qualities of proposed substitutions with those of the Work specified. Include annotated copy of applicable Specification Section. Significant qualities may include attributes, such as performance, weight, size, durability, visual effect, sustainable design characteristics, warranties, and specific features and requirements indicated. Indicate deviations, if any, from the Work specified. d. Product Data, including drawings and descriptions of products and fabrication and installation procedures. e. Samples, where applicable or requested. f. Certificates and qualification data, where applicable or requested. g. List of similar installations for completed projects, with project names and addresses as well as names and addresses of architects and owners. h. Material test reports from a qualified testing agency, indicating and interpreting test results for compliance with requirements indicated. i. Research reports evidencing compliance with building code in effect for Project, from ICC-ES. j. Detailed comparison of Contractor's construction schedule using proposed substitutions with products specified for the Work, including effect on the overall Contract Time. If specified product or method of construction cannot be provided within the Contract Time, include letter from manufacturer, on manufacturer's letterhead, stating date of receipt of purchase order, lack of availability, or delays in delivery. k. Cost information, including a proposal of change, if any, in the Contract Sum. l. Contractor's certification that proposed substitution complies with requirements in the Contract Documents, except as indicated in substitution request, is compatible with related materials and is appropriate for applications indicated. m. Contractor's waiver of rights to additional payment or time that may subsequently become necessary because of failure of proposed substitution to produce indicated results. 2. Owner's Action: If necessary, Contracting Officer will request additional information or documentation for evaluation within 15 days of receipt of a request for substitution. Contracting Officer will notify Contractor of acceptance or rejection of proposed substitution within 15 days of receipt of request, or seven days of receipt of additional information or documentation, whichever is later. a. Forms of Acceptance: Change Order, Construction Change Directive, or Supplemental Instructions for minor changes in the Work. b. Use product specified if Contracting Officer does not issue a decision on use of a proposed substitution within time allocated. 1.3 PROCEDURES A. Coordination: Revise or adjust affected work as necessary to integrate work of the approved substitutions. 1.4 SUBSTITUTIONS A. Substitutions for Cause: Submit requests for substitution immediately on discovery of need for change, but not later than 15 days prior to time required for preparation and review of related submittals. 1. Conditions: Contracting Officer will consider Contractor's request for substitution when the following conditions are satisfied. If the following conditions are not satisfied, Contracting Officer will return requests without action, except to record noncompliance with these requirements: a. Requested substitution is consistent with the Contract Documents and will produce indicated results. b. Substitution request is fully documented and properly submitted. c. Requested substitution will not adversely affect Contractor's construction schedule. d. Requested substitution has received necessary approvals of authorities having jurisdiction. e. Requested substitution is compatible with other portions of the Work. f. Requested substitution has been coordinated with other portions of the Work. g. Requested substitution provides specified warranty. h. If requested substitution involves more than one contractor, requested substitution has been coordinated with other portions of the Work, is uniform and consistent, is compatible with other products, and is acceptable to all contractors involved. SECTION 01 33 00 SUBMITTAL PROCEDURES PART 1 - GENERAL 1.01 DESCRIPTION A. Reviewing, Certifying, Approving Authority: Contractor shall be responsible for reviewing and certifying that submittals are in compliance with contract requirements. B. Scheduling: Allow review period, beginning with receipt by approving authority that includes at least 10 working days for submittals for contracting officer approval. Period of review for submittals with contracting officer approval begins when Government receives submittal from contractor. Period of review for each resubmittal is the same as for initial submittal. C. Variations: Variations from contract requirements require Government approval pursuant to contract Clause entitled "FAR 52.236-21, Specifications and Drawings for Construction" and will be considered where advantageous to government. D. All products identified in these specifications shall require approved submittals prior to installation. E. Finishes: See specification sections and submit for approval by COR before ordering. Submit all paint colors and flooring, as one submittal to be coordinated for approval. SECTION 02 41 00 DEMOLITION PART 1 - GENERAL 1.01 DESCRIPTION A. This section covers the furnishing of materials, labor, and equipment required to partially or entirely remove and/or demolish those items identified in this contract and restore any disturbed areas or components impacted by demolition. 1.02 JOB CONDITIONS A. Protection: Ensure safe passage of persons around area of demolition. Conduct operations to prevent injury to adjacent buildings, structures, and persons. B. Damages: Promptly repair damages caused to adjacent structures by demolition operations at no cost to the Owner. a. This includes any damages to the drywall not covered by baseboard trim. PART 2 - PRODUCTS Not applicable. PART 3 - EXECUTION 3.01 DISPOSAL OF DEMOLISHED MATERIALS A. All debris, rubbish, and other materials resulting from demolition operations and not identified as salvageable by the Owner's Representative shall be removed from National Forest System Land. B. Burning of removed materials will not be permitted on site. SECTION 09 65 00 LAMINATE PLANK FLOORING PART 1 - GENERAL 1.01 DESCRIPTION A. This section covers the furnishing of materials, labor, and equipment required for the installation of plank flooring. Incidental work includes preparation of substrate to laminate plank flooring system. 1.02 SUBMITTAL A. Submit product samples for CO approval prior to ordering materials for project. Submit with other paint and interior color samples. PART 2 - PRODUCTS 2.01 MATERIALS A. Flooring a. Laminate flooring: Dream Home X2O i. Minimum Thickness: 12 mm ii. Use pre-attached padding if available iii. Use Highly Water-Resistant Laminate Flooring iv. Pattern/color: Skyline Oak or approved equal. Submit color for approval. v. Furnish one additional box to CO for future replacements B. Underlayment a. APA Underlayment rated plywood or approved equal. b. Sound deadening: Bellawood Premium underlayment C. Molding, Trim and Accessories a. Baseboard height: shall extend minimum of 5 inches from laminate b. Nails: ring shanked underlayment nails c. Supply all accessories needed for installation to comply with manufactures instructions and code compliance. Molding sections shall be from the same manufacturer and coloring as the flooring. PART 3 - EXECUTION 3.01 INSTALLATION A. Install flooring system in compliance with the manufacturer's specifications. Provide any underlayments, adhesives, or other to provide a complete system per the manufacturer's instructions. B. Remove existing carpet and prepare existing subfloor for laminate installation. C. Install sound deadening underlayment. D. Cover all flooring edges, seams and transitions with appropriate trim and molding sections. E. Provide appropriate transitions between existing trim in areas to remain and new trim. F. Provide transition strips including any "ramps" to not exceed ABA accessibility requirements, and as quoted below: a. 303.2 Vertical. Changes in level of (6.4mm) high maximum shall be permitted to be vertical. b. 303.3 Beveled. Changes in level between (6.4mm) high minimum and inch (13 mm) high maximum shall be beveled with a slope not steeper than 1:2. c. 303.4 Ramps. Changes in level greater than inch (13 mm) high shall be ramped, and shall comply with 405 or 406. PACKAING AND MARKING Project Labeling for Official Correspondence The Government singularly identifies each project with a contract number at time of award. The contract number is a unique identifier to purposely and permanently represent an awarded project. The Government issued contract number is to be referenced on all official communication starting upon notice of award. INSPECTION AND ACCEPTANCE 52.246-12 Inspection of Construction (AUG 1996) DELIVERIES OR PERFORMANCE FAR 52.242-14 Suspension of Work (APR 1984) FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984) The Contractor shall be required to (a) commence work under this contract within 15 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 60 days after receipt of notice to proceed. The time stated for completion shall include final cleanup of the premises. CONTRACT ADMINISTRATION DATA AGAR 452.215-73 Post Award Conference (NOV 1996) A post award or pre-work conference with the successful offeror is required. It will be scheduled and held within a reasonable time after award and prior to the issuing of a Notice to Proceed. Electronic Invoicing and Payment Requirements - Invoice Processing Platform (IPP) (a) Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform (IPP). "Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract. The IPP website address is: https://www.ipp.gov The Contractor must use the IPP website to register, access and use IPP for submitting requests for payment. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fms.treas.gov or phone (866) 973-3131. (b) Final Payment. The final invoice must be accompanied by a release of claims against the Government arising by virtue of this contract, other than claims, in stated amounts, that the Contractor has specifically accepted from the operation of the release. Final payment will not be approved without a properly executed Contract Release, Form 6300-16. (c) In addition, when submitting the invoice, the Contractor shall submit payrolls, subcontractor payment information and a spreadsheet detailing the payment breakdown in accordance with the Pay Items in the Schedule of Items, Section B.1 (either electronically in IPP, hard copy, or via fax) to the Contracting Officer (see FAR 52.232-5 Payments Under Fixed Price Construction Contracts). Contract Administration This contract will be administered by the Contracting Officer located at: Alaska Region Attn: CO Della Koelling 709 West 9th Street Juneau, AK 99801 dkoelling@fs.fed.us All matters related to the performance of this contract shall be coordinated through the Contracting Officer. Designation of Contracting Officer's Representative The Contracting Officer designates the Contracting Officer's Representative(s) (COR). The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by proper contractual documents executed by the Contracting Officer prior to completion of the contract. The Contracting Officer should be informed as soon as possible of any actions or inactions by the Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual task assignments which were issued by the COR provided they do not affect the delivery schedule or performance period stated in the contract.) On all matters that pertain to the contract terms, the Contractor must communicate with the Contracting Officer. Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR. If the COR persists and there still exists a disagreement as to proper contractual coverage, the Contracting Officer should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim. Contractor's Designated Representative It is required that the Contractor have a designated representative available on the project during the entire project and that the representative be able to speak and understand English. When designating a representative, the Contractor shall furnish a copy of the designation in writing to the Contracting Officer. Such designation shall clearly indicate the name and limitations (if any) of authority of the representative. If the Contractor intends to designate a representative prior to the pre-work meeting, the representative is strongly encouraged to attend that meeting. SPECIAL CONTRACT REQUIREMENTS FAR 52.236-14 Availability and Use of Utility Services (APR 1984) Worker's Compensation Laws Alaska state law requires that all employers have Worker's Compensation Insurance for their employees. The Forest Service furnishes contract award information to the Alaska Department of Labor. Failure to comply with the state worker's compensation laws can be a felony offense in Alaska. The Alaska Workers' Compensation Division can also fine employers up to $1,000 per employee for each day they are conducting business with employee labor without the required insurance. For the definitions of "employer", "employee", and "subcontractor", and other pertinent information contact: Alaska Department of Labor Workers Compensation Division Special Investigations Unit P.O. Box 115512 Juneau, AK 99802-5521 907.465.5875 (Direct) 1-888-372-8330 (toll free), 907.465-2797 (FAX) The Contractor shall be responsible for and perform road maintenance commensurate with his use of Forest Service roads in the construction area. SIMPLIFIED ACQUISITION TERMS & CONDITIONS: CONSTRUCTION FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES 52.204-18 Commercial and Government Entity Code Maintenance (JUL 2016) 52.204-19 Incorporation by Reference of Representations and Certifications (DEC 2014) The Contractor's representations and certifications, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract. 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (NOV 2015) 52.211-18 Variation in Estimated Quantity (APR 1984) 52.213-4 Terms and Conditions-Simplified Acquisitions (Other Than Commercial Items) (NOV 2017) (c) fill in: www.acquisition.gov/far/ www.usda.gov/procurement/policy/agar.html 52.217-7 OPTION FOR INCREASED QUANTITY - SEPARATELY PRICE LINE ITEM (MAR 1989) Insert: prior to Contractor removing equipment and employees from the work site. 52.219-6 Notice of Total Small Business Set-Aside (NOV 2011) 52.219-28 Post-Award Small Business Program Rerepresentation (JUL 2013) 52.222-6 Construction Wage Rate Requirements (MAY 2014) 52.222-7 Withholding of Funds (MAY 2014) 52.222-8 Payrolls and Basic Records (MAY 2014) 52.222-9 Apprentices and Trainees (JUL 2005) 52.222-10 Compliance with Copeland Act Requirements (FEB 1988) 52.222-11 Subcontracts (Labor Standards) (MAY 2014) 52.222-12 Contract Termination - Debarment (MAY 2014) 52.222-13 Compliance with Construction Wage Requirements and Related Regulations (MAY 2014) 52.222-14 Disputes Concerning Labor Standards (FEB 1988) 52.222-15 Certification of Eligibility (MAY 2014) 52.222-21 Prohibition of Segregated Facilities 52.222-26 Equal Opportunity (SEP 2016) 52.222-27 Affirmative Action Compliance Requirements for Construction (May 2014) 52.223-2 Affirmative Procurement of Bio-based Products under Service and Construction Contracts (SEP 2013) 52.223-17 Affirmative Procurement of EPA-designated Items in Service and Construction Contracts (MAY 2008) 52.223-18 Contractor Policy to Ban Text Messaging While Driving (AUG 2011) 52.225-9 Buy American Act-Construction Materials (MAY 2014) (a) Definitions. As used in this clause-- "Commercially available off-the-shelf (COTS) item"- (1) Means any item of supply (including construction material) that is- (i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101); (ii) Sold in substantial quantities in the commercial marketplace; and (iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and (2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products. "Component" means an article, material, or supply incorporated directly into a construction material. "Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material. "Cost of components" means-- (1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or (2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material. "Domestic construction material" means- (1) An unmanufactured construction material mined or produced in the United States; (2) A construction material manufactured in the United States, if- (i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or (ii) The construction material is a COTS item. "Foreign construction material" means a construction material other than a domestic construction material. "United States" means the 50 States, the District of Columbia, and outlying areas. (b) Domestic preference. (1) This clause implements the 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause. (2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows: ______ [Contracting Officer to list applicable excepted materials or indicate "none"] (3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that (i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent; (ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or (iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality. (c) Request for determination of inapplicability of the Buy American statute. (1) (i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including-- (A) A description of the foreign and domestic construction materials; (B) Unit of measure; (C) Quantity; (D) Price; (E) Time of delivery or availability; (F) Location of the construction project; (G) Name and address of the proposed supplier; and (H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause. (ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause. (iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued). (iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination. (2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause. (3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute. (d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers: Foreign and Domestic Construction Materials Price Comparison Construction material description Unit of measure Quantity Price (dollars) * Item 1 Foreign construction material Domestic construction material Item 2 Foreign construction material Domestic construction material [List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.] [Include other applicable supporting information.] [*Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).] 52.227-4 Patent Indemnity - Construction Contracts (DEC 2007) 52.232-5 Payments under Fixed-Price Construction Contracts (MAY 2014) 52.232-23 Assignment of Claims (MAY 2014) 52.232-27 Prompt Payment for Construction Contracts (JAN 2017) 52.236-2 Differing Site Conditions (APR 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (APR 1984) 52.236-5 Material and Workmanship (APR 1984) 52.236-6 Superintendence by the Contractor (APR 1984) 52.236-7 Permits and Responsibilities (NOV 1991) 52.236-8 Other Contracts (APR 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (APR 1984) 52.236-10 Operations and Storage Areas (APR 1984) 52.236-11 Use and Possession Prior to Completion (APR 1984) 52.236-12 Cleaning Up (APR 1984) 52.236-13 Accident Prevention (NOV 1991) Alternate I (NOV 1991) 52.236-16 Quantity Surveys (APR 1984) Alternate I (APR 1984) 52.236-17 Layout of Work (APR 1984) 52.236-21 Specifications and Drawings for Construction (FEB 1997) Alternate I (APR 1984) Alternate II (APR 1984) 52.236-26 Preconstruction Conference (FEB 1995) 52.243-5 Changes and Changed Conditions (APR 1984) 52.244-6 Subcontracts for Commercial Items (JAN 2017) 52.245-1 Government Property (JAN 2017) 52.245-9 Use and Charges (APR 2012) 52.246-21 Warranty of Construction (MAR 1994) Alternate I (APR 1984) 52.249-1 Termination for Convenience of the Government (Fixed-Price) (Short Form). (Apr 1984) 52.249-10 Default (Fixed-Price Construction) (APR 1984) 52.252-2 Clauses Incorporated by Reference. (Feb 1998) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): www.acquisition.gov. AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES 452.236-71 Prohibition Against the Use of Lead-Paint (NOV 1996) 452.236-72 Use of Premises (NOV 1996) 452.236-73 Archeological or Historic Sites (FEB 1988) 452.236-74 Control of Erosion, Sedimentation and Pollution (NOV 1996) 452.236-77 Emergency Response (NOV 1996) LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS The following attachments are made a part of this solicitation an...
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
12010918Q0051- Combined Synopsis
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
12010918Q0051
Archive Date
May 26, 2018
Office Address
JUNEAU, AK, 99802