GovChime
Notice ID: 2e8320c897104d9c8da01d8c8fc80c51Award NoticeAwarded

Bridgeport RD Water Treatment System Construction

Awarded on May 31, 2018. Full description on SAM.gov.

Awarded tounder 12026118C0006 (source: SAM.gov award notice)• $449.6K

Overview

Posted
June 1, 2018
Notice type
Award Notice
Agency
Department of AgricultureFOREST SERVICE

Notice details

Office
Boise National Forest
Place of performance
Bridgeport CA, Administrative Site, Bridgeport, CA, 93517
PSC
Y: CONSTRUCT OF STRUCTURES/FACILITIES
Last updated
Dec 4, 2025
Award date
May 31, 2018
Award amount (SAM.gov award notice)
$449.6K

Identifiers

Solicitation number
12026118R0001
Notice ID
2e8320c897104d9c8da01d8c8fc80c51
Award number (PIID)
12026118C0006

Description

THIS PROJECT WILL BE AVAILABLE FOR REVIEWING AND PRINTING IN APPROXIMATELY 15 DAYS. BRIDGEPORT RD WATER TREATMENT SYSTEM CONSTRUCTION-HUMBOLDT-TOIYABE NATIONAL FOREST The project includes construction of a new water treatment system for the administrative site. Demolition work includes: Removing the existing well pump and controls. Removing the exiting utility box. Removing portions of the existing waterline. Work includes the following: Installing a new packaged coagulation/filtration water treatment system and booster pump. Installing a new building to house the treatment system. Installing utility connections to the new building: electrical, water, communications and wastewater for the backwash system. Grading around the building and installing new exterior concrete slabs. Installing a new septic tank and drainfield (for backwash water). Installing a new well screen in the existing well. Installing a new well pump and controls. PROJECT LOCATION The Bridgeport administrative site is on the Bridgeport Ranger District of the Humboldt-Toiyabe National Forest. It is located in Mono County, California, approximately 1 mile North and 3-1/2 miles West of Bridgeport, California (approximately 4 miles by road from Bridgeport along U.S. Highway 395). It is located at approx. Latitude 38°16'37.36"N, Longitude 119°17'20.64"W, and in the SE 1/4 of Section 23, T5N, R24E, at an elevation of approximately 6600 feet. Estimated Start Date: Summer 2018, contract time 180 Calendars Days. NAICS: 221310, $27.5M

Full description on SAM.gov

Award Overview

Award Number

12026118C0006

Award Amount (SAM.gov award notice)

$449.6K

Award Date

May 31, 2018

Awardee

Awardee UEI

SGP6V9ZNX2N6

Original Solicitation

Notice ID: 2e8320c897104d9c8da01d8c8fc80c51

Posted Date: Jun 1, 2018

Original Response Deadline: Not specified

Contacts

Documents

No documents available.

Lifecycle

Solicitation:12026118R0001
  1. Pre-Solicitation
  2. Solicitation
  3. Awarded

This opportunity has been awarded.

  1. 6×
    Pre-SolicitationFeb 8, 2018

    Bridgeport RD Water Treatment System Construction

    Notice 5f824f64565922b0b6c64e5556866313 on SAM.gov

  2. SolicitationApr 13, 2018

    Bridgeport RD Water Treatment System Construction

    Notice 7b0cccd6521381387508bcea7aceb8a9 on SAM.gov

  3. AwardedCurrentJun 1, 2018

    Bridgeport RD Water Treatment System Construction

    Notice 2e8320c897104d9c8da01d8c8fc80c51 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

12026118R0001

Archive Date

Jul 16, 2019

Office Address

BOISE, ID, 83709