Notice ID: 0bb3f8daed84c826537e05542dd0fbebAward NoticeAwarded
Timberline Lodge Hydrant Loop Replacement
Awarded on June 18, 2019. Full description on SAM.gov.
Awarded tounder 12046W19C0008 (source: SAM.gov award notice)• $473.7K
Overview
- Posted
- June 19, 2019
- Notice type
- Award Notice
Notice details
- Place of performance
- 27500 E. Timberline Road, Government Camp, OR, 97028
- PSC
- Z: MAINT, REPAIR, ALTER REAL PROPERTY
- Last updated
- Dec 4, 2025
- Award date
- Jun 18, 2019
- Award amount (SAM.gov award notice)
- $473.7K
Identifiers
- Solicitation number
- 12046W19R0005
- Notice ID
- 0bb3f8daed84c826537e05542dd0fbeb
- Award number (PIID)
- 12046W19C0008
Description
The purpose of this project is to replace the existing fire hydrant loop around the Historic Timberline Lodge, lodge and existing hydrant loop were constructed in the 1930's, with a new branching fire hydrant line meeting present day fire code requirements. The Historic Lodge is located at tree line (approx. 6000 ft elev.) on the flanks of Mt Hood, 60 miles from Portland OR and 70 miles for The Dalles OR. From the Mt Hood National Forest Headquarters (16400 Champion Way, Sandy, OR 97055) take highway 26 east for 30 miles then turn left onto Timberline Highway. Continue on Timberline Highway for 6 miles until it dead ends at the parking lot for the hotel. The Historic Lodge is run by a concessionaire (RLK) and operates as a hotel year round, accommodating skiers and snowboarders in the winter, and hosting weddings and events in the summer. This project will require considerable coordination with both the Forest Service and concessionaire (RLK) to assure minimal impacts to historical, environmental, and recreational resources. The Historic Lodge has a large amount of existing utilities that will need to be located prior to construction and carefully excavated around during construction. Additionally due to the high elevation, soil conditions, presence of sensitive species, and a short growing season the vegetation surrounding the lodge is fragile and susceptible. Construction operations will need to excavate carefully, sometimes by hand, around existing vegetation. Proposed excavation and revegetation will need to be approved by Forest Service specialists. Finally, construction operations and schedules will need to be communicated to the concessionaire (RLK) weekly to mitigate impacts to guests staying in the Historic Lodge. The proposed new hydrant line includes two branches, the West Branch and East Branch. The base bid includes the West Branch of the proposed system and bid option 1 includes the East Branch of the system. The base bid includes the following items associated with the West Branch: • Locating existing utilities that may intersect the proposed hydrant line • Demolition of existing paved road surfaces and paths under which the proposed hydrant line will be installed • Careful handling and storage of native vegetation that lies within clearing limits of trenching • Trenching to an average depth of 5ft to install hydrant main piping • Installing 18", 12", 10", 8" and 6" Ductile Iron pipe, accessories, and mechanical joints for an approx. 1000 ft long hydrant main • Installing three fire hydrants with valve box assemblies • Replacing current Fire Department Connection • Installing Air Release Valve • Backfilling over installed hydrant main with approved crushed rock and natural backfill • Reconstructing road surface, and paved paths demolished for trenching In-Kind • Testing fire hydrant performance for final acceptance • Providing the appropriate local, state, and federal permits Option 1 includes the following items associated with the East Branch: • Locating existing utilities that may intersect the proposed hydrant line • Demolition of existing paved road surfaces and paths under which the proposed hydrant line will be installed • Careful handling and storage of native vegetation that lies within clearing limits of trenching • Trenching to an average depth of 5ft to install hydrant main piping • Installing 8" and 6" Ductile Iron pipe, accessories, and mechanical joints for an approx. 500 ft long hydrant main • Installing one fire hydrant with valve box assembly, concrete pad, and bollards • Backfilling over installed hydrant main with approved crushed rock and natural backfill • Reconstructing road surface demolished for trenching In-Kind • Testing fire hydrant performance for final acceptance • Providing the appropriate local, state, and federal permits Estimated Construction Period: Mid-August 2019 to Mid-October 2019 THE SOLICITATION FOR THIS PROJECT WILL BE POSTED ON OR AROUND 04/18/2019 NOTE: Prior to proposal acceptance, offerors must be reqistered in the System for Award Management (SAM). https://www.sam.gov, including Online Representations and Certifications: FAR 52.212-3 (OCT2018)
Award Overview
Award Number
12046W19C0008
Award Amount (SAM.gov award notice)
$473.7K
Award Date
Jun 18, 2019
Awardee
Awardee UEI
DF9EJAWSEDG3
Original Solicitation
Notice ID: 0bb3f8daed84c826537e05542dd0fbeb
Posted Date: Jun 19, 2019
Original Response Deadline: Not specified
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
12046W19R0005- Pre-Solicitation
- Solicitation
- Awarded
This opportunity has been awarded.
- 4×Pre-SolicitationApr 3, 2019
Timberline Lodge Hydrant Loop Replacement
- SolicitationMay 30, 2019
Timberline Lodge Hydrant Loop Replacement
- AwardedCurrentJun 19, 2019
Timberline Lodge Hydrant Loop Replacement
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
12046W19R0005
Archive Date
Jul 3, 2019
Office Address
SANDY, OR, 97055