Notice ID: 11e54243e5ea491abc19859ce246f802Solicitation
Green Grouse Stewardship IRSC
Archived on December 31, 2024. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 4:00 PM UTC−07:00
- Posted
- August 24, 2020
- Notice type
- Solicitation
- NAICS
- 237310: Highway, Street, and Bridge Construction
- Agency
- Department of AgricultureFOREST SERVICE
Notice details
- Office
- PACIFIC NORTHWEST REGIONAL OFFICE
- Place of performance
- Granite Falls, 98252
- Last updated
- Sep 25, 2026
Identifiers
- Solicitation number
- 1204H120R4001
- Notice ID
- 11e54243e5ea491abc19859ce246f802
Description
The Green Grouse Project is located on the Darrington Ranger District of the Mt. Baker-Snoqualmie National Forest encompassing the area indicated on the Contract Area Map within South Fork Stillaguamish watershed near Granite Falls, Washington Restoration objectives for the project area are summarized as follows: Enhance habitat conditions for old forest associated species in late-successional reserves with emphasis on nesting habitat for marbled murrelet and northern spotted owls. Maintain and restore riparian vegetation composition and structural diversity, while protecting and enhancing fish habitat and aquatic organism passage. Contribute a supply of timber products to the public from the variable density stand thinning. Manage infrastructure and facilities within the South Fork Stillaguamish watershed to support not only the goals of the late-successional reserve, but also meet Tribal and recreational use within the watershed and to support administrative management of Forest lands. To accomplish these objectives, the contract includes the following components: variable density thinning, reconstruction of roads needed to access stands for thinning treatments followed by storing roads not needed for public access, invasive plant treatments along roads, decommissioning of temporary roads following timber harvest use, and road drainage and conditioning treatments. Mandatory work item in these units 57B to 86D includes cutting and removal of an estimated 58,197 TONS of sawlogs (trees 8.0 inches DBH and greater) from the contract area. Refer to Volume Summary and Specifications in Attachment #1. Mandatory work item in these units includes the road reconstruction and maintenance on the proposed haul route and on other unit roads deemed necessary for product removal. Contractor marking of leave trees will not be required prior to initiating operations. Trees designated for removal in work item are identified using the Designation by Description prescription included in Appendix B. Optional work items that may be ordered include treatment of invasive plants along roads within the contract area and road drainage and conditioning treatments on roads not used on the proposed haul route or deemed necessary for product removal. (b) Resulting Contract – Any resultant contract will be a Construction contract with requirements for timber removal. (c) Project Location – Project is in Township 31 North, Range 8 East, Sections 31, 31, and 32; Township 31 North, Range 8 East, Sections 3, 4, and 5, WM. Location: Township 31 North, Range 8 East, Sections 31, 31, and 32; Township 31 North, Range 8 East, Sections 3, 4, and 5, WM. Starting in Granite Falls WA at the roundabout of the intersection of Hwy 92 (Granite Falls Hwy) and Quarry Rd. Exit onto Quarry Rd and pass through 2 additional roundabouts for 0.2 miles then turn left onto Mountain Loop Hwy. Travel 6.9 miles and bear left onto National Forest Service Road 41 / Green Mountain Rd. Follow road for 1.8 miles and bear right onto National Forest Service Road 4110 driving about an additional 0.3 miles and entering National Forest Land and the general project area.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
No documents available.
Lifecycle
Solicitation:
1204H120R4001- Pre-Solicitation
- Solicitation
Award typically follows within 30–90 days after the response deadline. (estimate)
- 3×Pre-SolicitationMay 26, 2020
Green Grouse Stewardship IRSC
- SolicitationCurrentAug 24, 2020
Green Grouse Stewardship IRSC
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
1204H120R4001
Archive Date
Dec 31, 2024
Office Address
PORTLAND, OR, 97204