GovChime
Notice ID: 8711837d3ad8403f8c87988ac0b05cf3Solicitation

Wayne NF MATOC IDIQ ~ Roads and General Construction

Archived on July 30, 2021. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
2:00 PM UTC−04:00
Posted
July 8, 2021
Notice type
Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
237310: Highway, Street, and Bridge Construction
Agency
Department of AgricultureFOREST SERVICE

Notice details

Office
USDA-FS PPS INCIDENT PROCUREMENT
Place of performance
OH
PSC
Y1LB: CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
Last updated
Dec 4, 2025

Identifiers

Solicitation number
12318721R0005
Notice ID
8711837d3ad8403f8c87988ac0b05cf3

Description

The U.S. Forest Service is soliciting offers for a Multiple Award Task Order Contract (MATOC), Indefinite Delivery Indefinite Quantity (IDIQ) contract type with an estimated Not to Exceed (NTE) shared capacity of $10 Million. The ordering period is anticipated to be one (1) base year and four (4) option years. The Government anticipates to award three (3) Indefinite Delivery-Indefinite Quantity (IDIQ) contracts for road and general construction work. Additional awards, at Forest Service discretion, may be considered depending on Forest Service need and results for proposal evaluations. Associated with this Solicitation is the initial Task Order Pricing Requests for two task orders anticipated to be awarded in conjunction with award of the IDIQ contracts. Prospective offerors are required to submit quotes for both of the initial task orders advertised with this IDIQ. Future task orders will be competed amongst the IDIQ contract awardees utilizing the procedures identified in Section G of the forthcoming Solicitation. Scope of Work: The Government intends to make multiple awards of Indefinite Delivery Indefinite Quantity (IDIQ) Contracts for road construction and related services. Work includes general road, bridge, structure work, and site work as identified, but not limited to: Road and trail: Work includes repair and construction of native surface, gravel or paved roads; and road repair and reconstruction due to damage from human or natural causes. Road and trail decommissioning: Work includes de-compaction, partial or full re-contour to restore the roadway to a hydrological stable condition; removal of drainage structures and associated fill to restore site to natural contour; work may include excavation of stream channels without drainage structures; installation of gradient control devices in channels or sediment basins; tree transplanting; rock/log scattering; seeding, fertilizing and mulching; and the construction of waterbars. Construction: Demolition/construction of small non-residential building. Bridge: Work includes repair and construction of steel, concrete, and timber road bridges; reconstruction of approaches; and related stream work within the project area. Trail bridges readily accessible by conventional road building equipment: Work includes construction or reconstruction of bridge. Site will be accessible from National Forest system roads or trails, or other public roads. Culverts, Aquatic Passage Structures, and Ancillary Structures: Work includes road structures for aquatic passages, bottomless arches, small bridges, retaining walls, and cattle guards that are part of National Forest roads. Related work includes signs; guardrails; closure devices such as gates, cattle guards, fences; stream grade; alignment control; scour protection; and other work typically performed by road construction and excavation type contractors. TASK ORDER PROJECT CHANGE Pine Grove is removed. Replace with Hanging Rock. 07/08/2021: The purpose of this amendment is to incorporate the FINAL Questions and Answers dated 7/8/2021. The Questions and Answer period has now closed. The government is not obligated to answer any questions submitted after this amendment. All other terms and conditions remain the same. Period of Performance: 08/01/2021 to 07/31/2026 Amendment 0004: Q&A FINAL version has been uplaoded

Full description on SAM.gov

Award Overview

Contacts

Documents

No documents available.

Lifecycle

Solicitation:12318721R0005
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. 2×
    Pre-SolicitationApr 30, 2021

    Wayne NF MATOC IDIQ ~ Roads and General Construction

    Notice 77ed54593b254e17af9cc1679f24fd01 on SAM.gov

  2. 5×
    SolicitationCurrentJun 8, 2021

    Wayne NF MATOC IDIQ ~ Roads and General Construction

    Notice 8711837d3ad8403f8c87988ac0b05cf3 on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

12318721R0005

Archive Date

Jul 30, 2021

Office Address

Boise, ID, 837055354