GovChime
Notice ID: 6cf1325b9bf64eee91e02e61f92b33feCombined Synopsis/SolicitationArchived

Retention Pond Vegetation Removal

Archived on June 6, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
4:00 PM CDT
Posted
May 14, 2026
Notice type
Combined Synopsis/Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
NAICS
561730: Landscaping Services
Agency
Department of AgricultureAGRICULTURAL RESEARCH SERVICE

Notice details

Office
USDA ARS AFM APD
Place of performance
Gainesville, Florida, 32608
PSC
S208: HOUSEKEEPING- LANDSCAPING/GROUNDSKEEPING
Last updated
Oct 30, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
1232SA26Q0567
Notice ID
6cf1325b9bf64eee91e02e61f92b33fe

Description

This project is to Remove Vegetation from the Retention Pond at the USDA, ARS, Gainesville, FL location.

Please review the attached documents for the required information.

Please sent you r quotes directly to the email Point of Contact in this solicitaion.

A site visit has been scheduled for Wednesday May 13, 2026, at 8:00 am EST. If you would like to attend, please send the name of the personnel requesting to attend with the name of the compnay which they are representing to lynn.hults@usda.gov by 2:00 pm CST Tuesday May 12, 2026.

Questions and Answers.

Q1: Overhead and street views indicate a need to get the surrounding shoreline cleaned up in order to gain access to the retention pond. We have equipment for that, but the steepness of the bank would dictate the use of either a track loader or an excavator to facilitate the job. Would this bid require debris removal to a landfill?

A1: 

  1. A tracked excavator will be necessary to preform the work required. The requirements are as follows.  
  1. Removal of all vegetation in retention pond
  2. Removal of specified trees and vegetation immediately around retention pond
  3. Wet debris may be piled for removal after drying
  4. All debris will either be hauled off site or mulched on site

Q2: Would we be able to leave equipment and trailers at the job site?

A2: Equipment can be left on site during the prefomance of contractual work.

Q3: Is there any special permitting required?

A3: No special permitting is required on site. DOT may regulate the transportation of wet debris.

Q4: What is the approximate pond size (acreage and depth)?

A4: 150’ in diameter and 8’ below surrounding grade at bottom. These are NOT actual dimensions but estimates.

Q5: Are stumps required to be removed as part of tree clearing?

A5: Yes, stumps are to be removed.

Q6: Are there any environmental restrictions or permits required for this work?

A6: No permits are required on site for this work to our knowledge.

Q7: Is there a preferred debris disposal method (mulching on-site vs. hauling off-site)?

A7: No preferred method. The area is to be left tidy with no piles of debris at job completion.

Q8: Are there any site access limitations we should plan for?

A8: No.

Q9: What is the required completion timeframe for the project?

A9: 4 weeks from start of work.

Q10: Does the pond have water in it? Does it need to be pumped to do the job?

A10: We are in an exceptional drought this year. No water is visible right now. As to whether it needs to be pumped to do the job that would be up to the contractor to determine.

Added a overview photo and the sign in sheet from the site visit.

Full description on SAM.gov

Award Overview

Contacts

Contracting Officer

Primary Contact

Documents

Files (6)

  • Pond Elevation.jpeg

    4.2 MBAdded in Combined Synopsis/Solicitation version 7Posted
    Download
  • Pond sign-in sheet.pdf

    889 KBAdded in Combined Synopsis/Solicitation version 7Posted
    Download
  • C05a_Highest Technically Rated with Fair and Reasonable Pricing Evaluation Criteria 1232SA26Q0567.docx

    57 KBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • C05_CSS_Commerical Products and Services_Revised 22 Apr 2026 1232SA26Q0567.docx

    33 KBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • Wage Rates 2015-4537 Rev 29 042926.pdf

    512 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • SOW_Retention Pond.docx

    15 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1Combined Synopsis/SolicitationArchived

    Retention Pond Vegetation Removal

    Notice 7b5cc27158574507af692a6153c3fbd8 on SAM.gov

  2. 2
    Version 2Combined Synopsis/SolicitationArchived

    Retention Pond Vegetation Removal

    Notice 770d9430cf8140698bc9e2ba098ca3c1 on SAM.gov

  3. 3
    Version 3Combined Synopsis/SolicitationArchived

    Retention Pond Vegetation Removal

    Notice 281bea4a5db84c52bf7b342fa2155284 on SAM.gov

  4. 4
    Version 4Combined Synopsis/SolicitationArchived

    Retention Pond Vegetation Removal

    Notice f91b7fdc1b2246919443343685e5cef3 on SAM.gov

  5. 5
    Version 5Combined Synopsis/SolicitationArchived

    Retention Pond Vegetation Removal

    Notice 923ccaa7a82b4cfd83f152a5ae79cdb4 on SAM.gov

  6. 7
    Version 7Combined Synopsis/SolicitationArchivedCurrent

    Retention Pond Vegetation Removal

    Notice 6cf1325b9bf64eee91e02e61f92b33fe on SAM.gov

  7. 9
    Version 9Award NoticeArchived

    Type changed from Combined Synopsis/Solicitation to Award Notice

    Retention Pond Vegetation Removal

    Notice 84400c860aea48de806c27cd08738296 on SAM.gov

Similar Opportunities

Additional Details

Solicitation Number

1232SA26Q0567

Archive Date

Jun 6, 2026

Office Address

BELTSVILLE, MD, 20705