Notice ID: b8d1a4b8b2ed47199a4fc58ed266c583Presolicitation
Caldor Suppression Repair and GAOA John Don�t
Archived. Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 4:30 PM UTC−07:00
- Posted
- March 24, 2023
- Notice type
- Presolicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 237310: Highway, Street, and Bridge Construction
- Agency
- Department of AgricultureFOREST SERVICE
Notice details
- Office
- USDA-FS, STEWARDSHIP CONTRACTING BRANCH
- Last updated
- Sep 9, 2025
Identifiers
- Solicitation number
- 12363N23R4006
- Notice ID
- b8d1a4b8b2ed47199a4fc58ed266c583
Description
PROJECT DESCRIPTION: Caldor Suppression Repair and GAOA John Dont Caldor Suppression Repair Project consists of furnishing all labor, materials, equipment, tools, transportation, incidentals, inspection, quality control and supplies necessary to complete the suppression repairs after the Caldor Fire. Contractor shall restore the drainage functions, clean ditches, leadoffs, and culverts of Forest Service roads. Contractor shall deliver aggregate for spot surfacing, deliver asphalt to repair potholes and skin patching. The contractor shall provide the materials to do a single course chip seal, fog seal, asphalt concrete overlay, and striping. Due to the recent fires, it is expected that contractors will encounter fallen trees across the road. Removing these trees off the road is considered incidental. GAOA John Dont Project consists of furnishing all labor, materials, equipment, tools, transportation, incidentals, inspection, quality control and supplies necessary to complete the suppression repairs within the John Dont project area. Contractor shall recondition the existing roadway which includes cleaning ditches, re-establish drainage features, re-establishing and cleaning leadoff ditches, cleaning culverts, removing vegetation and debris off the roadway, outsloping, and blading and compacting existing Forest Service roadbed to restore drainage functions of the roadway. Contractor shall construct waterbars and rolling dips to drain water off the roadway. Contractor shall deliver aggregate for spot surfacing and deliver asphalt for asphalt pothole and skin patching. Contractor shall do linear grading which includes re-establishing the roadbed and road reconditioning. All work shall be in accordance with the contract requirements and within the contract time. Contractor shall, without additional expense to the government, be responsible for obtaining any necessary licenses, permits, which comply with any federal, state, and municipal laws, codes and regulations applicable to the performance of the work. Contractor is responsible for temporary traffic control and construction signs shall be in accordance with the latest version of MUTCD. PROJECT LOCATION: Caldor Suppression Repair The project is located within the Pacific, Placerville, and Amador ranger districts within the Eldorado National Forest. From Placerville, California, take Highway 50 east towards South Lake Tahoe for approximately 15 miles and exit Sly Park Road. Turn right onto Sly Park Road and travel for approximately 4.5 miles. Turn left on Mormon Emigrant Trail (NFS Road 10N50) to reach the project site. GAOA John Dont The project is located on the Pacific ranger district within the Eldorado National Forest. From Placerville, California, take Highway 50 east towards South Lake Tahoe for approximately 24 miles. Turn left onto Ice House Road and travel for approximately 10 miles to reach the project site. Contractors shall furnish all labor, supervision, equipment, materials, transportation, supplies (unless specified elsewhere as Government-furnished), and incidentals required to accomplish specified work in compliance with the terms, specifications, and provisions of the contract. Work is estimated to begin around June 2023. Engineering point of contact is Alvin Sarmiento, telephone: (530) 708-1363. NAICS 237310 with size standard $45 mil. This project is set aside 100% for small business.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
12363N23R4006- Pre-Solicitation
Formal solicitation typically follows within 30–60 days. (estimate)
- 2×Pre-SolicitationCurrentFeb 14, 2023
Caldor Suppression Repair and GAOA John Don�t
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Additional Details
Solicitation Number
12363N23R4006
Archive Date
Not specified
Office Address
Washington, DC, 202501138