Fleetwood Stewardship IRSC BPA Call - Big Horn National Forest
Cancelled on SAM.gov (notice posted September 23, 2026). Original response deadline: . Full description on SAM.gov.
Overview
- Response deadline
- 3:00 PM PDT
- Posted
- September 23, 2026
- Notice type
- Combined Synopsis/Solicitation
- Set-aside
- Total Small Business Set-Aside (FAR 19.5)
- NAICS
- 113310: Logging
- Agency
- Department of AgricultureFOREST SERVICE
Notice details
- Office
- USDA-FS, STEWARDSHIP CONTRACTING BRANCH
- Place of performance
- Sheridan, Wyoming, 82801
- Last updated
- Oct 28, 2026
- First published
- Last updated on SAM.gov
Identifiers
- Solicitation number
- 12363N26Q4067
- Notice ID
- 470e1c04d801484cb55e9b9e7f0cd636
Description
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. Using this format, no separate presolicitation is required and this announcement constitutes the only solicitation.
Solicitation number 12363N26Q4067 is issued as a Request for Quotation (RFQ) for Fleetwood Stewardship IRSC (Integrated Resource Service Contract). Award shall be made under the R2 Rocky Mountain Restoration Project (RMRP) Stewardship BPA. Only current BPA holders will be eligible to submit quotes. An open-continuous RFQ is posted on sam.gov for the RMRP BPA. Vendors interested in being awarded a BPA should respond to RFQ Number: 12363N22Q4038.
The contract includes the following components:
- Regeneration clearcut harvests on nine cutting units totaling 228 acres and overstory removal liberation harvests on two units totaling 46 acres.
- Limited product hauling pay item.
- Road reconstruction work on approximately 7.3 miles of existing roads including clearing and grubbing, road surface and drainage improvements, spot aggregate placement and sign upgrades.
- Road maintenance service work on approximately 30 miles of existing roads.
- Optional service work for treatment of non-included material on 197 acres within cutting units.
- Remove Timber Subject to Agreement (TSTA) generated from Optional Work Items 16-23 for product located in Units 12, 13, 14,15, 16, 17, 18 and 22 if awarded.
- Resultant fuels reduction, piling of fuels, road system improvements and reforestation enhancement from above listed activities.
This service acquisition is a total small business set-aside. The set-aside relates to the business status of the contractors submitting quotes and does not limit where the wood products may be sold. The applicable North American Industry Classification Standard Code is 113310 Logging. The small business size standard is 500 employees. All responsible sources that have been awarded RMRP Blanket Purchase Agreements for work on the Big Horn National Forest may submit a quotation which will be considered by the agency.
Solicitation was amended on 8/11/2026 to incorporate site visit notes and questions/answers into the solicitation via Attachment 9. Two small changes were also made to the solicitation. Respondents must acknowledge receipt of this amendment. Response deadline was not changed.
Award Overview
No prior contract identified
No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.
Contacts
Contracting Officer
Primary Contact
Secondary Contact
Documents
Files (11)
- Download
C05_Amendment 0001_Add Site Visit Notes_QandA.pdf
337 KBAdded in Combined Synopsis/Solicitation version 3Posted - Download
C04d_4_Appendix D_RoadReconPlans_Specs_12363N26Q4067.pdf
8.5 MBAdded in Combined Synopsis/Solicitation version 1Posted - Download
C04f_5_Final Contract Area Vicinity Map_Sheet2_12363N26Q4067.pdf
680 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
C04e_5_Final Contract Area Map_Sheet1_12363N26Q4067.pdf
498 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
C04c_3_Appendix C_RoadMtcSpecs_12363N26Q4067.pdf
446 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
C04b_2_Appendix B_TimberRemovalSpecs_Scaled_12363N26Q4067.pdf
482 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
C04i_8_Heavy Highway Wage Decision_12363N26Q4067.pdf
243 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
C04g_6_Cruise Report_12363N26Q4067.pdf
186 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
C04h_7_Forestry Services Wage Determination_12363N26Q4067.pdf
150 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
C04a_1_Appendix A_PerformanceWorkStatement_12363N26Q4067.pdf
171 KBAdded in Combined Synopsis/Solicitation version 1Posted - Download
C04_RFQ Fleetwood IRSC_12363N26Q4067.pdf
818 KBAdded in Combined Synopsis/Solicitation version 1Posted
Lifecycle
- 1Version 1Combined Synopsis/SolicitationArchived
Fleetwood Stewardship IRSC BPA Call - Big Horn National Forest
- 3Version 3Combined Synopsis/SolicitationArchived
Fleetwood Stewardship IRSC BPA Call - Big Horn National Forest
- 4Version 4Combined Synopsis/SolicitationArchived
Fleetwood Stewardship IRSC BPA Call - Big Horn National Forest
- 5Version 5Combined Synopsis/SolicitationCancelledArchivedCurrent
Fleetwood Stewardship IRSC BPA Call - Big Horn National Forest
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
Amendment 004: Posted 11/10/2026: See Attachment/Links for amended documents. Extends the Quotes Due Date from 11/16/2026 to 11/20/2026. Amends C05_12363N26Q4181Corral G-Z IRSC IRSC Solicitation. Page 4: Revises submission of proposal instructions. Page 8: Includes additional information on awarding of Optional Items. Page 58: Amends Quotes Due date from 11/16/2026 to 11/20/2026. Amends Appendix A page 5 technicalspecifications for Item 4 and 6. Amends Appendix B page 23 to remove specifications. Amends Attachment 4 Prescriptions pages 3, 4 and 5 to remove specifications. Includes example of cruise card to be used during implementation of Item 8. Amendment 003: Posted 11/4/2026: See Attachment/Links for amended documents. Includes C05_A003_12363N26Q4181_SF30 Amendment Amends Corral G-Z IRSC IRSC Solicitation pages 6, 8, 18, 19, 41, and 50. Replaces Appendix A – Technical Specifications in its entirety. Amends Appendix B – Timber Specifications pages 3, 23, 31, and 37. Replaces Attachment 2 – Design Features in its entirety. Replaces Attachment 4 – Prescriptions in its entirety. Replaces Corral Cruise in its entirety to reflect the revision to the log table to correct the top DIB to a 6” on all logs. This correction is reflected in the revised product volumes and Minimum Acceptable Quote. Include Site Visit question and answers plus attendees sign in sheet for Site Visit held on October 29th, 2026. Amendment 002: Posted 10/14/2026 - Revises Pages 5 and 6 of the Solicitation Schedule of Items. Quanties for Item 14, 16 and 21 are revised. Adds Grizzly project area spatial data for "no treatment areas." Replaces Grizzly Treatment Area Map. See attachments for SF30 with amended solicitation pages 5 and 6, spatial data zip file and new Grizzly Project Area Map. Amendment 001: Posted 10/06/2026 - Changes Site Visit date from Thursday, October 22, 2026 to Thursday, October 29, 2026. Adds Project Spatial Data zip files. See attachments for SF30 with amended solicitation pages, and spatial data files. This is a combined synopsis/solicitation for commercial services prepared in accordance with FAR 12. This announcement constitutes the only solicitation; quotes are being requested, and a separate written solicitation will not be issued. Solicitation number 12363N26Q4181 is issued as a request for quotation (RFQ). This project follows the G to Z Integrated Resource Stewardship Contract (IRSC) model which is a unique approach that takes projects from signed NEPA decision and reintroduction of fire on the landscape. The Corral G-Z Integrated Resource Service Contract directly supports Executive Order 14225, the Immediate Expansion of American Timber Production, Secretary Rollins Memorandum 1078-006 and follows the direction put forth by Acting Associate Chief Chris French in producing timber volume, reducing hazardous fuels, providing wood fiber to struggling industries and supporting local economies surrounding the Fremont-Winema National Forest. The objectives of this project are 1) to restore forest health and vigor by reverting stand density and species composition to their historical range of variability, while also 2) mitigating the threat of catastrophic wildfire by reducing hazardous fuels. These objectives will be accomplished through the following: Professional Forestry: Completion of harvest layout, timber marking, timber volume determination and acre determination of harvest unit boundaries, and DxP prescription monitoring. Logging and Fuels Reduction: Cut and remove an estimated 191,379 tons of commercial timber on approximately 7,000 acres, and fuels reduction on approximately 17,000 acres. Removal will include ground-based logging systems utilizing whole tree yarding, cutting, skidding and decking sub-merchantable trees in plantations, fuel breaks and general stands. Cut and pile encroaching conifers in meadow areas and release cuts in whitebark pine stands. The associated North American Industrial Classification System (NAICS) code for this procurement is 113310 –logging, with a small business size standard of 500 employees. The product service code is F014. The government will award a Firm-Fixed Price (FFP) contract resulting from this combined synopsis/solicitation to the responsible quoter whose quote, conforming to the synopsis/solicitation, will be most advantageous to the government (as determined by the solicitation evaluation criteria). All responsible sources may submit a quotation which will be considered by the agency, and shall be valid for 60 days after the date of receipt for the solicitation. | - | Combined Synopsis | 11/20/2026 |
| - | Awarded | Open | |
26/11/02 Update site questions on October 1, 2026. see attachments: B14 and A15. Sources Sought (SS) / Request for Information (RFI) This Sources Sought / Request for Information (RFI) is issued solely for market research and planning purposes. It does not constitute a solicitation or a promise to issue a solicitation in the future. The Government will not reimburse accompanying costs. Any answers or attachments provided are based upon the best information available at the time of the visit and are subject to change. 1. Background & Purpose USDA Forest Service seeks capability statements from qualified vendors able to conduct fuels reduction on steep and rugged terrain within Bozeman Municipal Watershed Project area for the anticipated Leverich Helio Stewardship IRSC. The purpose of this SS/RFI is to gather information on vendor capabilities, invite prospective vendors to an organized site visit on 10/01/2026, and to view the area before snow limits access. 2. Anticipated Scope of Work Cut and removal of approximately 290 CCF of Lodgepole pine sawtimber 2045 CCF of Douglas-fir and other Sawtimber on 151 acres. Whole-tree Helicopter yarding of included timber. Piling of slash at the landing area. Road Decommissioning of .59 miles of existing Temporary Road Use Permit (TRUP) roads post-hauling. 3. Place of Performance The Leverich Helio Stewardship IRSC project is located in the northern Gallatin Mountain Range, just south of Bozeman, MT. Helicopter units are located on the west side of FS Road #979, along Bozeman Creek and adjacent to City of Bozeman land. 4. Period of Performance Anticipated start date: Late Spring/Early Summer 2027. Period of performance is estimated to not exceed two operational seasons and is dependent on weather, access, and coordination. 5. Site Visit An organized site visit will occur on Thursday, October 1, 2026, at 10:00 a.m. MDT. Interested parties will meet at the Bozeman Ranger District located at 3710 Fallon St. Suite C. Bozeman, MT 59718. Interested parties should contact Nathan Motzko at nathan.motzko@usda.gov or 406-224-0323 by 12:00 p.m. MDT on September 30, 2026, if they intend to attend. 6. Requested Capability Statement Content Company information (UEI, address, email, POC, socio-economic status). Relevant experience, especially hazardous fuel reduction, helicopter yarding, steep slope timber operations. Safety program details and crew qualifications. Equipment lists and mobilization capabilities. Past performance references. 7. Response Instructions & Due Date Any information submitted by vendors to this this SS/RFI is voluntary. Responses should be submitted electronically to Jeanne Windle at norma.windle@usda.gov. All responses are due no later than October 15, 2026, at 4:00 p.m. MDT. 8. Points of Contact Direct all questions via email to Jeanne Windle, Contracting Officer at norma.windle@usda.gov. | - | Market Research | 12/15/2026 |
This Sources Sought / Request for Information (RFI) is issued solely for market research and planning purposes. It does not constitute a solicitation or a promise to issue a solicitation in the future. The Government will not reimburse accompanying costs. Any answers or attachments provided are based upon the best information available at the time of the site visit and are subject to change. 1. Background & Purpose USDA Forest Service seeks capability statements from qualified vendors able to conduct forest thinning and vegetation treatments in areas burned by the Caldor Fire. The goals of the project are to reduce hazardous fuels and create conditions appropriate for reestablishing forested landscapes. Stewardship Authority shall be utilized to award an Integrated Resource Service Contract. In accordance with the approved NEPA decision, Cut-to-Length harvesting is the required logging mechanism. CTL typically consists of a harvester cutting and processing trees at the stump and a forwarder transporting the material to a designated landing location over a slash mat. The purpose of this SS/RFI is to gather information on vendor capabilities, invite prospective vendors to an organized site visit on 11/3/2026 before snow limits access, and provide draft documents to so that vendors can assess whether the opportunity is one to follow and potentially quote. 2. Anticipated Scope of Work The project objectives shall be met by performing the following service work. Cut, process, and forward to landings or pile included biomass in 3 units across 205 acres. Within these units, cut standing dead conifer trees and forward to landings or pile. Treat fuels by mechanically masticating existing dead and down material, project-generated slash and brush. Remove slash and large dead and down to landings when necessary to meet the fuels treatment specification. Remove biomass and cull logs from landings to off-Forest disposal sites. Construct temporary road to facilitate thinning treatment and decommission the roads prior to demobilization. Perform road maintenance and erosion control on roads used for biomass removal or otherwise damaged by Contractor’s operations. Perform hand thinning and piling if awarded. 3. Place of Performance The project is located on the Lake Tahoe Basin Management Unit in portions of Township 11N Range 18E Section 5, and Township 12N Range 18E Sections 32 and 33; Mount Diablo Meridian, approximately 0.5 miles southeast of the intersection of California Highway 89 and US Highway 50. 4. Period of Performance Anticipated start date: Early Summer 2027. Performance deadline: 9/15/2027. This deadline is linked to grant funding expiration. 5. Site Visit An organized site visit will occur on Tuesday, November 3, 2026, at 10:00 a.m. local time. Interested parties will meet in South Lake Tahoe, CA at the east end of Oneidas Street at the Forest Service Gate: 38°51'53.0"N 119°59'40.7"W. This location is south of Lake Tahoe Airport off of Pioneer Trail Road. Interested parties should email Karen Ruklic at karen.ruklic@usda.gov by 1:00 p.m. PT on November 2, 2026, if they plan to attend. 6. Requested Capability Statement Content Company information (UEI, address, email, POC, business size and socio-economic status). Relevant experience focused on thinning via Cut-to-Length logging system and hazardous fuel reduction. Key personnel and crew qualifications. Equipment lists and mobilization capabilities. Past performance references. 7. Response Instructions & Due Date Any information submitted by vendors to this this SS/RFI is voluntary. Responses should be submitted electronically to Karen Ruklic at karen.ruklic@usda.gov. All responses are due no later than Monday, November 2, 2026, at 1:00 p.m. PT. | - | Market Research | 11/02/2026 |
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued. Solicitation number 12363N26Q4160 is issued as a Request for Quotation (RFQ) for Promenade Park Stewardship IRSC (Integrated Resource Service Contract). Award shall be made under the R5 Pacific Southwest Stewardship Blanket Purchase Agreement. Only current BPA holders are eligible to submit quotes. Quotes received from vendors that have not been awarded an R5 Pacific Southwest Stewardship BPA will be rejected; no evaluation of submitted documents will be performed. The Forest Service is executing this procurement using stewardship contracting authority provided under 16 USC 6591c. The objectives of this project are to improve health and resiliency across the landscape in post-fire stands within recent wildfire footprints, to reduce fuels and snags to prepare the landscape for future fire, and limit excessive fuel accumulation, especially within and adjacent to communities, and increase the resilience of remnant green stands not effected by the Park Fire. The project will advance EO 14225, Immediate Expansion of American Timber Production, and the USDA's National Active Forest Management Strategy. Project activities include: 1. Cut, Skid and Deck Included Timber from the Contract Area, 2. Removal of Included Timber from the Contract Area, 3. Road Maintenance, 4. Road Reconstruction Work. This acquisition is total small business set-aside. The set-aside related to the business status of the vendors submitting quotes and does not limit where the wood products may be sold. The applicable North American Industry Classification Standard Code is 113310 – Logging. The small business size standard is 500 employees All responsible sources that have been awarded R5 Pacific Southwest Stewardship BPAs for work on the Lake Tahoe Basin Management Unit may submit quotations which will be considered by the agency. Solicitation was amended on 7/17/26 to add Attachment 11 - Site Visit Notes. Attachment 5b Contract Area Map was also struck and replaced with an amended version dated 7/14/26 that includes a newly approved water hole. Deadline for quote receipt is unchanged. BPA holders eligible to submit quotes must acknowledge receipt of this amendment. | - | Combined Synopsis | 07/28/2026 |
Additional Details
Solicitation Number
12363N26Q4067
Archive Date
Sep 30, 2026
Office Address
Washington, DC, 202501138