Notice ID: 71dfb4448d41789d70d0462aff1c0d9dAward NoticeAwarded
USDA-NRCS CROW BOTTOMS WRP RESTORATION
Awarded on May 23, 2018. Full description on SAM.gov.
Awarded tounder 123C7818C0003 (source: SAM.gov award notice)• $208.2K
Overview
- Posted
- May 24, 2018
- Notice type
- Award Notice
- NAICS
- 237990: Other Heavy and Civil Engineering Construction
Notice details
- Place of performance
- Clark County, IL, 62441
- PSC
- Z: MAINT, REPAIR, ALTER REAL PROPERTY
- Last updated
- Dec 6, 2025
- Award date
- May 23, 2018
- Award amount (SAM.gov award notice)
- $208.2K
Identifiers
- Solicitation number
- 123C7818B0002
- Notice ID
- 71dfb4448d41789d70d0462aff1c0d9d
- Award number (PIID)
- 123C7818C0003
Description
The purpose of Amendment 0002 is to change site visit dates and extend the bid submittal date as follows due to the work site being underwater: Technical Exchange: 19 April 2018; 1000 CST. The work site is submerged and not available for viewing. This session will be a technical Q/Q with the COR. Site Visit: Change from 19 April 2018; 1000 CST to read 04 May 2018; 1000 CST - assumes water receding Last Date for Questions: 7 May 2018 1100 EST Bid Submittal Deadline: Change submittal date from 27 April 2018; 1100 EST to read 11 May 2018; 1100 EST Bids should be emailed to steven.alves@wdc.usda.gov (unchanged) Email Subject Line: 123C7818B0002_Company Name_BID Bid Opening Date: 16 May 2018, 1400 EST Call-in Number to be sent to all contractors submitting a bid **If you have not received a receipt confirmation by 4/16/18 1000 EST- call 919-873-2115**
Award Overview
Award Number
123C7818C0003
Award Amount (SAM.gov award notice)
$208.2K
Award Date
May 23, 2018
Awardee
Awardee UEI
MFH5JXYMAHJ6
Original Solicitation
Notice ID: 71dfb4448d41789d70d0462aff1c0d9d
Posted Date: May 24, 2018
Original Response Deadline: Not specified
Contract Details
No FPDS record matches this award number at the same department yet
Contract details typically appear within 2-4 weeks after award; DoD awards are published about 90 days after signature.
Contacts
Documents
No documents available.
Lifecycle
Solicitation:
123C7818B0002- Pre-Solicitation
- Solicitation
- Awarded
This opportunity has been awarded.
- 6×Pre-SolicitationMar 7, 2018
USDA-NRCS CROW BOTTOMS WRP RESTORATION
- SolicitationMay 7, 2018
USDA-NRCS CROW BOTTOMS WRP RESTORATION
- AwardedCurrentMay 24, 2018
USDA-NRCS CROW BOTTOMS WRP RESTORATION
Similar Opportunities
Title | Match | Phase | Deadline |
|---|---|---|---|
By way of this Market Survey/Sources Sought Notice, the USACE-Chicago District intends to determine the extent of firms that are engaged in providing the services described hereunder for the Dutch Gap Aquatic Ecosystem Restoration, Antioch, Lake County, Illinois. The responses to this Notice will be used for planning purposes for an upcoming procurement. Therefore, this Notice does not constitute a Request for Proposal (RFP); it does not guarantee the future issue of a RFP; nor does it commit the government to contract for any supply or service whatsoever. Further, this Agency will not accept unsolicited proposals. Respondents are advised that this Agency will not pay for any information or administrative cost incurred in response to this Notice; all costs associated with responding to this Notice will be solely at the responding party's expense. At this time, proprietary information is not being requested, and respondents shall refrain from providing proprietary information in response to this Notice. Responses to this Notice will not be returned. Please be advised that all submissions become Government property and will not be returned. Not responding to this Notice does not preclude participation in any future RFP, if any is issued. In accordance with FAR 15.201(e), responses to this notice are not offers and cannot be accepted by the U.S Government to form a binding contract. It is the responsibility of the interested parties to monitor this site for additional information pertaining to this Notice. GOVERNMENT REQUIREMENTS: Under the proposed Contract, the contractor will be required to provide the following construction services: The Dutch Gap Aquatic Complex, IL - Sec. 206 project spans 785-acres in Antioch, Lake County, Illinois, on land owned by Lake County Forest Preserves. Intensive agriculture has led to the installation of drain tile networks, excavation of drainage ditches, and stream channelization, impacting natural hydrologic and other processes. Such impacts have enhanced flooding risks, minimized the amount of open space available for native plant and wildlife communities, diminished recreational opportunities, and disturbed natural processes and soils in the project area. The project area is further dominated by non-native and invasive plant species. The principal goal of the project is to restore stream, riparian, wetland, and buffering plant communities to provide habitat for migratory birds and local fish and wildlife. Restoration of aquatic ecosystems within the project area will reestablish hydroperiods and other hydrologic and hydraulic parameters to rehydrate former hydric soils to support critical wetland and riparian habitats. It will also reestablish native plant communities that will further diversify over time, resulting in greater quantity (acres) and quality of native plant communities. Estimated Performance Period: 5 years under NAICS 237990 Other Heavy and Civil Engineering Construction Estimated Cost: Between $5,000,000.00 and $10,000,000.00 All interested Small Businesses, certified HUBZONE, 8(a), Woman-Owned Small Business or Service-Disabled Veteran Owned Business contractors should respond to this market survey/sources sought via email no later than Friday, March 21, 2025, at 3:30 p.m. Central Time. REQUESTED INFORMATION: 1. Identification and verification of the company’s small business status. 2. Contractor’s Unique Entity Identifier (UEI)) and CAGE Code(s). 3. Documentation from the firm’s bonding company showing current single and aggregate performance and payment bond limits. 4. Descriptions of Experience –Interested construction firms must provide no more than three (3) example projects with either greater than 95 percent completion or projects completed in the past five (5) years where the interested firm served as the prime contractor. Each project must include the name, title, project role, e-mail address, and telephone number of at least one reference. References may be used to verify project size, scope, dollar value, percentages and quality of performance. Example projects must be of similar size and scope. a. Projects similar in scope/size to this project include: Aquatic ecosystem restoration which includes but is not limited to earthwork and excavation for 2450 feet of re-meandered stream channel, hydrologic restoration through disablement of 70,000 feet of drain tile, and native plant restoration of stream, wetland, prairie, and oak savanna communities over 700 acres. b. Based on the information above, for each project submitted, include: Current percentage of construction complete and the date when it was or will be completed. Scope of the project. Size of the project. The dollar value of the construction contract and whether it was design-bid build or design-build. The percentage of work that was self-performed as project and/or construction management services or physical construction type work. Identify the number of subcontractors by construction trade utilized for each project. 5. Small Businesses are reminded under FAR 52.219-14, Limitations on Subcontracting; they must perform at least 15% of the cost of the contract, not including the cost of materials, with the firm’s own employees for general construction-type procurement. Include the percentage of work that will be self-performed on this project, and how it will be accomplished. NOTE: Total submittal package shall be no longer than 8 pages. Please only include a narrative of the requested information; additional information will not be reviewed. SUBMISSION OF RESPONSES: Respondents interested in providing a response to this Notice shall provide their submittals to Ericka Hillard prior to 3:30 p.m. (Central Time) on March 21, 2025, via email to: ericka.d.hillard@usace.army.mil (ensure that the number & title of the Sources Sought Notice of "W912P625S0003, Dutch Gap Aquatic Ecosystem Restoration,” is included in the subject line of the email). Any electronic files (EMAIL) CANNOT EXCEED this Agency's size limit of 20MB (includes email and its attachment); files exceeding this size will be denied access to Ms. Hillard's email inbox. NEGATIVE REPLIES ARE WELCOMED. | 67% | Market Research | 03/21/2025 |
** EFFECTIVE JANUARY 21, 2026: The government has posted Amendment No. 0004 hereunder this Notice (please refer to the Attachments Section). ** ** EFFECTIVE JANUARY 13, 2026: The government has posted Amendment No. 0003 hereunder this Notice (please refer to the Attachments Section). ** ** Important Notice Regarding ProjNet Access for Solicitation W912P626BA001 **** It has come to our attention that some users may experience difficulties accessing the ProjNet website at projnet.org to submit questions regarding this solicitation. Our agency is aware of this technical issue and is actively working on a solution. In the meantime, vendors may access the ProjNet portal and submit questions using the following direct link: https://www.projnet.org/ProjNet/binKornHome/index.cfm. We apologize for any inconvenience this may cause and appreciate your continued interest in this U.S. Army Corps of Engineers (USACE) opportunity. **** ** EFFECTIVE JANUARY 8, 2026: The government has posted Amendment No. 0002 hereunder this Notice (please refer to the Attachments Section). ** ** EFFECTIVE DECEMBER 31, 2025: The government has posted Amendment No. 0001 hereunder this Notice (please refer to the Attachments Section). ** ** ATTENTION TO BIDDERS **************************************** PROJECT SITE VISIT JANUARY 7, 2026 ************************************ A pre-bid meeting and project site visit is scheduled for Wednesday, January 7, 2026, at 10:00 a.m. (Central Time). Interested contractors are to meet at location: Antioch, Illinois (42.480567, -88.004898), and must be supervised by USACE and the non-Federal sponsor. **************************************** PROJECT SITE VISIT JANUARY 7, 2025 ************************************ An amendment is forthcoming to incorporate the updated pre-bid meeting information. ** ** This Solicitation Notice, relates to Pre-Solicitation W912P625BA003, and is being issued by the United States Army Corps of Engineers - Chicago District for Dutch Gap Aquatic Ecosystem Restoration, Antioch, Lake County, Illinois. **PROJECT DESCRIPTION: The Dutch Gap Aquatic Complex, IL - Sec. 206 project spans 785-acres in Antioch, Lake County, Illinois, on land owned by Lake County Forest Preserves: restore stream, riparian, wetland, and buffering plant communities to provide habitat for migratory birds and local fish and wildlife. Restoration of aquatic ecosystems within the project area will reestablish hydroperiods and other hydrologic and hydraulic parameters to rehydrate former hydric soils to support critical wetland and riparian habitats. It will also reestablish native plant communities that will further diversify over time, resulting in greater quantity (acres) and quality of native plant communities. **Background: Intensive agriculture has led to the installation of drain tile networks, excavation of drainage ditches, and stream channelization, impacting natural hydrologic and other processes. Such impacts have enhanced flooding risks, minimized the amount of open space available for native plant and wildlife communities, diminished recreational opportunities, and disturbed natural processes and soils in the project area. The project area is further dominated by non-native and invasive plant species. **ACQUISITION INFORMATION: Competition for this acquisition is planned to be FULL AND OPEN, UNRESTRICTED TO BUSINESS SIZE. The North American Industry System Classification Code is 237990, with a small business size standard in dollars of $45.0 Million. The magnitude of cost for construction is estimated between $5,000,000.00 and $10,000,000. The requirement is for five (5) years. Responses to this solicitation are due 2:00 p.m. (Central Time) on January 14, 2026. **The solicitation is downloadable from the internet only. The project specification files are PDF files and can be viewed, navigated, or printed using Adobe Acrobat Reader. Once the package is released into advertisement at this website, interested bidders may download the full package, which includes- specification and drawing files. **IMPORTANT POLICY: Contractors are REQUIRED to be registered in the System for Award Management (SAM) AT THE TIME ITS BID/PROPOSAL IS SUBMITTED to comply with the annual representations and certifications requirements. Registration can be completed free of charge at www.sam.gov. Contractors must register with sam.gov, prior to registering with the DoD Procurement Integrated Enterprise Environment (PIEE) system. Your firm must register with PIEE in order to access the solicitation and to place a bid/proposal in response to the upcoming USACE Solicitation. Use the PIEE System Registration link: ? https://piee.eb.mil and follow the instructions on their website. Request for Solicitation packages made by telephone, fax, or e-mail will not be honored. **The Point of Contract for this acquisition is Ericka Hillard at ericka.d.hillard@usace.army.mil. **Please include Solicitation number W912P626BA001 on all correspondence. ** | 64% | Awarded | Open |
** Notice of Acceptable Proposals for W912P626BA001 Dutch Gap Aquatic Ecosystem Restoration, Antioch, Lake County, Illinois (March 19, 2026): Firms with Acceptable Technical Proposals for Step-Two Bidding In accordance with Federal Acquisition Regulation (FAR) 14.503-2(b), the following firms submitted acceptable technical proposals in Step One of the two-step sealed bidding process for the solicitation referenced above. These firms are now eligible to submit priced bids in Step Two. This list is provided for the benefit of prospective subcontractors seeking to partner with the prime offerors. Offeror HGS LLS dba RES Environmental Operating Company, LLC Stantec Consulting Services Inc. V3 Construction Group, Ltd Disclaimer: This notice is for informational purposes only. The Government does not endorse or guarantee any of the firms listed. It is the responsibility of prospective subcontractors to conduct their own due diligence and to contact the firms directly to inquire about subcontracting opportunities. All procurement actions related to this notice will be conducted in accordance with the procedures outlined in the solicitation and the Federal Acquisition Regulation. ** ** EFFECTIVE JANUARY 21, 2026: The government has posted Amendment No. 0004 hereunder this Notice (please refer to the Attachments Section). ** ** EFFECTIVE JANUARY 13, 2026: The government has posted Amendment No. 0003 hereunder this Notice (please refer to the Attachments Section). ** ** Important Notice Regarding ProjNet Access for Solicitation W912P626BA001 **** It has come to our attention that some users may experience difficulties accessing the ProjNet website at projnet.org to submit questions regarding this solicitation. Our agency is aware of this technical issue and is actively working on a solution. In the meantime, vendors may access the ProjNet portal and submit questions using the following direct link: https://www.projnet.org/ProjNet/binKornHome/index.cfm. We apologize for any inconvenience this may cause and appreciate your continued interest in this U.S. Army Corps of Engineers (USACE) opportunity. **** ** EFFECTIVE JANUARY 8, 2026: The government has posted Amendment No. 0002 hereunder this Notice (please refer to the Attachments Section). ** ** EFFECTIVE DECEMBER 31, 2025: The government has posted Amendment No. 0001 hereunder this Notice (please refer to the Attachments Section). ** ** ATTENTION TO BIDDERS **************************************** PROJECT SITE VISIT JANUARY 7, 2026 ************************************ A pre-bid meeting and project site visit is scheduled for Wednesday, January 7, 2026, at 10:00 a.m. (Central Time). Interested contractors are to meet at location: Antioch, Illinois (42.480567, -88.004898), and must be supervised by USACE and the non-Federal sponsor. **************************************** PROJECT SITE VISIT JANUARY 7, 2025 ************************************ An amendment is forthcoming to incorporate the updated pre-bid meeting information. ** ** This Solicitation Notice, relates to Pre-Solicitation W912P625BA003, and is being issued by the United States Army Corps of Engineers - Chicago District for Dutch Gap Aquatic Ecosystem Restoration, Antioch, Lake County, Illinois. **PROJECT DESCRIPTION: The Dutch Gap Aquatic Complex, IL - Sec. 206 project spans 785-acres in Antioch, Lake County, Illinois, on land owned by Lake County Forest Preserves: restore stream, riparian, wetland, and buffering plant communities to provide habitat for migratory birds and local fish and wildlife. Restoration of aquatic ecosystems within the project area will reestablish hydroperiods and other hydrologic and hydraulic parameters to rehydrate former hydric soils to support critical wetland and riparian habitats. It will also reestablish native plant communities that will further diversify over time, resulting in greater quantity (acres) and quality of native plant communities. **Background: Intensive agriculture has led to the installation of drain tile networks, excavation of drainage ditches, and stream channelization, impacting natural hydrologic and other processes. Such impacts have enhanced flooding risks, minimized the amount of open space available for native plant and wildlife communities, diminished recreational opportunities, and disturbed natural processes and soils in the project area. The project area is further dominated by non-native and invasive plant species. **ACQUISITION INFORMATION: Competition for this acquisition is planned to be FULL AND OPEN, UNRESTRICTED TO BUSINESS SIZE. The North American Industry System Classification Code is 237990, with a small business size standard in dollars of $45.0 Million. The magnitude of cost for construction is estimated between $5,000,000.00 and $10,000,000. The requirement is for five (5) years. Responses to this solicitation are due 2:00 p.m. (Central Time) on January 14, 2026. **The solicitation is downloadable from the internet only. The project specification files are PDF files and can be viewed, navigated, or printed using Adobe Acrobat Reader. Once the package is released into advertisement at this website, interested bidders may download the full package, which includes- specification and drawing files. **IMPORTANT POLICY: Contractors are REQUIRED to be registered in the System for Award Management (SAM) AT THE TIME ITS BID/PROPOSAL IS SUBMITTED to comply with the annual representations and certifications requirements. Registration can be completed free of charge at www.sam.gov. Contractors must register with sam.gov, prior to registering with the DoD Procurement Integrated Enterprise Environment (PIEE) system. Your firm must register with PIEE in order to access the solicitation and to place a bid/proposal in response to the upcoming USACE Solicitation. Use the PIEE System Registration link: ? https://piee.eb.mil and follow the instructions on their website. Request for Solicitation packages made by telephone, fax, or e-mail will not be honored. **The Point of Contract for this acquisition is Ericka Hillard at ericka.d.hillard@usace.army.mil. **Please include Solicitation number W912P626BA001 on all correspondence. ** | 64% | Solicitation | 01/23/2026 |
** This Pre-Solicitation Notice is being issued by the United States Army Corps of Engineers- Chicago District to inform interested vendors of the district?s intent to issue a solicitation for Dutch Gap Aquatic Ecosystem Restoration, Antioch, Lake County, Illinois. **PROJECT INFORMATION: Under the requirement, USACE requires the following construction services at the Dutch Gap Aquatic Complex, IL - Sec. 206 project spans 785-acres in Antioch, Lake County, Illinois, on land owned by Lake County Forest Preserves: restore stream, riparian, wetland, and buffering plant communities to provide habitat for migratory birds and local fish and wildlife. Restoration of aquatic ecosystems within the project area will reestablish hydroperiods and other hydrologic and hydraulic parameters to rehydrate former hydric soils to support critical wetland and riparian habitats. It will also reestablish native plant communities that will further diversify over time, resulting in greater quantity (acres) and quality of native plant communities. **Background: Intensive agriculture has led to the installation of drain tile networks, excavation of drainage ditches, and stream channelization, impacting natural hydrologic and other processes. Such impacts have enhanced flooding risks, minimized the amount of open space available for native plant and wildlife communities, diminished recreational opportunities, and disturbed natural processes and soils in the project area. The project area is further dominated by non-native and invasive plant species. **ACQUISITION INFORMATION: Competition for this acquisition is planned to be FULL AND OPEN, UNRESTRICTED TO BUSINESS SIZE. The North American Industry System Classification Code is 237990, with a small business size standard in dollars of $45.0 Million. The magnitude of cost for construction is estimated between $5,000,000.00 and $10,000,000. The requirement is for five (5) years. The solicitation package is planned for advertisement Fourth Quarter Fiscal Year 2025 and bids are planned to be opened in the First Quarter of Fiscal Year 2026. **The solicitation will be downloadable from the internet only. The project specification files are PDF files and can be viewed, navigated, or printed using Adobe Acrobat Reader. Once the package is released into advertisement at this website, interested bidders may download the full package, which includes- specification and drawing files. **IMPORTANT POLICY: Contractors are REQUIRED to be registered in the System for Award Management (SAM) AT THE TIME ITS BID/PROPOSAL IS SUBMITTED to comply with the annual representations and certifications requirements. Registration can be completed free of charge at www.sam.gov. Contractors must register with sam.gov, prior to registering with the DoD Procurement Integrated Enterprise Environment (PIEE) system. Your firm must register with PIEE in order to access the solicitation and to place a bid/proposal in response to the upcoming USACE Solicitation. Use the PIEE System Registration link: ? https://piee.eb.mil and follow the instructions on their website. Request for Solicitation packages made by telephone, fax, or e-mail will not be honored. **The Point of Contract for this acquisition is Ericka Hillard at ericka.d.hillard@usace.army.mil.**Please include Solicitation number W912P625BA003 on all correspondence. ** | 64% | Pre-Solicitation | Open |
SOURCES SOUGHT NOTICEUPPER MISSISSIPPI RIVER RESTORATION (UMRR) POOL 12 FLOODPLAIN FOREST STAGE ONE (1) - HABITAT REHABILITATION AND ENHANCEMENT PROJECT (HREP) THIS IS A SOURCES SOUGHT AND IS FOR INFORMATIONAL/MARKET RESEARCH PURPOSES ONLY. THIS IS NOT A REQUEST FOR PROPOSAL, QUOTATION OR BID, NOR A SYNOPSIS OF A PROPOSED CONTRACT ACTION UNDER FAR SUBPART 5.2.The U.S. Army Corps of Engineers, Rock Island District, is seeking construction businesses that can perform the requirement based on the description provided. (Specification, Plan Set, and as built drawing to be provided at the solicitation phase).Please read the full document, description and/or scope of work in its entirety. This announcement is for information and planning purposes only and is not to be construed as a commitment by the Government, implied or otherwise, to issue a solicitation or make a contract award. NO AWARD will be made from this Sources Sought Notice. This is NOT a request for proposals, quotes or invitation for bids. The sole purpose of this notice is to identify potential System for Award Management (SAM) Database registered construction businesses that are interested and capable of performing this work. To download this Sources Sought and drawings associated with this requirement click the link provided at the link/attachments section below. | 61% | Market Research | 12/02/2026 |
Additional Details
Solicitation Number
123C7818B0002
Archive Date
Jun 7, 2018