GovChime
Notice ID: 95d74232974f4e468cfd8f9d5b3b3a41Solicitation

SPACE RENOVATION - LAB 125,126,130 AND 229 - BYRON, GA

Archived on September 10, 2022. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
3:00 PM UTC−05:00
Posted
August 17, 2022
Notice type
Solicitation
Set-aside
Small Business Set Aside - Total
NAICS
236220: Commercial and Institutional Building Construction
Agency
Department of AgricultureAGRICULTURAL RESEARCH SERVICE

Notice details

Office
USDA ARS SEA AAO ACQ/PER PROP
Place of performance
Byron, GA, 31008
Last updated
Sep 25, 2026

Identifiers

Solicitation number
12405B22R0022
Notice ID
95d74232974f4e468cfd8f9d5b3b3a41

Description

AMENDMENT 01 - Questions and Answers The USDA, Agricultural Research Service (ARS) Southeast Area (SEA) Southeastern Fruit and Tree Nut Research Laboratory, located in Byron, GA., has a requirement (subject to the availability of funds) to Renovate Lab Space in Lab 125,126,130 and 229. The work includes but is not limited to: The contractor shall furnish all supervision, labor, materials, and equipment and perform all work necessary to remove existing casework, counter tops, electrical and plumbing fixtures and properly dispose of. The contractor shall install new casework, electrical, gas and plumbing fixtures. The contractor shall furnish all labor and materials for the described project in strict conformity with safety, standards, laws, statutes, and ordinances for a chemical/biological research laboratory biosafety level 2 (BSL2) in a federal facility. The work consists of and is not limited to providing all supervision, labor, materials, supplies, equipment, quality assurance and other related services and materials as required to: Removal of fume hoods in labs 125, 130 & 229. Fume Hoods are a Presumed Asbestos Containing Material (PACM). Removal must be done by a certified asbestos abatement tech and without disassembling. Once Fume Hood is removed, must be wrapped in two layers of 6 mil plastics and then disposed of as asbestos containing material (ACM). Demolition and removal of all casework. The contractor is responsible for locating and completely shutting off gas, water and electrical during this phase. All that can be recycled shall be recycled and weight recorded. Some demolition and removal of ceiling tiles and ceiling grid around fume hoods in labs 125, 130 and 229. The contractor shall provide and install all new lower cabinets, upper cabinets, sink cabinet, knee space assemblies, countertops, sinks, fixtures, electrical outlets and any fillers or scribes necessary for complete installation. This shall include final connections of any mechanical, gas, plumbing and electrical. All counter tops shall be 1” black phenolic resin worktop and Greengard certified – similar or exceed specifications of FunderMax RE-Technology (see attached brochure). A 6” high applied backsplash of same material as countertop. Will include sinks, outlets, pegboard, 30"w. x 30"h. w/46 Pegs & Drip Trough, cup sinks and some fabrication The contractor shall re-install undamaged ceiling grid and tiles or install new ceiling grid and tiles where applicable in rooms 125, 130 and 229. Water saver service fixtures and fittings to include H & CW faucets, H/C mixing faucet, DI faucet, pre- rinse hose unit, and deck mounted AGV service valves and required mounting hardware. All valves will be mounted in original locations unless specified otherwise. Wall mounted single channel electrical raceway, wiring, outlets and cover plates. Must be installed in accordance with the most recent National Electrical Code (NEC). If an equivalent metal wire mold is going to be used, its use must first be pre-approved.. Cove Base moldings shall be removed from walls and new installed on walls and base cabinets. Moldings shall be black Please refer to Section L.7 (b) of the attached Clauses and Provisions for site visit information.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Huron W. Virden

Documents

No documents available.

Lifecycle

Solicitation:12405B22R0022
  1. Pre-Solicitation
  2. Solicitation

Award typically follows within 30–90 days after the response deadline. (estimate)

  1. Pre-SolicitationJul 11, 2022

    SPACE RENOVATION - LAB 125, 126, 130, AND 229 - BYRON, GA

    Notice 7a7e797ac6c04cc782dcd63dbd374252 on SAM.gov

  2. 2×
    SolicitationCurrentJul 27, 2022

    SPACE RENOVATION - LAB 125,126,130 AND 229 - BYRON, GA

    Notice 95d74232974f4e468cfd8f9d5b3b3a41 on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

12405B22R0022

Archive Date

Sep 10, 2022

Office Address

STONEVILLE, MS, 38776