GovChime
Notice ID: a5f10167653f49b98e6b738a729a8b2dCombined Synopsis/SolicitationArchived

Amended-Colville National Forest -GAOA Sullivan Lake Swim Dock Replacement

Archived on March 20, 2026. Original response deadline: . Full description on SAM.gov.

Overview

Response deadline
11:00 PM PDT
Posted
March 19, 2026
Notice type
Combined Synopsis/Solicitation
Set-aside
Total Small Business Set-Aside (FAR 19.5)
Agency
Department of AgricultureFOREST SERVICE

Notice details

Office
USDA-FS, CSA NORTHWEST 2
Place of performance
Metaline Falls, Washington, 99153
Last updated
Nov 1, 2026
First published
Last updated on SAM.gov

Identifiers

Solicitation number
1240BD26Q0003
Notice ID
a5f10167653f49b98e6b738a729a8b2d

Description

Amendment 1 -3/19/2026

The purpose of this amendment is to cancel Solicitation 1240BD26Q0003 in its entirety effective 19 March 2026. The Government has determined that changes to the requirement are necessary and are substantial enough to warrant a new competition. No award will be made under this solicitation. A new solicitation incorporating the revised specifications will be posted to SAM.gov shortly. All interested parties, including previous quoters, are encouraged to participate in the new requirement.

Requirement Overview
The U.S. Department of Agriculture (USDA), Forest Service, Colville National Forest (CNF), has a requirement for the Great American Outdoors Act (GAOA). This is a firm-fixed-price, non-personal services contract for the removal and disposal of an existing swim dock and the furnishing and installation of a new replacement swim dock at the Sullivan Lake Campground in Metaline Falls, WA.

Project Scope
The contractor shall provide all labor, materials, equipment, and supervision to perform the following:

  1. Removal & Disposal: Complete removal of the existing swim dock (currently on dry ground) and off-site disposal at a legal waste facility in accordance with Washington State regulations.
  2. New Dock Installation: Furnishing, transporting, and anchoring a new swim dock designed for seasonal water level fluctuations and high-wind conditions.

Salient Characteristics

  • Dimensions: Minimum 15’x15’ to Maximum 16’x16’.
  • Construction: Marine-grade aluminum or galvanized steel frame with encapsulated foam flotation.
  • Decking: Non-slip composite (light grey or cedar tone) with black dock edging.
  • Safety Features: 4-to-5 step detachable swim ladder; flush coupling systems with rubber covers (if delivered in sections).
  • Anchoring: Flexible chain/fastener system for rocky/sand bottom (approx. 30ft depth) capable of withstanding peak wind events.
  • Lighting: Solar-powered LED lights on each corner.
  • Freeboard: 12” to 18” under dead load.

Period of Performance

  • Estimated Start: April 2026
  • Completion Date: No later than September 1, 2026.
  • Coordination: Installation must be coordinated with the Contracting Officer’s Representative (COR) to align with optimal water levels.

Place of Performance
Sullivan Lake Campground, Metaline Falls, WA 99153.

Solicitation Details
This solicitation is issued as a Combined Synopsis/Solicitation. All responsible sources may submit a quotation which shall be considered by the agency. Vendors must be registered in the System for Award Management (SAM) to be eligible for award. Invoices must be submitted via the Invoice Processing Platform (IPP).

See attachments for details.

Full description on SAM.gov

Award Overview

No prior contract identified

No prior award matched this notice's agency, NAICS, place of performance and PSC within 18 months. It may be a new requirement.

Contacts

Contracting Officer

Primary Contact

Documents

Files (3)

  • Amendment 1_SF30_1240BD26Q0003.pdf

    244 KBAdded in Combined Synopsis/Solicitation version 3Posted
    Download
  • Attachment 1_PWS_DOCK_2.18.26.pdf

    3.5 MBAdded in Combined Synopsis/Solicitation version 1Posted
    Download
  • RFQ_CSS_1240BD26Q0003_SullivanLakeDock.pdf

    414 KBAdded in Combined Synopsis/Solicitation version 1Posted
    Download

Lifecycle

  1. 1
    Version 1Combined Synopsis/SolicitationArchived

    Colville National Forest -GAOA Sullivan Lake Swim Dock Replacement

    Notice ccd43bdc2c7246e2a8620eb8eabeb03f on SAM.gov

  2. 3
    Version 3Combined Synopsis/SolicitationArchivedCurrent

    Amended-Colville National Forest -GAOA Sullivan Lake Swim Dock Replacement

    Notice a5f10167653f49b98e6b738a729a8b2d on SAM.gov

Similar Opportunities

Title
Match
Phase
Deadline

Additional Details

Solicitation Number

1240BD26Q0003

Archive Date

Mar 20, 2026

Office Address

Portland, OR, 972042829